A single plant can improve OEE with energy and attention. A network of plants needs a system. This playbook covers the four things that decide whether a multi-site OEE program scales or stalls: standard definitions, governance, Group reporting from day one, and a...
Before a COO signs off on a new line, there is a cheaper question to answer: how much capacity is already trapped inside the assets you own? For most plants the hidden factory is 30 to 45 percent, and recovering even part of it defers the next capital project by...
Every point of lost overall equipment effectiveness traces back to one of six categories of waste. The Six Big Losses are the shared language that turns a vague OEE number into a list of specific, fixable problems. This guide maps each loss to its OEE factor, the data...
In aerospace and defense, the line is low-volume and high-mix, cycle times are long, and AS9100 demands traceability on every part. That mix hides a trap: a CNC cell can look busy all shift and still run a poor overall equipment effectiveness. This guide shows an...
A 60-day pilot on a single line is the fastest way to replace opinion with evidence. It connects to one constraint line, surfaces the first real losses within two weeks, and proves a measurable OEE gain before any wider commitment. This playbook lays out the eight...
The losses that hurt most are the ones nobody records. Short stops, small speed reductions and quiet scrap rarely appear on a downtime report, yet together they can cost a fifth of a line's capacity. This guide shows how to find them, quantify them and recover...
We put a TeepTrak engineer on one of your lines, instrument it, and measure it with your team. A signed baseline, a weekly review, a decision date set up front. The commitment isn't to buy. It's to measure.
450+ factories · 30+ countries · 4.7/5 on G2 & Capterra