Your factory, live in under an hour. Start a 90-Day Guided Pilot.

Request a Demo →
Q

Popup

Guided pilot

  • Products
    • All solutions
    • Core Solutions
      • PerfTrak
      • QualTrak
      • PaceTrak
      • ProcessTrak
    • Complementary Solutions
      • MoniTrak
      • Machine Learning
    • Variants
      • PerfTrak OPC UA
  • Industries
    • Automotive & Mobility
    • Aerospace, Defense & Naval
    • Food & Beverage
    • Pharma, Cosmetics & Medical
    • Electronics & Electrical
    • Building Materials, Glass & Mineral
  • Why TEEPTRAK
  • Resources
    • Learn
      • Resource Library
      • Understanding OEE
      • Blog
      • FAQ
    • Proof
      • Our Customers
    • Tools & Community
      • ROI calculator
      • TEEPTRAK Academy
      • Events
      • Become a Partner
      • Podcast
  • About
    • About Us
    • Careers
    • Contact
    • News
  • English
    • French
    • Chinese
    • German
    • Spanish
    • Dutch
    • Hungarian
    • Italian
    • Polish
REQUEST A DEMO
Short stops and the manual log: size your TPM and lean priorities before choosing a productivity strategy

Short stops and the manual log: size your TPM and lean priorities before choosing a productivity strategy

by Alyssa Fleurette | Nov 3, 2026 | Lean Manufacturing

This article is for plant managers, production managers, continuous improvement and maintenance leaders who have to decide where the next productivity effort goes: a TPM push, a lean program, training, or new equipment. Each of those choices commits people and budget...
SMED in high-mix plants: standardizing changeovers by product family

SMED in high-mix plants: standardizing changeovers by product family

by Alyssa Fleurette | Nov 2, 2026 | Lean Manufacturing

This article is for production managers, manufacturing engineers, continuous improvement leaders and plant managers who run high-mix lines: several formats, materials or tool sets on the same equipment. On these lines a single SMED standard does not hold, because a...
A changeover matrix built from measured changeover times: what sequencing learns from the line

A changeover matrix built from measured changeover times: what sequencing learns from the line

by Alyssa Fleurette | Nov 2, 2026 | Lean Manufacturing

This article is for production managers, schedulers, production planners and methods and continuous improvement leads who want to make changeovers not only faster but also better planned. It explains why changeover time depends on the order of jobs, how to build a...
Kaizen event results: proving the gain machine by machine with stop data

Kaizen event results: proving the gain machine by machine with stop data

by Alyssa Fleurette | Nov 2, 2026 | Lean Manufacturing

This article is for plant managers, production managers, continuous improvement leads and maintenance managers who run or sponsor kaizen events and then have to answer a simple question a month later: did the gain actually happen, and on which machines? It explains...
Daily production meeting: 15 minutes with yesterday’s downtime data

Daily production meeting: 15 minutes with yesterday’s downtime data

by Alyssa Fleurette | Nov 2, 2026 | Lean Manufacturing

This article is for plant managers, production managers, shop floor supervisors and continuous improvement leads who run, or sit through, a production meeting every morning. It sets out a 15 minute format built on one raw material: yesterday’s downtime data....
Value stream mapping with measured machine data: filling in the data boxes

Value stream mapping with measured machine data: filling in the data boxes

by Alyssa Fleurette | Nov 2, 2026 | Lean Manufacturing

This article is for plant managers, production managers and continuous improvement, lean, industrial engineering and maintenance leads who are planning or revisiting a value stream map in manufacturing. The method is well known. The weak point is usually the numbers:...
« Older Entries
Next Entries »
TeepTrak
Book a call
Products
All SolutionsPerfTrak - Real-time OEEQualTrak - QualityPaceTrak - Cycle timesProcessTrak - ProcessMoniTrak - KPIsMachine Learning
Resources
Understanding OEEOEE White PaperCase StudiesROI CalculatorTEEPTRAK AcademyBlogFAQ
Company
About TEEPTRAKOur CustomersCareersEventsBecome a PartnerContact UsRequest a Demo
Paris - Headquarters

155 boulevard Vincent Auriol
75013 Paris, France
+33 6 40 63 26 73

Chicago - Sales Office

116 W Hubbard St #501
Chicago, IL 60654, USA
+1 312 698 3065

Shenzhen - Sales Office

Office 426, Building 2, Xinghui Technology Park
Bao'an, Shenzhen, China
+86 189 4831 0588

Bucharest - Romania Office

Bulevardul Iuliu Maniu 6L
061103 Bucharest, Romania
+40 725 973 451

© 2026 TEEPTRAK SAS. All rights reserved. · 粤ICP备19018741号Terms of SalePrivacy policyData Protection (GDPR)
90-DAY GUIDED PILOT

See where your OEE really goes.

We put a TEEPTRAK engineer on one of your lines, instrument it, and measure it with your team. A signed baseline, a weekly review, a decision date set up front. The commitment isn't to buy. It's to measure.

700+ factories · 30+ countries · 4.7/5 on G2 & Capterra

Request a demo