by Agathe Lecomte | Jun 27, 2026 | Uncategorized
How to frame a 60-day OEE pilot on one line Key takeawaysA pilot proves value on one line, without committing the whole plant.Sensor installed in under an hour, with no production stop.60 days is enough to measure a real, quantified gain.If nothing actionable comes...
by Agathe Lecomte | Jun 27, 2026 | Uncategorized
What do production stops really cost you? Key takeawaysThe cost of a stop far exceeds the visible lost machine time.Cumulated micro-stops often cost more than spectacular breakdowns.You only quantify well what you measure to the second.Reducing hidden losses improves...
by Agathe Lecomte | Jun 27, 2026 | Uncategorized
The 6 big losses: what your manual log doesn’t see Key takeawaysThe six big losses have structured OEE analysis for decades.But the manual log only captures the long, visible losses.Micro-stops and speed losses slip under the radar, even though they weigh the...
by Agathe Lecomte | Jun 27, 2026 | Uncategorized
Speed losses and SMED: recover the pace after every changeover Key takeawaysPace does not return instantly after a changeover.Those minutes below target trigger no stop to log.It is a permanent, invisible capacity leak.Coupling real-time measurement with SMED reveals...
by Agathe Lecomte | Jun 27, 2026 | Uncategorized
Micro-stops: the invisible killer of your OEE Key takeawaysMicro-stops last seconds but repeat dozens of times per shift.Too short to log, they appear in no manual record.Cumulated, they often represent several OEE points.Only real-time measurement makes them visible,...