👉 Your Real-Time Factory — 60-Day Free Trial

Q

Popup

Free POC

Real-time OEE & production monitoring software

Your machines are losing 15–20 OEE points. See exactly where — live.

TeepTrak captures every stop, slow cycle and quality loss on every machine — automatically. One sensor per machine, connected in under an hour. 10–15 OEE points gained, ROI in weeks, not a 2-year MES project.

Connects all your machines — any age, any brand, no PLC changes
Reveals your hidden losses in real time, down to 2-minute micro-stops
Live in under 1 hour per machine — no IT project, no MES timeline
Operators on board from day one — causes qualified in two taps
★★★★★450+ factories · 30+ countries · 4.7/5 on G2 & Capterra
📅 SCHEDULE A CALL

Get your free 60-day POC

One pilot line. If we do not find at least 10% hidden losses in 60 days, you pay nothing.

Request a demo

🔒 Your data is protected under GDPR & CCPA

Trusted by industry leaders

Deployed across 450+ factories in 30+ countries

stellantisalstomthalesgroupsafranvaleohutchinsondiormerckgroupimeryssavenciasueznutrisetpetit-bateaueolanecontinentalfaureciasaint-gobaindanonestellantisalstomthalesgroupsafranvaleohutchinsondiormerckgroupimeryssavenciasueznutrisetpetit-bateaueolanecontinentalfaureciasaint-gobaindanone

and hundreds more across automotive, aerospace, food & beverage, pharma, and energy

For plant leaders and ops directors

Your real performance, without the spreadsheet wars.

Most plants run 15-20 OEE points below what their equipment can deliver - and the loss hides in stops nobody logs. TeepTrak captures every stop on every machine automatically. Operators qualify causes in two taps. Your team gets one trusted number instead of three conflicting reports.

  • Automatic data collection - no PLC integration required
  • Pareto of stop causes, built as production runs
  • Multi-plant dashboards for corporate visibility
  • Reports ready for ISO 9001 and customer audits
teeptrak  |  Multi-plant performanceLIVEOEE BY LINE — TODAYMachining line 178% OEEAssembly line 264% OEEPackaging line 381% OEE312STOPS / WEEK■ Changeover■ Micro-stops■ Material waitPLANT OEE — 12 WEEKS74.6%Micro-stoppage detected — Assembly line 2 — cause qualified by operator: misfeed

One platform. Every loss, visible.

OEE, quality, cycle times and process parameters - live, on any device, from machine to plant level.

app.teeptrak.com/perftrak · live viewteeptrakLIVEOEE BY LINE — MORNING SHIFTMachining line 192.4%Assembly line 287.1%Packaging line 379.4%TIMELINE — LIVE06:00nowTOP LOSSES — TODAYTool change18 minMaterial wait12 minMicro-stops9 minOEE < 80% — Packaging line 3Changeover over target — Assembly line 22 active alerts — tap to acknowledge
app.teeptrak.com/qualtrak · live viewteeptrakLIVEQUALITY CONTROL — MACHINING LINE 1Scrap rate2.1%Conformity97.9%Controls done48 / 50SELF-CHECKS — LAST HOUR✔ Dimensional check — batch 831PASS✘ Weight check — batch 833FAIL✔ Visual inspection — batch 834PASS✔ Torque check — batch 835PASSSCRAP — 7 DAYS3% limit
app.teeptrak.com/pacetrak · live viewteeptrakLIVECYCLE TIME VS TAKT — MANUAL STATIONSTakt time58sAvg cycle63sTakt adherence91%■ target■ actualStation 10 — prepStation 20 — assemblyStation 30 — control222s278s212sBottleneck detected — Station 20 runs 25% over takt — rebalance suggestion ready
app.teeptrak.com/processtrak · live viewteeptrakLIVEPROCESS PARAMETERS — OVEN LINE BTemperature187.4 °CPressure6.2 barSpeed1,420 RPMDRIFT WATCH — LAST 8Hupper thresholdTemperature drifting toward threshold on oven B2 — alert sent to shift leader 14:32

How much is hidden downtime costing you?

Drag the sliders. Estimate based on a conservative +8 OEE-point gain — our customers average +10 to +15.

Machines monitored20
Current average OEE62%
Cost per machine-hour (USD)$250
Production hours / year / machine4,000

Estimated recoverable capacity

$1.6M

per year, at +8 OEE points recovered

≈ 6,400 machine-hours back in production

FIND MY HIDDEN LOSSES →

From our founder

"Every factory already has the capacity it is looking for. It just can't see it yet."

François Coulloudon founded TeepTrak with one conviction: performance data should be effortless to capture and impossible to argue with. Ten years and 450+ factories later, that is still what we build every day - for plants in 30+ countries.

FC
François Coulloudon
CEO & Founder, TeepTrak

Our vision for smarter factories - 2 min

Start free - before you even talk to us

The tools thousands of production teams download every month. Instant access - no email confirmation needed.

Free OEE Dashboard - Excel template

The exact dashboard 450+ plants use to track OEE by line and shift. Download, plug in your numbers, find your first losses today.

Free OEE Calculator - Excel

Availability x Performance x Quality, pre-built. Calculate the OEE of any machine in 5 minutes.

The MES Alternative Checklist

12 questions to decide: do you really need a 2-year MES project - or 2 weeks of TeepTrak? Used in 100+ evaluations.

The results our customers see every day

Hutchinson went from 42% to 75% OEE. Stellantis recovered ~$5M per year. Here is what teams say.

▶ F2J — how a manufacturer transformed its lines with TeepTrak

★★★★★

"The tool was quickly adopted by all our production lines, thanks to its intuitive interface and clear, real-time dashboards. Operators use it daily for short-interval control, supervisors rely on the 24-hour view."

Alex M.
Production Manager · USA, 51-200 employees
★★★★★

"Real-time OEE tracking, stoppage capture and empowerment of the field at 3 sites. Fast deployment, operator-friendly interface, clear OEE and loss trees, actionable alerts, easy BI exports and APIs."

Laure P.
Operations · Germany, 101-500 employees
★★★★★

"Deployed on all our automated equipment. Strong adoption by operators and technical teams, elimination of paper and Excel, rapid gains in OEE - micro-stops, team organization, and more."

Manuel
Continuous Improvement · France, 1,001-5,000 employees
Valeo| Tier 1 Automotive Supplier

"We deployed TEEPTRAK on 12 production lines across 3 plants. Within 6 weeks, we identified stop causes that were costing us over €230,000 a year - problems we had considered normal."

+12pp
OEE gain
2 hours
install per line
6 wks
to positive ROI
€230k
annual savings

How manufacturers benefit with TeepTrak

+15%
average OEE gain
-40%
unplanned stops
<2h
install per line
3x
faster ROI vs. MES

Frequently asked questions

Ready to see your hidden losses?

Your lines, your losses, your numbers - in a 30-minute working session with a TeepTrak engineer. Or start with a free 60-day POC on one pilot line.

BOOK MY DEMO →