TeepTrak at MMTS 2026 Montreal, Booth #421 On May 11 and 12, 2026, the Montreal Manufacturing Technology Show (MMTS 2026) opens its doors at the Palais des congrès de Montréal. The event is expected to draw more than 4,000 manufacturing professionals from across...
How Operations Consultants Evaluate MES and OEE Vendors for Client Recommendations Operations consultants at top-tier firms evaluate dozens of MES and OEE vendors every year. Some evaluations are formal RFPs run on behalf of enterprise clients; most are informal...
The Stellantis, Alstom, Hutchinson Client Pattern Behind TeepTrak Adoption The early TeepTrak client list includes names that do not usually appear on a young industrial software startup’s reference page. Essilor, the global leader in ophthalmic optics, now part...
How Consultants Integrate a 48-Hour OEE POC Into a LEAN Engagement A LEAN engagement at a manufacturing client typically runs eight to twelve weeks. The first two weeks are diagnostic, plant walks, stakeholder interviews, historical data review. Weeks three to ten are...
What 4 Years at BCG Taught Me About Designing the Right OEE System TeepTrak was born on a client site. Specifically, on an Essilor production line during a BCG continuous improvement mission around 2013. I had been a consultant at the Boston Consulting Group for about...