TL;DR · OEE formula in 60 words The OEE formula per ISO 22400-2:2014 has 5 steps: (1) measure Planned Production Time, (2) compute Availability = Run Time / PPT, (3) compute Performance = (Theoretical cycle × Total count) / Run Time, (4) compute Quality = Good count /...
TL;DR · OEE calculation in 60 words OEE = Availability × Performance × Quality, per ISO 22400-2:2014. Top quartile manufacturing reaches 78-92% OEE. Hutchinson Group raised OEE from 42% to 75% across 40 sites using Six Big Losses framework (Nakajima 1988). Compute...
Availability, Performance, Quality: how are the three OEE components defined? Last verified: 16 May 2026. Overall Equipment Effectiveness (OEE) is the product of three components: Availability, Performance, and Quality. Each is independently defined in ISO...
What are the Six Big Losses and how do they map to OEE? Last verified: 16 May 2026. The Six Big Losses are a categorization of production losses introduced by Seiichi Nakajima in Introduction to TPM: Total Productive Maintenance (Productivity Press, 1988, ISBN...
What is TEEP and when should it be used instead of OEE? Last verified: 16 May 2026. Total Effective Equipment Performance (TEEP) is a manufacturing performance metric that measures actual production output against calendar time, rather than against planned production...
What is OEE and how is it calculated under ISO 22400? Last verified: 16 May 2026. Overall Equipment Effectiveness (OEE) is a manufacturing performance metric defined as the product of Availability, Performance, and Quality. The concept was introduced by Seiichi...
We put a TeepTrak engineer on one of your lines, instrument it, and measure it with your team. A signed baseline, a weekly review, a decision date set up front. The commitment isn't to buy. It's to measure.
450+ factories · 30+ countries · 4.7/5 on G2 & Capterra