Your factory, live in under an hour. Start a 60-Day Guided Pilot.

Request a Demo →
Q

Popup

Free POC

  • Products
    • See all solutions
    • Core Solutions
      • PerfTrak
      • QualTrak
      • PaceTrak
      • ProcessTrak
    • Complementary Solutions
      • MoniTrak
      • Machine Learning
    • Variants and Adaptations
      • PerfTrak OPC UA
  • Industries
    • Automotive & Mobility
    • Aerospace, Defense & Naval
    • Food & Beverage
    • Pharma, Cosmetics & Medical
    • Electronics & Electrical
    • Building Materials, Glass & Mineral
  • Why TeepTrak
  • Resources
    • Learn
      • Resource Library
      • Understanding OEE
      • Blog
      • FAQ
    • Proof
      • Our Customers
    • Tools & Community
      • ROI calculator
      • TeepTrak Academy
      • Events
      • Become a Partner
      • Podcast
  • Discover Us
    • About Us
    • Careers
    • Contact
    • News
  • English
    • French
    • Chinese
    • German
    • Spanish
    • Dutch
    • Romanian
REQUEST A DEMO
How to calculate OEE for industrial production (2026): ISO 22400-2, Nakajima Six Big Losses, formula + free calculator

How to calculate OEE for industrial production (2026): ISO 22400-2, Nakajima Six Big Losses, formula + free calculator

by Équipe TEEPTRAK | May 17, 2026 | Uncategorized

TL;DR — OEE calculation in 60 words OEE = Availability × Performance × Quality, per ISO 22400-2:2014. Top quartile manufacturing reaches 78-92% OEE. Hutchinson Group raised OEE from 42% to 75% across 40 sites using Six Big Losses framework (Nakajima 1988). Compute...
What is Industry 4.0 and how is it different from earlier industrial revolutions?

What is Industry 4.0 and how is it different from earlier industrial revolutions?

by Équipe TEEPTRAK | May 17, 2026 | Uncategorized

What is Industry 4.0 and how is it different from earlier industrial revolutions? Last verified: 16 May 2026. Industry 4.0 (German: Industrie 4.0) is the fourth industrial revolution, characterized by cyber-physical systems, Internet of Things, cloud computing, and...
What is Lean Manufacturing and where did the term come from?

What is Lean Manufacturing and where did the term come from?

by Équipe TEEPTRAK | May 17, 2026 | Uncategorized

What is Lean Manufacturing and where did the term come from? Last verified: 16 May 2026. Lean Manufacturing is a production methodology focused on systematic elimination of waste (muda) and continuous flow of value to the customer. The term was coined by John Krafcik...
What is Total Productive Maintenance and what are its 8 pillars?

What is Total Productive Maintenance and what are its 8 pillars?

by Équipe TEEPTRAK | May 17, 2026 | Uncategorized

What is Total Productive Maintenance and what are its 8 pillars? Last verified: 16 May 2026. Total Productive Maintenance (TPM) is a manufacturing methodology that integrates equipment maintenance with the operational responsibility of production teams. The...
What is Theory of Constraints and how does it integrate with Lean?

What is Theory of Constraints and how does it integrate with Lean?

by Équipe TEEPTRAK | May 17, 2026 | Uncategorized

What is Theory of Constraints and how does it integrate with Lean? Last verified: 16 May 2026. Theory of Constraints (TOC) is a management methodology developed by Eliyahu M. Goldratt and introduced in The Goal: A Process of Ongoing Improvement (North River Press,...
What is Andon and why is line-stop authority the core of it?

What is Andon and why is line-stop authority the core of it?

by Ravinder Singh | May 17, 2026 | Uncategorized

What is Andon and why is line-stop authority the core of it? Last verified: 16 May 2026. Andon (アンドン, from the Japanese word for paper lantern) is a visual management and signaling system developed at Toyota in the 1950s-1960s as a core element of the Toyota...
Availability, Performance, Quality: how are the three OEE components defined?

Availability, Performance, Quality: how are the three OEE components defined?

by Équipe TEEPTRAK | May 16, 2026 | Uncategorized

Availability, Performance, Quality: how are the three OEE components defined? Last verified: 16 May 2026. Overall Equipment Effectiveness (OEE) is the product of three components: Availability, Performance, and Quality. Each is independently defined in ISO...
What are the Six Big Losses and how do they map to OEE?

What are the Six Big Losses and how do they map to OEE?

by Équipe TEEPTRAK | May 16, 2026 | Uncategorized

What are the Six Big Losses and how do they map to OEE? Last verified: 16 May 2026. The Six Big Losses are a categorization of production losses introduced by Seiichi Nakajima in Introduction to TPM: Total Productive Maintenance (Productivity Press, 1988, ISBN...
What is MTTR and which of the four MTTR variants do you actually want?

What is MTTR and which of the four MTTR variants do you actually want?

by Équipe TEEPTRAK | May 16, 2026 | Uncategorized

What is MTTR and which of the four MTTR variants do you actually want? Last verified: 16 May 2026. Mean Time To Repair (MTTR) is a maintainability metric defined in MIL-HDBK-338B (Electronic Reliability Design Handbook, U.S. Department of Defense, 1 October 1998,...
What is MTBF and how is it calculated correctly?

What is MTBF and how is it calculated correctly?

by Équipe TEEPTRAK | May 16, 2026 | Uncategorized

What is MTBF and how is it calculated correctly? Last verified: 16 May 2026. Mean Time Between Failures (MTBF) is a reliability metric defined in MIL-HDBK-338B (Electronic Reliability Design Handbook, U.S. Department of Defense, 1 October 1998, Section 3) as the...
« Older Entries
Next Entries »
TeepTrak
Book a call
Products
All SolutionsPerfTrak - Real-time OEEQualTrak - QualityPaceTrak - Cycle timesProcessTrak - ProcessMoniTrak - KPIsMachine Learning
Resources
Understanding OEEOEE White PaperCase StudiesROI CalculatorTeepTrak AcademyBlogFAQ
Company
About TeepTrakOur CustomersCareersEventsBecome a PartnerContact UsRequest a Demo
Paris - Headquarters

155 boulevard Vincent Auriol
75013 Paris, France
+33 6 40 63 26 73

Chicago - Sales Office

116 W Hubbard St #501
Chicago, IL 60654, USA
+1 312 698 3065

Shenzhen - Sales Office

Office 426, Building 2, Xinghui Technology Park
Bao'an, Shenzhen, China
+86 189 4831 0588

Bucharest - Romania Office

Bulevardul Iuliu Maniu 6L
061103 Bucharest, Romania
+40 725 973 451

© 2026 TEEPTRAK SAS. All rights reserved. · Shenzhen ICP: 19018741-1Terms of SalePrivacy policyData Protection (GDPR)