Improve Your Equipment Efficiency: Understanding and Achieving ‘OEE 85’

Écrit par Ravinder Singh

Mar 6, 2026

lire

In today’s industrial context, achieving an OEE or ‘Overall Equipment Effectiveness’ of 85% is an ambitious but crucial target to remain competitive. OEE is a key performance indicator that evaluates the performance of production equipment. An OEE of 85% is often considered an excellent level of performance, indicating optimal resource utilization. However, many factories struggle to reach this target due to challenges such as frequent downtime, quality fluctuations and operational inefficiencies.

The causes behind poor OEE performance can be multiple. Among the most significant are lack of proactive maintenance, excessive changeover times, and absence of real-time equipment performance tracking. These factors directly impact productivity, increase production costs and reduce the quality of finished products. Unplanned downtime and quality defects cause interruptions that drastically reduce TRS, leading to loss of competitiveness.

Fortunately, there are several levers to improve this situation. Implementing digitalization solutions for industrial operations is essential. Adopting real-time tracking software like those offered by TeepTrak provides complete visibility over production lines, allowing precise measurement and analysis of OEE. By integrating continuous improvement methods such as Lean manufacturing and Total Productive Maintenance, factories can reduce losses and optimize performance.

A concrete example is that of an automotive parts manufacturing plant that, thanks to the integration of TeepTrak solutions, successfully identified and eliminated its main bottlenecks. By using real-time TRS tracking, the plant optimized its format changes and improved its maintenance processes, which increased its OEE from 75% to 87% in less than a year.

It is time for plant managers to seriously consider the potential of a TRS/OEE project. Implementing such a project, supported by appropriate tools like those from TeepTrak, offers numerous benefits, including cost reduction and quality improvement. Start by correctly measuring your current OEE, identify areas for improvement and engage in continuous improvement process to exceed industry standards.

FAQ

Question 1: How do you achieve 85% OEE?

Achieving 85% OEE requires regular performance analysis, adoption of proactive maintenance and integration of real-time tracking solutions like those offered by TeepTrak.

Question 2: What is the impact of low OEE on production?

Low OEE can lead to productivity losses, increased costs and poor product quality. It is crucial to monitor and analyze performance to avoid these impacts.

Question 3: Where to start to improve OEE?

Start by understanding your current OEE, identify the main causes of inefficiency, and implement continuous improvement strategies with tools like those from TeepTrak.

Recevez les dernières mises à jour

Pour rester informé(e) des dernières actualités de TEEPTRAK et de l’Industrie 4.0, suivez-nous sur LinkedIn et YouTube. Vous pouvez également vous abonner à notre newsletter pour recevoir notre récapitulatif mensuel !

Optimisation éprouvée. Impact mesurable.

Découvrez comment les principaux fabricants ont amélioré leur TRS, minimisé les temps d’arrêt et réalisé de réels gains de performance grâce à des solutions éprouvées et axées sur les résultats.

Vous pourriez aussi aimer…

Multi Plant OEE: How to Standardize Performance Across Your Manufacturing Sites

How to harmonize OEE measurement across multiple sites to enable reliable comparisons, share best practices, and drive continuous improvement across the group. Multi-plant OEE has become a major strategic issue for manufacturers operating in multiple locations. The question comes up systematically during management committee meetings: "[…]

0 Comments