{"id":95503,"date":"2026-05-25T11:22:26","date_gmt":"2026-05-25T11:22:26","guid":{"rendered":"https:\/\/teeptrak.com\/quality-rate-oee-calculation\/"},"modified":"2026-05-25T11:22:29","modified_gmt":"2026-05-25T11:22:29","slug":"quality-rate-oee-calculation","status":"publish","type":"post","link":"https:\/\/teeptrak.com\/en\/quality-rate-oee-calculation\/","title":{"rendered":"Quality Rate OEE: How to Calculate, Measure and Improve This Critical Manufacturing Metric"},"content":{"rendered":"<p>[et_pb_section fb_built=&#8221;1&#8243; _builder_version=&#8221;4.27&#8243;][et_pb_row][et_pb_column type=&#8221;4_4&#8243;][et_pb_text]<\/p>\n<h1>Quality Rate OEE: How to Calculate, Measure and Improve This Critical Manufacturing Metric<\/h1>\n<p>The <strong>quality rate OEE<\/strong> component is the most under-measured, most misunderstood and most financially impactful component of Overall Equipment Effectiveness. While availability rate captures machine uptime and performance rate tracks production speed, the quality rate reveals how much of your output actually generates revenue \u2014 and how much is pure waste. Manufacturers who measure quality rate accurately and automatically typically discover 2-5 percentage points of hidden production loss that never appeared in their OEE reports.<\/p>\n<p>This guide explains exactly how quality rate is calculated, the most common measurement errors that inflate it artificially, and the practical steps to make quality rate a real-time, automated metric in your factory.<\/p>\n<h2>Quality Rate OEE Formula: The Complete Calculation Explained<\/h2>\n<p>The quality rate OEE is calculated as:<\/p>\n<p><strong>Quality Rate = Good Units \/ Total Units Produced x 100<\/strong><\/p>\n<p>Where Good Units equals the total units produced minus rejected units (scrap + rework). Total Units Produced is the full output of the production run, including all defective units. The resulting percentage represents the proportion of production time that created sellable product.<\/p>\n<p>For example: a production line produces 10,000 units in a shift. Quality inspection identifies 350 rejects (200 scrapped, 150 reworked). The quality rate is (10,000 &#8211; 350) \/ 10,000 = 96.5%. This 3.5% quality loss feeds directly into the OEE calculation, reducing overall effectiveness by the same proportion.<\/p>\n<p>Within the full OEE formula \u2014 OEE = Availability x Performance x Quality Rate \u2014 even small quality rate changes have outsized impact. Improving quality rate from 96% to 98% on a line with 85% availability and 90% performance lifts OEE from 73.4% to 74.97% \u2014 a 1.57-point gain that, on a line generating $300\/hour of value over 5,000 annual operating hours, represents $23,550 of recovered production value per year.<\/p>\n<h2>Why Most Factories Overestimate Their Quality Rate<\/h2>\n<p>Quality rate inflation is the most common data quality problem in OEE measurement. There are four principal causes.<\/p>\n<p><strong>Manual counting errors.<\/strong> When operators count rejects manually, they systematically under-report. Micro-defects, borderline rejects and units scrapped during changeover are frequently omitted. Studies consistently show manual quality counts overstate quality rate by 2-4 percentage points versus automated measurement.<\/p>\n<p><strong>Delayed measurement.<\/strong> When quality data is entered at the end of a shift or the end of a batch, memory errors compound counting errors. The further the measurement from the production event, the less accurate it becomes.<\/p>\n<p><strong>Rework not counted as loss.<\/strong> Some OEE implementations count reworked units as good units \u2014 since they eventually pass inspection. But rework consumes additional time, energy and operator effort that should be counted as quality loss. The correct approach counts every unit that did not pass first-time as a quality failure in the OEE calculation.<\/p>\n<p><strong>Startup rejects excluded.<\/strong> The first units produced after a changeover or machine startup often fail to meet specification. Excluding these from the quality rate calculation flatters the number but hides a significant source of waste \u2014 particularly in facilities with frequent changeovers.<\/p>\n<h2>How to Measure Quality Rate Automatically With TEEPTRAK<\/h2>\n<p>TEEPTRAK eliminates quality rate inflation by automating the measurement at the point of production. Three approaches are supported, individually or in combination.<\/p>\n<p><strong>Sensor-based reject detection.<\/strong> IoT sensors \u2014 vision cameras, weight cells, dimensional gauges \u2014 automatically classify each unit as good or reject. The reject signal feeds directly into the TEEPTRAK platform, updating the quality rate in real time with zero operator intervention.<\/p>\n<p><strong>PLC integration.<\/strong> Many machines produce a digital output signal indicating whether each cycle produced a good or defective unit. TEEPTRAK captures these signals through its gateway, translating machine-level quality data into the OEE quality rate calculation.<\/p>\n<p><strong>Operator classification terminals.<\/strong> For defect types that require human judgement, TEEPTRAK shop-floor terminals present predefined reject reason codes. Operators tap the relevant category \u2014 dimensional out-of-tolerance, surface defect, contamination, packaging failure \u2014 and the reject is logged instantly with full context.<\/p>\n<p>Regardless of input method, the quality rate on the TEEPTRAK dashboard updates in real time, giving operators, supervisors and <a href=\"https:\/\/teeptrak.com\/en\/our-solutions\/\">production managers<\/a> immediate visibility into quality performance.<\/p>\n<h2>Quality Rate Benchmarks by Industry<\/h2>\n<p>Quality rate targets vary significantly by sector. Pharmaceutical manufacturing typically operates at 99.5-99.9% quality rate due to stringent GMP requirements and the high cost of batch failures. Automotive production targets 99.0-99.5%, driven by IATF 16949 standards and the extreme cost of field recalls. Food and beverage manufacturing ranges from 97-99%, with variation driven by product complexity and packaging requirements. General discrete manufacturing operates at 95-98%, with significant room for improvement in most facilities.<\/p>\n<p>Whatever your sector, the critical insight is this: the gap between your assumed quality rate and your actual quality rate (once measured automatically) is almost always larger than expected. TEEPTRAK customers consistently discover 2-5 points of hidden quality loss in the first week of automated measurement \u2014 representing the precise amount of waste that was previously invisible to management.<\/p>\n<h2>5 Strategies to Improve Quality Rate in OEE<\/h2>\n<p><strong>1. Automate quality measurement first.<\/strong> You cannot improve what you do not measure accurately. Deploying automated quality tracking \u2014 even on a single pilot line \u2014 reveals the true quality baseline and identifies the highest-impact improvement opportunities.<\/p>\n<p><strong>2. Implement real-time quality alerts.<\/strong> Configure TEEPTRAK to alert operators and supervisors when quality rate drops below threshold. A 2% quality rate decline detected in the first 15 minutes of a shift can be corrected immediately; the same decline detected at end-of-shift has already produced hours of scrap.<\/p>\n<p><strong>3. Analyse quality by product, shift and machine.<\/strong> Quality losses rarely distribute evenly. TEEPTRAK Pareto analysis reveals the specific combinations \u2014 Product X on Machine 3 during Night Shift \u2014 where quality losses concentrate. Focusing improvement resources on these hot spots delivers the fastest ROI.<\/p>\n<p><strong>4. Correlate quality events with process parameters.<\/strong> Use JEMBA AI to identify the machine settings, environmental conditions and maintenance states that precede quality failures. This transforms quality improvement from reactive problem-solving to predictive prevention.<\/p>\n<p><strong>5. Include rework and startup rejects in the quality rate.<\/strong> Honest measurement drives honest improvement. Factories that exclude rework and <a href=\"https:\/\/teeptrak.com\/en\/faq\/\">startup rejects<\/a> from their quality rate perpetuate hidden waste. Including all non-first-pass units reveals the true cost of quality and motivates the process changes needed to eliminate it.<\/p>\n<h2>The Financial Impact of Quality Rate on OEE<\/h2>\n<p>Consider a medium-sized manufacturing facility with 8 production lines, each running 5,000 hours per year at $200\/hour added value. Current OEE is measured at 72% with an assumed quality rate of 98%. After deploying TEEPTRAK and measuring quality automatically, the true quality rate is revealed as 94.5% \u2014 a 3.5-point gap.<\/p>\n<p>The financial impact of that 3.5-point quality rate gap: 8 lines x 5,000 hours x $200\/hour x 3.5% = $280,000 per year in hidden quality losses that were invisible before automated measurement. This is production capacity that already exists but was being destroyed by unmeasured defects \u2014 and it can be recovered without any capital investment in new equipment. By implementing automated quality rate tracking across all production lines, manufacturers gain the visibility needed to prioritise targeted process improvements and drive measurable results within weeks of deployment.<\/p>\n<p style=\"text-align:center;margin-top:40px;\">\n<a href=\"https:\/\/teeptrak.com\/en\/contact-teeptrak\/\" style=\"background-color:#EB352C;color:#ffffff;padding:16px 32px;border-radius:4px;text-decoration:none;font-weight:bold;font-size:16px;\"><br \/>\nMeasure your true quality rate \u2014 start a free POC<br \/>\n<\/a><\/p>\n<h2>Frequently Asked Questions<\/h2>\n<h3>What is quality rate OEE?<\/h3>\n<p>Quality rate is the third component of OEE, calculated as good units divided by total units produced. It measures the proportion of production output that meets specification on the first attempt, excluding scrap and rework.<\/p>\n<h3>How do you calculate quality rate for OEE?<\/h3>\n<p>Quality Rate = (Total Units Produced &#8211; Rejected Units) \/ Total Units Produced x 100. Rejected units include both scrapped units and units requiring rework. The result is expressed as a percentage.<\/p>\n<h3>What is a good quality rate for OEE?<\/h3>\n<p>World-class quality rate is 99%+. Most manufacturing facilities operate between 94-98% when measured accurately. The target depends on your industry: pharmaceutical requires 99.5%+, automotive targets 99%+, food and beverage ranges from 97-99%.<\/p>\n<h3>Why is my OEE quality rate always 99%?<\/h3>\n<p>A consistently reported 99% quality rate usually indicates manual measurement or a static assumption rather than automated real-time tracking. When manufacturers switch to automated quality measurement, the actual quality rate is typically 2-5 points lower than the manually reported figure.<\/p>\n<h3>Should rework be included in OEE quality rate?<\/h3>\n<p>Yes. The standard OEE quality rate calculation counts any unit that does not pass first-time inspection as a quality loss \u2014 including reworked units. Rework consumes additional time and resources that represent genuine effectiveness loss.<\/p>\n<h3>How does quality rate affect overall OEE?<\/h3>\n<p>Quality rate is multiplied with availability and performance in the OEE formula. A 2-point drop in quality rate reduces OEE by approximately 1.5-1.7 points (depending on the other two factors), which can represent tens of thousands of dollars in lost production value annually.<\/p>\n<h3>Can quality rate exceed 100% in OEE?<\/h3>\n<p>No. Quality rate is capped at 100%. If more good units are counted than total units produced, it indicates a measurement error \u2014 typically caused by units from a previous batch being counted in the current period, or reject counts not being captured correctly.<\/p>\n<p><script type=\"application\/ld+json\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"BlogPosting\",\"headline\":\"Quality Rate OEE: How to Calculate, Measure and Improve This Critical Manufacturing Metric\",\"description\":\"Complete guide to quality rate OEE: formula, calculation examples, industry benchmarks, 5 improvement strategies, and how TEEPTRAK automates quality measurement.\",\"author\":{\"@type\":\"Organization\",\"name\":\"TeepTrak\"},\"publisher\":{\"@type\":\"Organization\",\"name\":\"TeepTrak\",\"url\":\"https:\/\/teeptrak.com\/en\/\"},\"datePublished\":\"2026-05-25\",\"inLanguage\":\"en\",\"mainEntityOfPage\":{\"@type\":\"WebPage\",\"@id\":\"https:\/\/teeptrak.com\/en\/quality-rate-oee-calculation\/\"}},{\"@type\":\"FAQPage\",\"mainEntity\":[{\"@type\":\"Question\",\"name\":\"What is quality rate OEE?\",\"acceptedAnswer\":{\"@type\":\"Answer\",\"text\":\"Quality rate is the third component of OEE, calculated as good units divided by total units produced, measuring the proportion of output that meets specification on the first attempt.\"}},{\"@type\":\"Question\",\"name\":\"How do you calculate quality rate for OEE?\",\"acceptedAnswer\":{\"@type\":\"Answer\",\"text\":\"Quality Rate = (Total Units Produced - Rejected Units) \/ Total Units Produced x 100. Rejected units include both scrapped units and those requiring rework.\"}},{\"@type\":\"Question\",\"name\":\"What is a good quality rate for OEE?\",\"acceptedAnswer\":{\"@type\":\"Answer\",\"text\":\"World-class quality rate is 99%+. Most facilities operate between 94-98% when measured accurately. Targets vary by industry: pharma 99.5%+, automotive 99%+, food 97-99%.\"}},{\"@type\":\"Question\",\"name\":\"Why is my OEE quality rate always 99 percent?\",\"acceptedAnswer\":{\"@type\":\"Answer\",\"text\":\"A static 99% typically indicates manual measurement or an assumption rather than automated tracking. Real automated measurement usually reveals quality rates 2-5 points lower.\"}},{\"@type\":\"Question\",\"name\":\"Should rework be included in OEE quality rate?\",\"acceptedAnswer\":{\"@type\":\"Answer\",\"text\":\"Yes. Standard OEE quality rate counts any unit that does not pass first-time inspection as a quality loss, including reworked units that consume additional time and resources.\"}},{\"@type\":\"Question\",\"name\":\"How does quality rate affect overall OEE?\",\"acceptedAnswer\":{\"@type\":\"Answer\",\"text\":\"Quality rate is multiplied with availability and performance in the OEE formula. A 2-point quality rate drop reduces OEE by approximately 1.5-1.7 points.\"}},{\"@type\":\"Question\",\"name\":\"Can quality rate exceed 100 percent in OEE?\",\"acceptedAnswer\":{\"@type\":\"Answer\",\"text\":\"No. Quality rate is capped at 100%. Values above indicate a measurement error, typically from miscounted units or reject signals not captured correctly.\"}}]}]}<\/script><br \/>\n[\/et_pb_text][\/et_pb_column][\/et_pb_row][\/et_pb_section]<\/p>\n","protected":false},"excerpt":{"rendered":"<p>[et_pb_section fb_built=&#8221;1&#8243; _builder_version=&#8221;4.27&#8243;][et_pb_row][et_pb_column type=&#8221;4_4&#8243;][et_pb_text] Quality Rate OEE: How to Calculate, Measure and Improve This Critical Manufacturing Metric The quality rate OEE component is the most under-measured, most misunderstood and most financially impactful component of Overall Equipment Effectiveness. While availability rate captures machine uptime and performance rate tracks production speed, the quality rate reveals how much [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":95497,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_et_pb_use_builder":"","_et_pb_old_content":"","_et_gb_content_width":"","ai_seo_title":"Quality Rate OEE: Calculate & Improve | TeepTrak","ai_meta_description":"Quality rate OEE explained: formula, calculation examples, benchmarks by sector, 5 improvement strategies and TEEPTRAK automated measurement.","ai_focus_keyword":"quality rate OEE","footnotes":""},"categories":[1],"tags":[],"class_list":["post-95503","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-uncategorized"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.7 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Quality Rate OEE: Calculate &amp; Improve | TeepTrak<\/title>\n<meta name=\"description\" content=\"Quality rate OEE explained: formula, calculation examples, benchmarks by sector, 5 improvement strategies and TEEPTRAK automated measurement.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/teeptrak.com\/en\/quality-rate-oee-calculation\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Quality Rate OEE: Calculate &amp; Improve | TeepTrak\" \/>\n<meta property=\"og:description\" content=\"Quality rate OEE explained: formula, calculation examples, benchmarks by sector, 5 improvement strategies and TEEPTRAK automated measurement.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/teeptrak.com\/en\/quality-rate-oee-calculation\/\" \/>\n<meta property=\"og:site_name\" content=\"TEEPTRAK - Connect to your industrial potential\" \/>\n<meta property=\"article:published_time\" content=\"2026-05-25T11:22:26+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-05-25T11:22:29+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/teeptrak.com\/wp-content\/uploads\/2026\/05\/quality-rate-oee-calculation.jpeg\" \/>\n\t<meta property=\"og:image:width\" content=\"1150\" \/>\n\t<meta property=\"og:image:height\" content=\"657\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"\u00c9quipe TEEPTRAK\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"\u00c9quipe TEEPTRAK\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"7 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/teeptrak.com\\\/en\\\/quality-rate-oee-calculation\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/teeptrak.com\\\/en\\\/quality-rate-oee-calculation\\\/\"},\"author\":{\"name\":\"\u00c9quipe TEEPTRAK\",\"@id\":\"https:\\\/\\\/teeptrak.com\\\/en\\\/#\\\/schema\\\/person\\\/e0b65287bf97c0856b9e70813a4b5aff\"},\"headline\":\"Quality Rate OEE: How to Calculate, Measure and Improve This Critical Manufacturing Metric\",\"datePublished\":\"2026-05-25T11:22:26+00:00\",\"dateModified\":\"2026-05-25T11:22:29+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/teeptrak.com\\\/en\\\/quality-rate-oee-calculation\\\/\"},\"wordCount\":1474,\"publisher\":{\"@id\":\"https:\\\/\\\/teeptrak.com\\\/en\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/teeptrak.com\\\/en\\\/quality-rate-oee-calculation\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/teeptrak.com\\\/wp-content\\\/uploads\\\/2026\\\/05\\\/quality-rate-oee-calculation.jpeg\",\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/teeptrak.com\\\/en\\\/quality-rate-oee-calculation\\\/\",\"url\":\"https:\\\/\\\/teeptrak.com\\\/en\\\/quality-rate-oee-calculation\\\/\",\"name\":\"Quality Rate OEE: Calculate & Improve | TeepTrak\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/teeptrak.com\\\/en\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/teeptrak.com\\\/en\\\/quality-rate-oee-calculation\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/teeptrak.com\\\/en\\\/quality-rate-oee-calculation\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/teeptrak.com\\\/wp-content\\\/uploads\\\/2026\\\/05\\\/quality-rate-oee-calculation.jpeg\",\"datePublished\":\"2026-05-25T11:22:26+00:00\",\"dateModified\":\"2026-05-25T11:22:29+00:00\",\"description\":\"Quality rate OEE explained: formula, calculation examples, benchmarks by sector, 5 improvement strategies and TEEPTRAK automated measurement.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/teeptrak.com\\\/en\\\/quality-rate-oee-calculation\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/teeptrak.com\\\/en\\\/quality-rate-oee-calculation\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/teeptrak.com\\\/en\\\/quality-rate-oee-calculation\\\/#primaryimage\",\"url\":\"https:\\\/\\\/teeptrak.com\\\/wp-content\\\/uploads\\\/2026\\\/05\\\/quality-rate-oee-calculation.jpeg\",\"contentUrl\":\"https:\\\/\\\/teeptrak.com\\\/wp-content\\\/uploads\\\/2026\\\/05\\\/quality-rate-oee-calculation.jpeg\",\"width\":1150,\"height\":657,\"caption\":\"quality rate oee calculation - TeepTrak\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/teeptrak.com\\\/en\\\/quality-rate-oee-calculation\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Accueil\",\"item\":\"https:\\\/\\\/teeptrak.com\\\/en\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Quality Rate OEE: How to Calculate, Measure and Improve This Critical Manufacturing Metric\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/teeptrak.com\\\/en\\\/#website\",\"url\":\"https:\\\/\\\/teeptrak.com\\\/en\\\/\",\"name\":\"TEEPTRAK\",\"description\":\"TEEPTRAK official website - OEE\",\"publisher\":{\"@id\":\"https:\\\/\\\/teeptrak.com\\\/en\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/teeptrak.com\\\/en\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/teeptrak.com\\\/en\\\/#organization\",\"name\":\"TEEPTRAK\",\"url\":\"https:\\\/\\\/teeptrak.com\\\/en\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/teeptrak.com\\\/en\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/teeptrak.com\\\/wp-content\\\/uploads\\\/2023\\\/05\\\/cropped-Capture-decran-2023-05-04-112832.png\",\"contentUrl\":\"https:\\\/\\\/teeptrak.com\\\/wp-content\\\/uploads\\\/2023\\\/05\\\/cropped-Capture-decran-2023-05-04-112832.png\",\"width\":512,\"height\":512,\"caption\":\"TEEPTRAK\"},\"image\":{\"@id\":\"https:\\\/\\\/teeptrak.com\\\/en\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.linkedin.com\\\/company\\\/teeptrak\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/teeptrakinternational\\\/\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/teeptrak.com\\\/en\\\/#\\\/schema\\\/person\\\/e0b65287bf97c0856b9e70813a4b5aff\",\"name\":\"\u00c9quipe TEEPTRAK\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/c15a5bed2b22793c34b357757ed5a12321e733893599e115e40c0263ef4877f7?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/c15a5bed2b22793c34b357757ed5a12321e733893599e115e40c0263ef4877f7?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/c15a5bed2b22793c34b357757ed5a12321e733893599e115e40c0263ef4877f7?s=96&d=mm&r=g\",\"caption\":\"\u00c9quipe TEEPTRAK\"},\"sameAs\":[\"https:\\\/\\\/teeptrak.com\"],\"url\":\"https:\\\/\\\/teeptrak.com\\\/en\\\/author\\\/auriane\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Quality Rate OEE: Calculate & Improve | TeepTrak","description":"Quality rate OEE explained: formula, calculation examples, benchmarks by sector, 5 improvement strategies and TEEPTRAK automated measurement.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/teeptrak.com\/en\/quality-rate-oee-calculation\/","og_locale":"en_US","og_type":"article","og_title":"Quality Rate OEE: Calculate & Improve | TeepTrak","og_description":"Quality rate OEE explained: formula, calculation examples, benchmarks by sector, 5 improvement strategies and TEEPTRAK automated measurement.","og_url":"https:\/\/teeptrak.com\/en\/quality-rate-oee-calculation\/","og_site_name":"TEEPTRAK - Connect to your industrial potential","article_published_time":"2026-05-25T11:22:26+00:00","article_modified_time":"2026-05-25T11:22:29+00:00","og_image":[{"width":1150,"height":657,"url":"https:\/\/teeptrak.com\/wp-content\/uploads\/2026\/05\/quality-rate-oee-calculation.jpeg","type":"image\/jpeg"}],"author":"\u00c9quipe TEEPTRAK","twitter_card":"summary_large_image","twitter_misc":{"Written by":"\u00c9quipe TEEPTRAK","Est. reading time":"7 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/teeptrak.com\/en\/quality-rate-oee-calculation\/#article","isPartOf":{"@id":"https:\/\/teeptrak.com\/en\/quality-rate-oee-calculation\/"},"author":{"name":"\u00c9quipe TEEPTRAK","@id":"https:\/\/teeptrak.com\/en\/#\/schema\/person\/e0b65287bf97c0856b9e70813a4b5aff"},"headline":"Quality Rate OEE: How to Calculate, Measure and Improve This Critical Manufacturing Metric","datePublished":"2026-05-25T11:22:26+00:00","dateModified":"2026-05-25T11:22:29+00:00","mainEntityOfPage":{"@id":"https:\/\/teeptrak.com\/en\/quality-rate-oee-calculation\/"},"wordCount":1474,"publisher":{"@id":"https:\/\/teeptrak.com\/en\/#organization"},"image":{"@id":"https:\/\/teeptrak.com\/en\/quality-rate-oee-calculation\/#primaryimage"},"thumbnailUrl":"https:\/\/teeptrak.com\/wp-content\/uploads\/2026\/05\/quality-rate-oee-calculation.jpeg","inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/teeptrak.com\/en\/quality-rate-oee-calculation\/","url":"https:\/\/teeptrak.com\/en\/quality-rate-oee-calculation\/","name":"Quality Rate OEE: Calculate & Improve | TeepTrak","isPartOf":{"@id":"https:\/\/teeptrak.com\/en\/#website"},"primaryImageOfPage":{"@id":"https:\/\/teeptrak.com\/en\/quality-rate-oee-calculation\/#primaryimage"},"image":{"@id":"https:\/\/teeptrak.com\/en\/quality-rate-oee-calculation\/#primaryimage"},"thumbnailUrl":"https:\/\/teeptrak.com\/wp-content\/uploads\/2026\/05\/quality-rate-oee-calculation.jpeg","datePublished":"2026-05-25T11:22:26+00:00","dateModified":"2026-05-25T11:22:29+00:00","description":"Quality rate OEE explained: formula, calculation examples, benchmarks by sector, 5 improvement strategies and TEEPTRAK automated measurement.","breadcrumb":{"@id":"https:\/\/teeptrak.com\/en\/quality-rate-oee-calculation\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/teeptrak.com\/en\/quality-rate-oee-calculation\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/teeptrak.com\/en\/quality-rate-oee-calculation\/#primaryimage","url":"https:\/\/teeptrak.com\/wp-content\/uploads\/2026\/05\/quality-rate-oee-calculation.jpeg","contentUrl":"https:\/\/teeptrak.com\/wp-content\/uploads\/2026\/05\/quality-rate-oee-calculation.jpeg","width":1150,"height":657,"caption":"quality rate oee calculation - TeepTrak"},{"@type":"BreadcrumbList","@id":"https:\/\/teeptrak.com\/en\/quality-rate-oee-calculation\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Accueil","item":"https:\/\/teeptrak.com\/en\/"},{"@type":"ListItem","position":2,"name":"Quality Rate OEE: How to Calculate, Measure and Improve This Critical Manufacturing Metric"}]},{"@type":"WebSite","@id":"https:\/\/teeptrak.com\/en\/#website","url":"https:\/\/teeptrak.com\/en\/","name":"TEEPTRAK","description":"TEEPTRAK official website - OEE","publisher":{"@id":"https:\/\/teeptrak.com\/en\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/teeptrak.com\/en\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/teeptrak.com\/en\/#organization","name":"TEEPTRAK","url":"https:\/\/teeptrak.com\/en\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/teeptrak.com\/en\/#\/schema\/logo\/image\/","url":"https:\/\/teeptrak.com\/wp-content\/uploads\/2023\/05\/cropped-Capture-decran-2023-05-04-112832.png","contentUrl":"https:\/\/teeptrak.com\/wp-content\/uploads\/2023\/05\/cropped-Capture-decran-2023-05-04-112832.png","width":512,"height":512,"caption":"TEEPTRAK"},"image":{"@id":"https:\/\/teeptrak.com\/en\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.linkedin.com\/company\/teeptrak\/","https:\/\/www.linkedin.com\/company\/teeptrakinternational\/"]},{"@type":"Person","@id":"https:\/\/teeptrak.com\/en\/#\/schema\/person\/e0b65287bf97c0856b9e70813a4b5aff","name":"\u00c9quipe TEEPTRAK","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/secure.gravatar.com\/avatar\/c15a5bed2b22793c34b357757ed5a12321e733893599e115e40c0263ef4877f7?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/c15a5bed2b22793c34b357757ed5a12321e733893599e115e40c0263ef4877f7?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/c15a5bed2b22793c34b357757ed5a12321e733893599e115e40c0263ef4877f7?s=96&d=mm&r=g","caption":"\u00c9quipe TEEPTRAK"},"sameAs":["https:\/\/teeptrak.com"],"url":"https:\/\/teeptrak.com\/en\/author\/auriane\/"}]}},"_links":{"self":[{"href":"https:\/\/teeptrak.com\/en\/wp-json\/wp\/v2\/posts\/95503","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/teeptrak.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/teeptrak.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/teeptrak.com\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/teeptrak.com\/en\/wp-json\/wp\/v2\/comments?post=95503"}],"version-history":[{"count":1,"href":"https:\/\/teeptrak.com\/en\/wp-json\/wp\/v2\/posts\/95503\/revisions"}],"predecessor-version":[{"id":95504,"href":"https:\/\/teeptrak.com\/en\/wp-json\/wp\/v2\/posts\/95503\/revisions\/95504"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/teeptrak.com\/en\/wp-json\/wp\/v2\/media\/95497"}],"wp:attachment":[{"href":"https:\/\/teeptrak.com\/en\/wp-json\/wp\/v2\/media?parent=95503"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/teeptrak.com\/en\/wp-json\/wp\/v2\/categories?post=95503"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/teeptrak.com\/en\/wp-json\/wp\/v2\/tags?post=95503"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}