Free 60-day POC — one pilot line. If we don't find 10% hidden losses, you pay nothing. Get started →
PaceTrak

See every slow cycle.
Gain +18% throughput.

PaceTrak measures real cycle times against takt on manual and semi-manual stations — automatically. It spots the bottleneck and gives your IE team the data to rebalance the line.

Station-by-station capture — real cycles, not stopwatch studies
Takt adherence live — bottleneck visible the moment it forms
Line-balancing insight — data your IE team can act on the same week
450+ factories · 30+ countries · 4.7/5 on G2 & Capterra
THROUGHPUT — 12 WEEKS+18%since PaceTrak go-live
74%
OEE74.2%▲ 2.4 pts
LIVE
Availability88.2%▲ 1.1
Performance91.5%▼ 0.6
Quality97.1%▲ 0.3
Machine timeline · live
RunningStoppedSlow
Top stop causes · today
Tooling
Material
Micro-stops
Setup
Misfeed
!Cycle over takt — 14:32
Station 20 · 72s vs 58s takt · bottleneck for 25 min

PaceTrak runs in plants of

stellantisalstomthalesgroupsafranvaleosaint-gobaindanonecontinentalhutchinson
Why PaceTrak

Your manual lines hide their bottleneck. PaceTrak shows it in real time.

Measure

Real cycle times, captured automatically

No stopwatch studies, no observer effect, no sampling bias. PaceTrak records every cycle on every station, all shift long — including the drift that never shows up in a 20-minute study.

Spot

The bottleneck, the moment it forms

Takt adherence by station, live. When station 20 starts running 14 seconds over takt, you see it at 09:30 — not in next month's throughput report.

Rebalance

Data your IE team can act on

Cycle distributions, station loading and minutes-over-takt Paretos — the exact evidence needed to rebalance tasks, justify a fixture or re-staff a shift. Same week, not next quarter.

Operating principle

How PaceTrak works

Three steps between a manual station and a balanced line.

1

Equip the stations

A simple cycle signal per station — button, sensor or existing signal. No PLC program changes, no process disruption.

Operator button Sensor Existing signal
< 1 hour per station
2

Cycles measured against takt

Every cycle is timed and compared to the standard, automatically. Operators keep working — there is nothing extra to do at the station.

Zero operator burden
3

Supervise & rebalance

Live takt adherence, bottleneck detection, cycle distributions and minutes-over-takt Paretos — with APIs for your BI and IE tools.

Station → line → plant
Product in action

The line-balancing platform, exactly as your team will see it




Every station, against takt, live

Walk the line — or open a browser anywhere — and see each station's current cycle vs takt, updated in real time.

Cycle vs takt by station, refreshed live
Drill down: plant → line → station → cycle
Spot the forming bottleneck before it eats the shift
Live line view — Assembly 1LIVE
St. 10 — prep
55s
St. 20 — assembly
72s
St. 30 — control
52s
St. 40 — packing
61s
Current status
● 3 on takt
● 1 over takt — St. 20 · +14s

The bottleneck Pareto that builds itself

Every cycle feeds the analysis. By Friday you know exactly which stations cost you capacity this week — and how much.

Minutes over takt by station, any period
Cycle distributions — spot drift and variation
Export to Excel or feed your BI via API
Minutes over takt — week 24 · Assembly 1
St. 20 — assembly
3.1h
St. 40 — packing
1.7h
St. 10 — prep
0.9h
St. 30 — control
0.5h
Insight: station 20 = 50% of capacity loss this week. Moving one sub-task to station 30 ≈ +9% line throughput.

Shift reports, written automatically

Output vs target, takt adherence and top capacity losses — compiled and sent at end of shift. No more Sunday-night Excel.

Automatic output & adherence reports
Performance history by station, line, team
Evidence base for kaizen and rebalancing
Shift report — morning · auto-generated 14:05
Output412
Target450
Adherence91%
BottleneckSt. 20
Takt adherence — last 10 shifts
target 95%
Sent automatically to: production manager · line leaders · IE team

Know the moment the line falls off takt

Configurable alerts to any smartphone — station over takt, adherence under threshold, output behind plan. React in minutes, not at the morning meeting.

Instant push alerts on takt deviation
Thresholds per station, line or product
Escalation rules — leader → supervisor → manager
TeepTrak mobileLIVE
Over takt — St. 20 · Assembly 1
14:32 · 72s vs 58s · 25 min running
Output behind plan — Assembly 1
14:18 · 412 vs 450 target
Back on takt — St. 40
13:55 · 58s avg · shift on track
Built for the shop floor

Nothing extra for your operators. Everything for your IE team.

PaceTrak measures cycles automatically — operators just work. When a station runs over takt, the line leader can qualify why in two taps: missing parts, complexity, training. Context your IE team can use.

Automatic by default — cycles timed with zero operator input
Optional qualification — two taps to tag why a station slipped
Works with gloves — big targets, high contrast, rugged tablets
PaceTrak · Assembly 1 · St. 20OVER TAKT — +14 s
Why is the station over takt?
Missing parts
Complex variant
New operator
Tool issue
Rework
Other
Tap 1 of 2 — confirm to finishConfirm ✓
Optional flow for line leaders: tap the cause → tap confirm. Done.
Quick & easy

Installed in five steps — without stopping the machine

Equip the stations

Compact module per station — cabinet or external box

Pick your cycle signal

Operator button, sensor or existing 0–24V signal

Position the line display

Takt board at the line (tablet optional for leaders)

Configure

Products, takt times and station standards

Start tracking

Every cycle measured against takt, from minute one

Typical install: under 1 hour per station — no production stop, no PLC modification, no IT project.
Make the business case

How much capacity are slow cycles costing you?

Drag the sliders. Estimate based on a conservative +10% throughput gain — PaceTrak customers reach +18%.





Recoverable value = lines × hours × value per hour × 10% throughput gain. Conservative vs. customer average.
Estimated recoverable capacity
$640k

per year, at +10% throughput

1,600 line-hours of capacity back

Find my lost capacity →
One product, three ways to run it

Choose your PaceTrak

Standalone

PaceTrak

Cycle capture, takt adherence and bottleneck analytics on the manual lines you choose — independent of any other system.

With PerfTrak

PaceTrak + PerfTrak

Manual stations and machines on the same dashboards: OEE, stops and cycle times side by side, with one login for the whole line.

Connected BI

PaceTrak API

Feed cycle data, adherence and Paretos straight into your BI or IE tools via standard APIs — PaceTrak measures, your systems analyse.

Customer results

The results our customers see every day

+18%throughput on manual lines
0stopwatch studies needed
450+factories run TeepTrak
4.7/5on G2 & Capterra

"Quickly adopted by all our production lines thanks to its intuitive interface and clear, real-time dashboards. Operators use it daily for short-interval control."

Alex M.Production Manager · USA, 51–200 employees

"Real-time OEE tracking and stoppage capture at 3 sites. Fast deployment, operator-friendly interface, clear loss trees, actionable alerts, easy BI exports and APIs."

Laure P.Operations · Germany, 101–500 employees

"Deployed on all our automated equipment. Strong adoption by operators, elimination of paper and Excel, rapid OEE gains on micro-stops and team organization."

Manuel R.Continuous Improvement · France, 1,001–5,000 employees
Plays well with your stack

Your data, wherever you need it

Standard APIs and raw-data access. Feed your BI, your ERP, your data lake.

SAPOraclePower BITableauExcel exportREST APIOPC UA
Questions

Frequently asked questions

Yes — that's what it's built for. A simple cycle signal per station (operator button, sensor or an existing signal) is enough. No PLC, no machine required.
No. Stations are equipped without stopping the line, and configuration is done on the platform. A station is typically live in under an hour.
No — cycle capture is automatic. Operators just work. Qualifying why a station slipped is optional, takes two taps, and is usually done by the line leader.
A study samples a few hours once, with an observer changing behaviour. PaceTrak measures every cycle, every shift, permanently — drift, variation and bottlenecks included. Your IE team works from complete data, not snapshots.
The bottleneck is usually visible on day one. Most lines find a first rebalancing opportunity within two weeks — customers average +18% throughput on manual lines.
One pilot line, fully equipped — hardware, platform, onboarding. If we don't surface significant recoverable capacity in 60 days, you pay nothing.

See your hidden capacity — on your lines, with your numbers

A 30-minute working session with a TeepTrak engineer. We'll map your station loading and show you PaceTrak running on cycles like yours.

Zero-risk POC: one pilot line, fully equipped, free for 60 days. If we don't surface significant recoverable capacity, you pay nothing.
450+ factories · 30+ countries · 4.7/5 on G2 & Capterra

Book my demo

Or start the free 60-day POC — mention it in the goals field.

Request a demo

Your data is protected under GDPR & CCPA