PFIZERPFIZER
Exclusively for PFIZER plant leaders

Monitor your shop floor in real time. Improve your OEE.

In pharma & med-device manufacturing, every hour of unplanned downtime costs $22,000 to $43,000. TEEPTRAK turns machine data into actionable visibility - one sensor per machine, connected in under an hour, no IT project.

✔Connects all your machines, whatever their age or brand
✔Reveals your hidden losses in real time
✔Plug-and-play sensors, no PLC changes
✔Live in under 1 hour, with operators on board from day one
TEEPTRAK hardware - tablet, sensor module and andon tower
★★★★★700+ factories · 30+ countries · 4.7/5 on G2 & Capterra

Get your 90-day guided pilot

One pilot line. In 90 days: a signed baseline, your hidden losses quantified, and a go/no-go decision on a fixed date.

Request a demo

🔒 Your data is protected under GDPR & CCPA

For pharma & med-device operations leaders

Visibility on every line - without touching your validated systems.

In GMP environments, most micro-stoppages are never documented, because documenting them is itself a burden. TEEPTRAK sits beside your validated systems - non-intrusive sensors, no PLC changes, no revalidation - and turns every stop into qualified, audit-ready data.

  • ✔Non-intrusive capture - no changes to validated equipment or software
  • ✔Operator-qualified stop causes, logged without paperwork
  • ✔Cross-suite and cross-site visibility for ops leadership
  • ✔Documentation ready for GMP and FDA inspections
teeptrak  |  Multi-plant performanceLIVEOEE BY LINE · TODAYFilling suite B78% OEEBlister packaging line64% OEEGranulation cell81% OEE312STOPS / WEEK■ Changeover■ Micro-stops■ Material waitPLANT OEE · 12 WEEKS74.6%Micro-stoppage detected, Blister packaging line, cause qualified by operator: misfeed

See the status of your machines in real time, anywhere

In GMP environments, most micro-stoppages are never documented - and never fixed.

app.teeptrak.com/perftrak · PFIZER pilotteeptrak  LIVEOEE BY LINE — MORNING SHIFTFilling suite B92.4%Blister packaging line87.1%Granulation cell79.4%TIMELINE — LIVE06:00nowTOP LOSSES — TODAYTool change18 minMaterial wait12 minMicro-stops9 minOEE < 80% — Granulation cellChangeover over target — Blister packaging line2 active alerts — tap to acknowledge
app.teeptrak.com/qualtrak · PFIZER pilotteeptrak  LIVEQUALITY CONTROL — FILLING SUITE BScrap rate2.1%Conformity97.9%Controls done48 / 50SELF-CHECKS — LAST HOUR✔ Dimensional check — batch 831PASS✘ Weight check — batch 833FAIL✔ Visual inspection — batch 834PASS✔ Torque check — batch 835PASSSCRAP — 7 DAYS3% limit
app.teeptrak.com/pacetrak · PFIZER pilotteeptrak  LIVECYCLE TIME VS TAKT — MANUAL STATIONSTakt time58sAvg cycle63sTakt adherence91%■ target   ■ actualStation 10 — prepStation 20 — assemblyStation 30 — control222s278s212sBottleneck detected — Station 20 runs 25% over takt — rebalance suggestion ready
app.teeptrak.com/processtrak · PFIZER pilotteeptrak  LIVEPROCESS PARAMETERS — GRANULATION CELLTemperature187.4 °CPressure6.2 barSpeed1,420 RPMDRIFT WATCH — LAST 8Hupper thresholdTemperature drifting toward threshold on oven B2 — alert sent to shift leader 14:32
⏱

Real-time visibility for your team

OEE, availability and stop causes per machine and per line - updated every minute, on any device.

⚠️

Proactive incident management

Micro-stoppage alerts the moment they happen, with operator-qualified causes ready for Pareto analysis.

📊

Automated, reliable analytics

Audit-ready performance reports built from machine data - no Excel, no manual collection, no debate.

Case study - Tier 1 automotive supplier

Valeo| Tier 1 Automotive Supplier

"We deployed TEEPTRAK on 12 production lines across 3 plants. Within 6 weeks, we identified stop causes that were costing us over €230,000 a year - problems we had considered normal."

+12pp
OEE gain
2 hours
install per line
6 wks
to positive ROI
€230k
annual savings

How manufacturers benefit with TEEPTRAK

Hutchinson went from 47% to 72% OEE. Stellantis recovered €4.8M (~$5M) per year.

+15%
average OEE gain
-40%
unplanned stops
<2h
install per line
3x
faster ROI vs. MES
Stellantis Safran Valeo Hutchinson Alstom

One platform. Four modules. Zero IT project.

Start with one line and one module - scale to the whole plant. Click a module to explore.

teeptrakPLATFORMPerfTrakQualTrakPaceTrakProcessTrak

MODULE

PerfTrak

Real-time OEE and downtime tracking on any machine.

✓.
✓.
✓.
+15%average OEE gain
See it on your line →

Request a custom demo for PFIZER

See your lines, your losses, your numbers - in a 30-minute working session with a TEEPTRAK engineer.

BOOK MY DEMO →
TeepTrak
Paris, Headquarters

155 boulevard Vincent Auriol
75013 Paris, France
+33 6 40 63 26 73

Chicago, Sales Office

116 W Hubbard St #501
Chicago, IL 60654, USA
+1 312 698 3065

Shenzhen, Sales Office

Office 426, Building 2, Xinghui Technology Park
Bao'an, Shenzhen, China
+86 189 4831 0588

Bucharest, Romania Office

Bulevardul Iuliu Maniu 6L
061103 Bucharest, Romania
+40 725 973 451

© 2026 TEEPTRAK SAS. All rights reserved.Privacy policy
粤ICP备19018741号-1