Nutriset Case Study: packaging OEE 62% to 80% in 4 weeks
Nutriset, a humanitarian-nutrition food manufacturer, lifted packaging OEE from 62% to 80% in just four weeks using TeepTrak Pulse, and cut changeover time by 40% through SMED.
Company snapshot
Nutriset is a humanitarian-nutrition food manufacturer whose packaging lines are central to delivering life-saving products at scale.
The challenge
Packaging OEE sat near 62%, with long changeovers and uncaptured micro-stops limiting output on critical lines.
The TeepTrak solution
Nutriset deployed TeepTrak Pulse for real-time packaging OEE measured to ISO 22400-2, and applied SMED to changeovers using the data.
See your real OEE in 48 hours
Instant download. No email confirmation needed.
Results
In four weeks, packaging OEE rose from 62% to 80% (+18 points) and changeover time fell by 40%.
Frequently Asked Questions
What did Nutriset achieve?
Packaging OEE from 62% to 80% (+18 points) in four weeks, with changeover -40%.
How long did it take?
Four weeks to reach 80% packaging OEE.
Which TeepTrak product?
TeepTrak Pulse for real-time OEE monitoring.
How was changeover reduced?
By 40%, applying SMED using real-time TeepTrak data.
How is OEE measured?
To ISO 22400-2, the international standard.
Is the figure verified?
Yes, a TeepTrak-published reference: 62% to 80% in 4 weeks.