In modern industry, efficient management of production equipment is essential to maintain competitiveness and profitability. OEE (Overall Equipment Effectiveness) is a key indicator for measuring the operational performance of machines. The concept of ‘OEE 1’ and ‘OEE 2’ emerges as plants seek to deepen their analysis of equipment performance across multiple levels or domains. This need becomes more acute when plant and production managers wish to compare and improve performance across different lines or workshops.
The underlying causes of a segmented analysis such as ‘OEE 1’ and ‘OEE 2’ often include the increasing complexity of production lines. Variability in material quality, unplanned downtime, or line changeover processes can introduce bottlenecks and performance gaps. Without a clear, segmented view of these factors, companies can suffer significant losses in productivity, with a direct impact on overall OEE.
To turn these challenges into opportunities, adopting robust methodological approaches and advanced digital tools is crucial. Digitizing the shop floor, for example with TeepTrak, enables real-time monitoring of key indicators, and facilitates downtime analysis and multi-line management. Combining this with continuous improvement methods such as Lean Manufacturing and Total Productive Maintenance (TPM), helps to optimize industrial practices and reduce waste.
An interesting case study is that of an automotive parts factory that applied this approach. Using TeepTrak, the plant assigned specific OEEs to two of its main lines: one for transmission parts and the other for chassis. Detailed analysis by OEE enabled them to pinpoint the causes of downtime and quality defects. In less than six months, they saw an 8% increase in overall OEE and a significant reduction in waste per line.
Faced with today’s industrial challenges, it’s crucial for companies to start their OEE projects without delay. Potential gains include direct productivity improvements, better resource allocation and a clearer vision for continuous improvement. The integration of TeepTrak solutions can provide decision-makers with the tools they need to accurately measure, effectively analyze and continuously improve their industrial processes.
FAQ
Question 1: How can OEE 1 and OEE 2 monitoring improve industrial performance?
Detailed OEE 1 and OEE 2 monitoring enables bottlenecks to be identified and performance gaps to be analyzed by line, making it easier to take corrective action to improve overall efficiency.
Question 2: What are the advantages of digitizing OEE calculations?
Digitizing the OEE, in particular with solutions such as TeepTrak, enables real-time monitoring, precise analysis and multi-line visibility, bringing considerable competitive gains.
Question 3: Where do I start to optimize OEE in my plant?
Start by measuring your current OEE, then identify the main loss factors. Use digital tools for accurate tracking, and adopt continuous improvement practices such as Lean Manufacturing.




0 Comments