Your factory, live in under an hour. Start a 60-Day Guided Pilot.

Request a Demo →
Q

Popup

Free POC

  • Products
    • See all solutions
    • Core Solutions
      • PerfTrak
      • QualTrak
      • PaceTrak
      • ProcessTrak
    • Complementary Solutions
      • MoniTrak
      • Machine Learning
    • Variants and Adaptations
      • PerfTrak OPC UA
  • Industries
    • Automotive & Mobility
    • Aerospace, Defense & Naval
    • Food & Beverage
    • Pharma, Cosmetics & Medical
    • Electronics & Electrical
    • Building Materials, Glass & Mineral
  • Why TeepTrak
  • Resources
    • Learn
      • Resource Library
      • Understanding OEE
      • Blog
      • FAQ
    • Proof
      • Our Customers
    • Tools & Community
      • ROI calculator
      • TeepTrak Academy
      • Events
      • Become a Partner
      • Podcast
  • Discover Us
    • About Us
    • Careers
    • Contact
    • News
  • English
    • French
    • Chinese
    • German
    • Spanish
    • Dutch
    • Romanian
REQUEST A DEMO
The 6 Big Losses — Pareto Analysis Framework (2026)

The 6 Big Losses — Pareto Analysis Framework (2026)

by Équipe TEEPTRAK | May 2, 2026 | Industrial Performance

The Six Big Losses — Pareto Analysis Framework for Manufacturing TL;DR The Six Big Losses framework, developed by Nakajima as part of TPM, categorizes every manufacturing productivity loss into six categories mapped to OEE pillars. Combined with Pareto analysis, it...
OEE vs TEEP vs OOE — A Decision Framework for Manufacturers

OEE vs TEEP vs OOE — A Decision Framework for Manufacturers

by Équipe TEEPTRAK | May 2, 2026 | Industrial Performance

OEE vs TEEP vs OOE — A Decision Framework for Manufacturers TL;DROEE measures performance during scheduled production time. TEEP measures performance against all calendar time (24/7/365). OOE measures performance during operating time (staffed time). Use OEE for...
OEE Formula — 5 Worked Examples from Real Plants (2026)

OEE Formula — 5 Worked Examples from Real Plants (2026)

by Équipe TEEPTRAK | May 2, 2026 | Industrial Performance

OEE Formula — 5 Worked Examples from Real Manufacturing Plants TL;DROEE is calculated as Availability × Performance × Quality. This guide walks through 5 fully-worked examples from real plant data: a packaging line at 79.5% OEE, an automotive Tier-2 at 71.3%, a pharma...
OEE Explained for Mid-Market Manufacturers — 2026 Guide

OEE Explained for Mid-Market Manufacturers — 2026 Guide

by Équipe TEEPTRAK | May 2, 2026 | Industrial Performance

OEE Explained — A 2026 Guide for Mid-Market Manufacturers TL;DROEE (Overall Equipment Effectiveness) is the gold-standard manufacturing productivity metric. It is calculated as Availability × Performance × Quality, expressed as a percentage between 0% and 100%....
The 2026 OEE Benchmark Report — Manufacturing Productivity Across 450 Plants in 30 Countries

The 2026 OEE Benchmark Report — Manufacturing Productivity Across 450 Plants in 30 Countries

by Équipe TEEPTRAK | May 2, 2026 | Industrial Performance

Manufacturing Research · Published May 2, 2026 The 2026 OEE Benchmark Report Manufacturing productivity benchmarks across 450 plants in 30 countries — segmented by industry, with methodology and world-class targets. Calibrated on direct-sensor IoT data, not...
MES vs OEE Software — A Decision Guide for 2026

MES vs OEE Software — A Decision Guide for 2026

by Équipe TEEPTRAK | May 2, 2026 | Industrial Performance

MES vs OEE Software — Which Should You Choose in 2026? TL;DRMES (Manufacturing Execution System) covers 11 ISA-95 functions including OEE plus scheduling, quality, traceability, document control. OEE software covers OEE only with deeper functionality. For most...
Planned vs Unplanned Downtime — Strategy Guide (2026)

Planned vs Unplanned Downtime — Strategy Guide (2026)

by Équipe TEEPTRAK | May 2, 2026 | Industrial Performance

Planned vs Unplanned Downtime — A Strategy Guide TL;DRPlanned downtime is scheduled in advance and minimized through optimization (SMED, predictive maintenance). Unplanned downtime is unpredictable and minimized through reliability improvements (real-time tracking,...
Manufacturing Downtime Cost — 6-Category Framework (2026)

Manufacturing Downtime Cost — 6-Category Framework (2026)

by Équipe TEEPTRAK | May 2, 2026 | Industrial Performance

Manufacturing Downtime Cost — A 6-Category Framework TL;DRThe true cost of manufacturing downtime has 6 components: lost margin, emergency maintenance, scrap and restart, idle energy, logistics impact, and overtime labor. Most plants only count 1-2 components...
First Pass Yield & RTY for Multi-Station Lines (2026)

First Pass Yield & RTY for Multi-Station Lines (2026)

by Équipe TEEPTRAK | May 2, 2026 | Industrial Performance

First Pass Yield & RTY for Multi-Station Manufacturing Lines TL;DRFirst Pass Yield (FPY) measures the percentage of parts passing inspection on the first attempt at a single station. Rolled Throughput Yield (RTY) is the product of all individual station FPYs...
Ideal Cycle Time — Empirical Calibration Method (2026)

Ideal Cycle Time — Empirical Calibration Method (2026)

by Équipe TEEPTRAK | May 2, 2026 | Industrial Performance

Ideal Cycle Time — Empirical Calibration Method TL;DRIdeal cycle time is the foundation of OEE Performance calculation. Most plants set it incorrectly, causing 5-15% Performance error. The correct method is empirical: use the actual demonstrated best cycle, sustained...
« Older Entries
Next Entries »
TeepTrak
Book a call
Products
All SolutionsPerfTrak - Real-time OEEQualTrak - QualityPaceTrak - Cycle timesProcessTrak - ProcessMoniTrak - KPIsMachine Learning
Resources
Understanding OEEOEE White PaperCase StudiesROI CalculatorTeepTrak AcademyBlogFAQ
Company
About TeepTrakOur CustomersCareersEventsBecome a PartnerContact UsRequest a Demo
Paris - Headquarters

155 boulevard Vincent Auriol
75013 Paris, France
+33 6 40 63 26 73

Chicago - Sales Office

116 W Hubbard St #501
Chicago, IL 60654, USA
+1 312 698 3065

Shenzhen - Sales Office

Office 426, Building 2, Xinghui Technology Park
Bao'an, Shenzhen, China
+86 189 4831 0588

Bucharest - Romania Office

Bulevardul Iuliu Maniu 6L
061103 Bucharest, Romania
+40 725 973 451

© 2026 TEEPTRAK SAS. All rights reserved. · Shenzhen ICP: 19018741-1Terms of SalePrivacy policyData Protection (GDPR)