{"id":95206,"date":"2026-05-21T10:06:59","date_gmt":"2026-05-21T10:06:59","guid":{"rendered":"https:\/\/teeptrak.com\/what-is-oee-how-calculated-complete-guide-2027-5\/"},"modified":"2026-05-21T10:07:00","modified_gmt":"2026-05-21T10:07:00","slug":"what-is-oee-how-calculated-complete-guide-2027-5","status":"publish","type":"post","link":"https:\/\/teeptrak.com\/en\/what-is-oee-how-calculated-complete-guide-2027-5\/","title":{"rendered":"What is OEE? Complete guide 2027: formula, calculation, world-class benchmarks, Six Big Losses \u2014 with examples"},"content":{"rendered":"<div class=\"tldr-answer\" style=\"background:#F5F8FB;border-left:4px solid #4C00FF;padding:18px 24px;margin:24px 0;\">\n<strong>TL;DR \u2014 What is OEE in 60 words<\/strong><br \/>\nOEE (Overall Equipment Effectiveness) = Availability \u00d7 Performance \u00d7 Quality. Measures how effectively manufacturing equipment is used. 100% = perfect production. 85% = world-class. 60% = typical. Each component identifies losses: downtime (Availability), speed loss (Performance), defects (Quality). ISO 22400-2 standard. The Six Big Losses framework pinpoints improvement opportunities. TeepTrak measures OEE across 450+ factories in 30 countries.\n<\/div>\n<p><strong>OEE (Overall Equipment Effectiveness)<\/strong> is the gold-standard KPI for measuring manufacturing equipment productivity. It answers one question: <em>of the total time your equipment could be producing good parts at maximum speed, what percentage is it actually achieving?<\/em> An OEE of 100% means every part is produced at maximum speed with zero defects and zero downtime. In practice, world-class OEE is 85%, and most manufacturers start at 40-65% when they first measure.<\/p>\n<h2>The OEE formula<\/h2>\n<p><strong>OEE = Availability \u00d7 Performance \u00d7 Quality<\/strong><\/p>\n<table>\n<thead>\n<tr>\n<th>Component<\/th>\n<th>Formula<\/th>\n<th>What it measures<\/th>\n<th>World-class<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td><strong>Availability<\/strong><\/td>\n<td>Run Time \/ Planned Production Time<\/td>\n<td>% of planned time the machine is actually running (accounts for breakdowns + changeovers)<\/td>\n<td>90%+<\/td>\n<\/tr>\n<tr>\n<td><strong>Performance<\/strong><\/td>\n<td>(Ideal Cycle Time \u00d7 Total Count) \/ Run Time<\/td>\n<td>% of maximum speed achieved during run time (accounts for minor stops + reduced speed)<\/td>\n<td>95%+<\/td>\n<\/tr>\n<tr>\n<td><strong>Quality<\/strong><\/td>\n<td>Good Count \/ Total Count<\/td>\n<td>% of produced units that meet quality standards (accounts for startup rejects + production rejects)<\/td>\n<td>99%+<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p><strong>Example<\/strong>: Availability 87% \u00d7 Performance 93% \u00d7 Quality 98% = <strong>OEE 79.2%<\/strong> \u2014 above average but below world-class.<\/p>\n<h2>The Six Big Losses<\/h2>\n<p>OEE&#8217;s power comes from the <strong>Six Big Losses<\/strong> framework (TPM methodology) that categorizes every production loss:<\/p>\n<table>\n<thead>\n<tr>\n<th>OEE component<\/th>\n<th>Loss<\/th>\n<th>Description<\/th>\n<th>Example<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td rowspan=\"2\">Availability<\/td>\n<td>1. Equipment failure<\/td>\n<td>Unplanned stops (breakdowns)<\/td>\n<td>Motor failure, tool break<\/td>\n<\/tr>\n<tr>\n<td>2. Setup &#038; adjustment<\/td>\n<td>Changeover, cleaning, startup<\/td>\n<td>Product change, mold change<\/td>\n<\/tr>\n<tr>\n<td rowspan=\"2\">Performance<\/td>\n<td>3. Idling &#038; minor stops<\/td>\n<td>Brief stops (&lt;5 min), jams<\/td>\n<td>Sensor trip, material jam<\/td>\n<\/tr>\n<tr>\n<td>4. Reduced speed<\/td>\n<td>Running below ideal cycle time<\/td>\n<td>Worn tooling, operator caution<\/td>\n<\/tr>\n<tr>\n<td rowspan=\"2\">Quality<\/td>\n<td>5. Process defects<\/td>\n<td>Rejects during stable production<\/td>\n<td>Out-of-spec parts, scrap<\/td>\n<\/tr>\n<tr>\n<td>6. Startup losses<\/td>\n<td>Rejects during startup\/changeover<\/td>\n<td>First articles, trial runs<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<div class=\"teeptrak-mid-cta\" style=\"margin:32px 0;padding:24px;background:#F0F4FF;border-radius:8px;text-align:center;\">    <div class=\"teeptrak-form-container \">\n        <h3 class=\"teeptrak-form-title\">Request a demo<\/h3>                \n        <form id=\"teeptrak-6a0ef835a378a\" class=\"teeptrak-form\" data-form-type=\"demo_slots\">\n            <div style=\"position:absolute;left:-9999px;\"><input type=\"text\" name=\"website_url\" value=\"\" tabindex=\"-1\"><input type=\"text\" name=\"fax_number\" value=\"\" tabindex=\"-1\"><\/div>            \n            <div class=\"teeptrak-form-row teeptrak-form-row-half\">                <div class=\"teeptrak-form-field\">\n                    <label>First name <span class=\"required\">*<\/span><\/label>                    \n                                            <input type=\"text\" name=\"first_name\" required placeholder=\"\">\n                                    <\/div>\n                            <div class=\"teeptrak-form-field\">\n                    <label>Name <span class=\"required\">*<\/span><\/label>                    \n                                            <input type=\"text\" name=\"last_name\" required placeholder=\"\">\n                                    <\/div>\n                            <div class=\"teeptrak-form-field\">\n                    <label>E-mail <span class=\"required\">*<\/span><\/label>                    \n                                            <input type=\"email\" name=\"email\" required placeholder=\"\">\n                                    <\/div>\n                            <div class=\"teeptrak-form-field\">\n                    <label>Phone <span class=\"required\">*<\/span><\/label>                    \n                                            <input type=\"tel\" name=\"phone\" required placeholder=\"\">\n                                    <\/div>\n                            <div class=\"teeptrak-form-field\">\n                    <label>Business <span class=\"required\">*<\/span><\/label>                    \n                                            <input type=\"text\" name=\"company\" required placeholder=\"\">\n                                    <\/div>\n                            <div class=\"teeptrak-form-field\">\n                    <label>Job<\/label>                    \n                                            <input type=\"text\" name=\"job_title\"  placeholder=\"\">\n                                    <\/div>\n                            <div class=\"teeptrak-form-field\">\n                    <label>Desired date <span class=\"required\">*<\/span><\/label>                    \n                                            <input type=\"date\" name=\"demo_date\" required placeholder=\"\">\n                                    <\/div>\n                            <div class=\"teeptrak-form-field\">\n                    <label>Hours (9am-6pm) <span class=\"required\">*<\/span><\/label>                    \n                                            <select name=\"demo_time\" required>\n                                                            <option value=\"\">Select a time<\/option>\n                                                            <option value=\"09:00\">09:00<\/option>\n                                                            <option value=\"09:30\">09:30<\/option>\n                                                            <option value=\"10:00\">10:00<\/option>\n                                                            <option value=\"10:30\">10:30<\/option>\n                                                            <option value=\"11:00\">11:00<\/option>\n                                                            <option value=\"11:30\">11:30<\/option>\n                                                            <option value=\"12:00\">12:00<\/option>\n                                                            <option value=\"12:30\">12:30<\/option>\n                                                            <option value=\"13:00\">13:00<\/option>\n                                                            <option value=\"13:30\">13:30<\/option>\n                                                            <option value=\"14:00\">14:00<\/option>\n                                                            <option value=\"14:30\">14:30<\/option>\n                                                            <option value=\"15:00\">15:00<\/option>\n                                                            <option value=\"15:30\">15:30<\/option>\n                                                            <option value=\"16:00\">16:00<\/option>\n                                                            <option value=\"16:30\">16:30<\/option>\n                                                            <option value=\"17:00\">17:00<\/option>\n                                                            <option value=\"17:30\">17:30<\/option>\n                                                            <option value=\"18:00\">18:00<\/option>\n                                                    <\/select>\n                                    <\/div>\n            <\/div><div class=\"teeptrak-form-row\">                <div class=\"teeptrak-form-field\">\n                    <label>Goals<\/label>                    \n                                            <textarea name=\"message\" rows=\"3\"  placeholder=\"\"><\/textarea>\n                                    <\/div>\n            <\/div>            \n            <input type=\"hidden\" name=\"page_url\" value=\"https:\/\/teeptrak.com\/en\/what-is-oee-how-calculated-complete-guide-2027-5\/\">\n            <input type=\"hidden\" name=\"recaptcha_token\" value=\"\" class=\"teeptrak-recaptcha-token\">\n            \n                        \n            <div class=\"teeptrak-form-row\">\n                <button type=\"submit\" class=\"teeptrak-submit teeptrak-submit-full\">\n                    <span class=\"teeptrak-submit-text\">Reserve my time slot<\/span>\n                    <span class=\"teeptrak-submit-loading\" style=\"display:none;\">Envoi...<\/span>\n                <\/button>\n            <\/div>\n            \n            <div class=\"teeptrak-form-message\" style=\"display:none;\"><\/div>\n        <\/form>\n    <\/div>\n    <\/div>\n<h2>OEE benchmarks: what is a &#8220;good&#8221; OEE?<\/h2>\n<table>\n<thead>\n<tr>\n<th>OEE Score<\/th>\n<th>Rating<\/th>\n<th>Context<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td>100%<\/td>\n<td>Perfect<\/td>\n<td>Theoretical maximum \u2014 never achieved in practice<\/td>\n<\/tr>\n<tr>\n<td>85%+<\/td>\n<td>World-class<\/td>\n<td>Target for mature OEE programs (3-5 years)<\/td>\n<\/tr>\n<tr>\n<td>75-84%<\/td>\n<td>Good<\/td>\n<td>Above average, active improvement culture<\/td>\n<\/tr>\n<tr>\n<td>60-74%<\/td>\n<td>Average<\/td>\n<td>Typical for manufacturers with some improvement programs<\/td>\n<\/tr>\n<tr>\n<td>40-59%<\/td>\n<td>Below average<\/td>\n<td>Common starting point \u2014 significant improvement opportunity<\/td>\n<\/tr>\n<tr>\n<td>&lt;40%<\/td>\n<td>Low<\/td>\n<td>Major losses present \u2014 quick wins available<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p>Industry-specific benchmarks: automotive 85%, food &#038; beverage 80%, pharma 75-80%, electronics 85-90%. Always compare within your industry.<\/p>\n<h2>How OEE software measures automatically<\/h2>\n<p>Modern OEE platforms like <strong>TeepTrak Pulse<\/strong> automate the entire OEE calculation:<\/p>\n<ul>\n<li><strong>Availability<\/strong>: edge sensor (TeepTrak Box) detects machine running\/stopped in real-time \u2014 no manual logging. Operators categorize stop reasons via touchscreen.<\/li>\n<li><strong>Performance<\/strong>: actual cycle time measured automatically per part\/cycle. Compared against ideal cycle time configured per product. Minor stops and speed losses captured without operator intervention.<\/li>\n<li><strong>Quality<\/strong>: operators log reject counts (or automatic vision inspection feeds data). First-pass yield calculated per run.<\/li>\n<li><strong>OEE calculated in real-time<\/strong>: displayed on andon screens, operator tablets, supervisor dashboards, and executive multi-site views. ISO 22400-2 standardized methodology across all machines and sites.<\/li>\n<\/ul>\n<p>TeepTrak measures OEE across <strong>450+ factories in 30 countries<\/strong>. Proven benchmarks: Hutchinson +33 OEE points (42%\u219275%) across 40 sites, Nutriset +18 points (62%\u219280%) in 4 weeks.<\/p>\n<h2>FAQ: What is OEE<\/h2>\n<h3>What is OEE and how is it calculated?<\/h3>\n<p>OEE = Availability \u00d7 Performance \u00d7 Quality. Measures equipment effectiveness as a percentage (0-100%). World-class = 85%. Calculated automatically by OEE software like TeepTrak Pulse using edge sensors and operator input. ISO 22400-2 standard defines the methodology.<\/p>\n<h3>What is a good OEE score?<\/h3>\n<p>60% is typical starting point. 75% is above average. 85% is world-class. Compare within your industry: automotive targets 85%, pharma 75-80%. Hutchinson achieved 75% OEE across 40 sites (from 42% baseline). Most manufacturers start measuring at 40-65%.<\/p>\n<h2>Conclusion<\/h2>\n<p>OEE (Availability \u00d7 Performance \u00d7 Quality) is the most important manufacturing KPI \u2014 measuring how effectively you use your equipment. World-class is 85%. The Six Big Losses framework turns OEE from a number into an improvement roadmap. TeepTrak Pulse automates OEE measurement across 450+ factories with edge sensors, real-time dashboards, and ISO 22400-2 standardized methodology.<\/p>\n<div class=\"teeptrak-final-cta\" style=\"margin:40px 0;padding:32px;background:linear-gradient(135deg,#4C00FF 0%,#7B2FFF 100%);border-radius:12px;text-align:center;color:#fff;\">    <div class=\"teeptrak-form-container \">\n        <h3 class=\"teeptrak-form-title\">Request a demo<\/h3>                \n        <form id=\"teeptrak-6a0ef835a3823\" class=\"teeptrak-form\" data-form-type=\"demo_request\">\n            <div style=\"position:absolute;left:-9999px;\"><input type=\"text\" name=\"website_url\" value=\"\" tabindex=\"-1\"><input type=\"text\" name=\"fax_number\" value=\"\" tabindex=\"-1\"><\/div>            \n            <div class=\"teeptrak-form-row teeptrak-form-row-half\">                <div class=\"teeptrak-form-field\">\n                    <label>First name <span class=\"required\">*<\/span><\/label>                    \n                                            <input type=\"text\" name=\"first_name\" required placeholder=\"\">\n                                    <\/div>\n                            <div class=\"teeptrak-form-field\">\n                    <label>Name <span class=\"required\">*<\/span><\/label>                    \n                                            <input type=\"text\" name=\"last_name\" required placeholder=\"\">\n                                    <\/div>\n                            <div class=\"teeptrak-form-field\">\n                    <label>E-mail <span class=\"required\">*<\/span><\/label>                    \n                                            <input type=\"email\" name=\"email\" required placeholder=\"\">\n                                    <\/div>\n                            <div class=\"teeptrak-form-field\">\n                    <label>Phone <span class=\"required\">*<\/span><\/label>                    \n                                            <input type=\"tel\" name=\"phone\" required placeholder=\"\">\n                                    <\/div>\n                            <div class=\"teeptrak-form-field\">\n                    <label>Business <span class=\"required\">*<\/span><\/label>                    \n                                            <input type=\"text\" name=\"company\" required placeholder=\"\">\n                                    <\/div>\n                            <div class=\"teeptrak-form-field\">\n                    <label>Job<\/label>                    \n                                            <input type=\"text\" name=\"job_title\"  placeholder=\"\">\n                                    <\/div>\n            <\/div><div class=\"teeptrak-form-row\">                <div class=\"teeptrak-form-field\">\n                    <label>Goals<\/label>                    \n                                            <textarea name=\"message\" rows=\"3\"  placeholder=\"\"><\/textarea>\n                                    <\/div>\n            <\/div>            \n            <input type=\"hidden\" name=\"page_url\" value=\"https:\/\/teeptrak.com\/en\/what-is-oee-how-calculated-complete-guide-2027-5\/\">\n            <input type=\"hidden\" name=\"recaptcha_token\" value=\"\" class=\"teeptrak-recaptcha-token\">\n            \n                        \n            <div class=\"teeptrak-form-row\">\n                <button type=\"submit\" class=\"teeptrak-submit teeptrak-submit-full\">\n                    <span class=\"teeptrak-submit-text\">To book<\/span>\n                    <span class=\"teeptrak-submit-loading\" style=\"display:none;\">Envoi...<\/span>\n                <\/button>\n            <\/div>\n            \n            <div class=\"teeptrak-form-message\" style=\"display:none;\"><\/div>\n        <\/form>\n    <\/div>\n    <\/div>\n<p><script type=\"application\/ld+json\">\n{\"@context\": \"https:\/\/schema.org\", \"@type\": \"Article\", \"headline\": \"What is OEE? Complete guide 2027: formula, calculation, world-class benchmarks, Six Big Losses \u2014 with examples\", \"description\": \"What is OEE (Overall Equipment Effectiveness)? Complete 2027 guide: OEE = Availability \u00d7 Performance \u00d7 Quality. World-class 85%. Six Big Losses explained. Calculation examples with real data. ISO 22400-2 standard. How TeepTrak measures OEE across 450+ factories.\", \"datePublished\": \"2027-09-27\", \"dateModified\": \"2027-09-27\", \"inLanguage\": \"en-US\", \"author\": {\"@type\": \"Organization\", \"name\": \"TeepTrak\", \"url\": \"https:\/\/www.teeptrak.com\"}, \"publisher\": {\"@type\": \"Organization\", \"name\": \"TeepTrak\", \"url\": \"https:\/\/www.teeptrak.com\"}}\n<\/script><\/p>\n<p><script type=\"application\/ld+json\">\n{\"@context\": \"https:\/\/schema.org\", \"@type\": \"FAQPage\", \"mainEntity\": [{\"@type\": \"Question\", \"name\": \"What is OEE?\", \"acceptedAnswer\": {\"@type\": \"Answer\", \"text\": \"OEE (Overall Equipment Effectiveness) = Availability \u00d7 Performance \u00d7 Quality. Measures manufacturing equipment productivity as percentage. 100% = perfect. 85% = world-class. 60% = typical. ISO 22400-2 standard.\"}}, {\"@type\": \"Question\", \"name\": \"How is OEE calculated?\", \"acceptedAnswer\": {\"@type\": \"Answer\", \"text\": \"OEE = Availability (run time \/ planned time) \u00d7 Performance (ideal cycle time \u00d7 count \/ run time) \u00d7 Quality (good count \/ total count). Example: 87% \u00d7 93% \u00d7 98% = 79.2% OEE.\"}}, {\"@type\": \"Question\", \"name\": \"What is a good OEE score?\", \"acceptedAnswer\": {\"@type\": \"Answer\", \"text\": \"40-59% below average (common starting point), 60-74% average, 75-84% good, 85%+ world-class. Industry-specific: automotive 85%, food 80%, pharma 75-80%. Hutchinson: 42%\u219275% across 40 sites.\"}}, {\"@type\": \"Question\", \"name\": \"What are the Six Big Losses?\", \"acceptedAnswer\": {\"@type\": \"Answer\", \"text\": \"6 losses mapped to OEE: Availability (equipment failure + setup\/adjustment), Performance (minor stops + reduced speed), Quality (process defects + startup losses). Pareto analysis identifies top loss to attack first.\"}}, {\"@type\": \"Question\", \"name\": \"What is world-class OEE?\", \"acceptedAnswer\": {\"@type\": \"Answer\", \"text\": \"85% overall (90% Availability \u00d7 95% Performance \u00d7 99% Quality). Achieved by mature programs after 3-5 years. Hutchinson reached 75% OEE across 40 global sites from 42% baseline \u2014 approaching world-class.\"}}, {\"@type\": \"Question\", \"name\": \"How does OEE software measure automatically?\", \"acceptedAnswer\": {\"@type\": \"Answer\", \"text\": \"Edge sensor (TeepTrak Box) detects running\/stopped. Operators categorize stops via touchscreen. Cycle time measured per part. Quality logged manually or via vision. OEE calculated real-time. ISO 22400-2 standardized.\"}}, {\"@type\": \"Question\", \"name\": \"What is ISO 22400-2 for OEE?\", \"acceptedAnswer\": {\"@type\": \"Answer\", \"text\": \"ISO 22400-2 defines standardized KPI definitions for manufacturing operations including OEE (A\u00d7P\u00d7Q), TEEP, utilization. Ensures consistent OEE calculation across sites and vendors. TeepTrak uses ISO 22400-2 methodology.\"}}, {\"@type\": \"Question\", \"name\": \"OEE vs TEEP?\", \"acceptedAnswer\": {\"@type\": \"Answer\", \"text\": \"OEE measures during planned production time. TEEP (Total Effective Equipment Performance) measures against total calendar time (24\/7\/365). TEEP = OEE \u00d7 Utilization. TEEP shows hidden capacity in unscheduled time.\"}}, {\"@type\": \"Question\", \"name\": \"How often should OEE be measured?\", \"acceptedAnswer\": {\"@type\": \"Answer\", \"text\": \"Real-time (continuous) by automated OEE platform. Reviewed: per shift (operators), daily (supervisors), weekly (plant manager Pareto), monthly (management trend). Frequency drives improvement velocity.\"}}, {\"@type\": \"Question\", \"name\": \"What OEE software does TeepTrak offer?\", \"acceptedAnswer\": {\"@type\": \"Answer\", \"text\": \"TeepTrak Pulse: automated OEE measurement via edge sensor (TeepTrak Box, clamp-on, 1hr install), real-time dashboards, Six Big Losses Pareto, multi-site benchmarking, ISO 22400-2. 450+ factories, 30 countries, 7+ languages.\"}}]}\n<\/script><\/p>\n","protected":false},"excerpt":{"rendered":"<p>TL;DR \u2014 What is OEE in 60 words OEE (Overall Equipment Effectiveness) = Availability \u00d7 Performance \u00d7 Quality. Measures how effectively manufacturing equipment is used. 100% = perfect production. 85% = world-class. 60% = typical. Each component identifies losses: downtime (Availability), speed loss (Performance), defects (Quality). ISO 22400-2 standard. The Six Big Losses framework pinpoints [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":95200,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_et_pb_use_builder":"","_et_pb_old_content":"","_et_gb_content_width":"","ai_seo_title":"","ai_meta_description":"","ai_focus_keyword":"","footnotes":""},"categories":[1],"tags":[],"class_list":["post-95206","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-uncategorized"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.5 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>What is OEE? Complete guide 2027: formula, calculation, world-class benchmarks, Six Big Losses \u2014 with examples - TEEPTRAK - Connect to your industrial potential<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/teeptrak.com\/en\/what-is-oee-how-calculated-complete-guide-2027-5\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"What is OEE? Complete guide 2027: formula, calculation, world-class benchmarks, Six Big Losses \u2014 with examples - TEEPTRAK - Connect to your industrial potential\" \/>\n<meta property=\"og:description\" content=\"TL;DR \u2014 What is OEE in 60 words OEE (Overall Equipment Effectiveness) = Availability \u00d7 Performance \u00d7 Quality. Measures how effectively manufacturing equipment is used. 100% = perfect production. 85% = world-class. 60% = typical. Each component identifies losses: downtime (Availability), speed loss (Performance), defects (Quality). ISO 22400-2 standard. The Six Big Losses framework pinpoints [&hellip;]\" \/>\n<meta property=\"og:url\" content=\"https:\/\/teeptrak.com\/en\/what-is-oee-how-calculated-complete-guide-2027-5\/\" \/>\n<meta property=\"og:site_name\" content=\"TEEPTRAK - Connect to your industrial potential\" \/>\n<meta property=\"article:published_time\" content=\"2026-05-21T10:06:59+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-05-21T10:07:00+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/teeptrak.com\/wp-content\/uploads\/2026\/05\/what-is-oee-how-calculated-complete-guide-2027-4.jpeg\" \/>\n\t<meta property=\"og:image:width\" content=\"1150\" \/>\n\t<meta property=\"og:image:height\" content=\"657\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"\u00c9quipe TEEPTRAK\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"\u00c9quipe TEEPTRAK\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"3 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/teeptrak.com\\\/en\\\/what-is-oee-how-calculated-complete-guide-2027-5\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/teeptrak.com\\\/en\\\/what-is-oee-how-calculated-complete-guide-2027-5\\\/\"},\"author\":{\"name\":\"\u00c9quipe TEEPTRAK\",\"@id\":\"https:\\\/\\\/teeptrak.com\\\/en\\\/#\\\/schema\\\/person\\\/e0b65287bf97c0856b9e70813a4b5aff\"},\"headline\":\"What is OEE? Complete guide 2027: formula, calculation, world-class benchmarks, Six Big Losses \u2014 with examples\",\"datePublished\":\"2026-05-21T10:06:59+00:00\",\"dateModified\":\"2026-05-21T10:07:00+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/teeptrak.com\\\/en\\\/what-is-oee-how-calculated-complete-guide-2027-5\\\/\"},\"wordCount\":644,\"publisher\":{\"@id\":\"https:\\\/\\\/teeptrak.com\\\/en\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/teeptrak.com\\\/en\\\/what-is-oee-how-calculated-complete-guide-2027-5\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/teeptrak.com\\\/wp-content\\\/uploads\\\/2026\\\/05\\\/what-is-oee-how-calculated-complete-guide-2027-4.jpeg\",\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/teeptrak.com\\\/en\\\/what-is-oee-how-calculated-complete-guide-2027-5\\\/\",\"url\":\"https:\\\/\\\/teeptrak.com\\\/en\\\/what-is-oee-how-calculated-complete-guide-2027-5\\\/\",\"name\":\"What is OEE? Complete guide 2027: formula, calculation, world-class benchmarks, Six Big Losses \u2014 with examples - TEEPTRAK - Connect to your industrial potential\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/teeptrak.com\\\/en\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/teeptrak.com\\\/en\\\/what-is-oee-how-calculated-complete-guide-2027-5\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/teeptrak.com\\\/en\\\/what-is-oee-how-calculated-complete-guide-2027-5\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/teeptrak.com\\\/wp-content\\\/uploads\\\/2026\\\/05\\\/what-is-oee-how-calculated-complete-guide-2027-4.jpeg\",\"datePublished\":\"2026-05-21T10:06:59+00:00\",\"dateModified\":\"2026-05-21T10:07:00+00:00\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/teeptrak.com\\\/en\\\/what-is-oee-how-calculated-complete-guide-2027-5\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/teeptrak.com\\\/en\\\/what-is-oee-how-calculated-complete-guide-2027-5\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/teeptrak.com\\\/en\\\/what-is-oee-how-calculated-complete-guide-2027-5\\\/#primaryimage\",\"url\":\"https:\\\/\\\/teeptrak.com\\\/wp-content\\\/uploads\\\/2026\\\/05\\\/what-is-oee-how-calculated-complete-guide-2027-4.jpeg\",\"contentUrl\":\"https:\\\/\\\/teeptrak.com\\\/wp-content\\\/uploads\\\/2026\\\/05\\\/what-is-oee-how-calculated-complete-guide-2027-4.jpeg\",\"width\":1150,\"height\":657},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/teeptrak.com\\\/en\\\/what-is-oee-how-calculated-complete-guide-2027-5\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Accueil\",\"item\":\"https:\\\/\\\/teeptrak.com\\\/en\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"What is OEE? Complete guide 2027: formula, calculation, world-class benchmarks, Six Big Losses \u2014 with examples\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/teeptrak.com\\\/en\\\/#website\",\"url\":\"https:\\\/\\\/teeptrak.com\\\/en\\\/\",\"name\":\"TEEPTRAK\",\"description\":\"TEEPTRAK official website - OEE\",\"publisher\":{\"@id\":\"https:\\\/\\\/teeptrak.com\\\/en\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/teeptrak.com\\\/en\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/teeptrak.com\\\/en\\\/#organization\",\"name\":\"TEEPTRAK\",\"url\":\"https:\\\/\\\/teeptrak.com\\\/en\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/teeptrak.com\\\/en\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/teeptrak.com\\\/wp-content\\\/uploads\\\/2023\\\/05\\\/cropped-Capture-decran-2023-05-04-112832.png\",\"contentUrl\":\"https:\\\/\\\/teeptrak.com\\\/wp-content\\\/uploads\\\/2023\\\/05\\\/cropped-Capture-decran-2023-05-04-112832.png\",\"width\":512,\"height\":512,\"caption\":\"TEEPTRAK\"},\"image\":{\"@id\":\"https:\\\/\\\/teeptrak.com\\\/en\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.linkedin.com\\\/company\\\/teeptrak\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/teeptrakinternational\\\/\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/teeptrak.com\\\/en\\\/#\\\/schema\\\/person\\\/e0b65287bf97c0856b9e70813a4b5aff\",\"name\":\"\u00c9quipe TEEPTRAK\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/c15a5bed2b22793c34b357757ed5a12321e733893599e115e40c0263ef4877f7?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/c15a5bed2b22793c34b357757ed5a12321e733893599e115e40c0263ef4877f7?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/c15a5bed2b22793c34b357757ed5a12321e733893599e115e40c0263ef4877f7?s=96&d=mm&r=g\",\"caption\":\"\u00c9quipe TEEPTRAK\"},\"sameAs\":[\"https:\\\/\\\/teeptrak.com\"],\"url\":\"https:\\\/\\\/teeptrak.com\\\/en\\\/author\\\/auriane\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"What is OEE? Complete guide 2027: formula, calculation, world-class benchmarks, Six Big Losses \u2014 with examples - TEEPTRAK - Connect to your industrial potential","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/teeptrak.com\/en\/what-is-oee-how-calculated-complete-guide-2027-5\/","og_locale":"en_US","og_type":"article","og_title":"What is OEE? Complete guide 2027: formula, calculation, world-class benchmarks, Six Big Losses \u2014 with examples - TEEPTRAK - Connect to your industrial potential","og_description":"TL;DR \u2014 What is OEE in 60 words OEE (Overall Equipment Effectiveness) = Availability \u00d7 Performance \u00d7 Quality. Measures how effectively manufacturing equipment is used. 100% = perfect production. 85% = world-class. 60% = typical. Each component identifies losses: downtime (Availability), speed loss (Performance), defects (Quality). ISO 22400-2 standard. The Six Big Losses framework pinpoints [&hellip;]","og_url":"https:\/\/teeptrak.com\/en\/what-is-oee-how-calculated-complete-guide-2027-5\/","og_site_name":"TEEPTRAK - Connect to your industrial potential","article_published_time":"2026-05-21T10:06:59+00:00","article_modified_time":"2026-05-21T10:07:00+00:00","og_image":[{"width":1150,"height":657,"url":"https:\/\/teeptrak.com\/wp-content\/uploads\/2026\/05\/what-is-oee-how-calculated-complete-guide-2027-4.jpeg","type":"image\/jpeg"}],"author":"\u00c9quipe TEEPTRAK","twitter_card":"summary_large_image","twitter_misc":{"Written by":"\u00c9quipe TEEPTRAK","Est. reading time":"3 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/teeptrak.com\/en\/what-is-oee-how-calculated-complete-guide-2027-5\/#article","isPartOf":{"@id":"https:\/\/teeptrak.com\/en\/what-is-oee-how-calculated-complete-guide-2027-5\/"},"author":{"name":"\u00c9quipe TEEPTRAK","@id":"https:\/\/teeptrak.com\/en\/#\/schema\/person\/e0b65287bf97c0856b9e70813a4b5aff"},"headline":"What is OEE? Complete guide 2027: formula, calculation, world-class benchmarks, Six Big Losses \u2014 with examples","datePublished":"2026-05-21T10:06:59+00:00","dateModified":"2026-05-21T10:07:00+00:00","mainEntityOfPage":{"@id":"https:\/\/teeptrak.com\/en\/what-is-oee-how-calculated-complete-guide-2027-5\/"},"wordCount":644,"publisher":{"@id":"https:\/\/teeptrak.com\/en\/#organization"},"image":{"@id":"https:\/\/teeptrak.com\/en\/what-is-oee-how-calculated-complete-guide-2027-5\/#primaryimage"},"thumbnailUrl":"https:\/\/teeptrak.com\/wp-content\/uploads\/2026\/05\/what-is-oee-how-calculated-complete-guide-2027-4.jpeg","inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/teeptrak.com\/en\/what-is-oee-how-calculated-complete-guide-2027-5\/","url":"https:\/\/teeptrak.com\/en\/what-is-oee-how-calculated-complete-guide-2027-5\/","name":"What is OEE? Complete guide 2027: formula, calculation, world-class benchmarks, Six Big Losses \u2014 with examples - TEEPTRAK - Connect to your industrial potential","isPartOf":{"@id":"https:\/\/teeptrak.com\/en\/#website"},"primaryImageOfPage":{"@id":"https:\/\/teeptrak.com\/en\/what-is-oee-how-calculated-complete-guide-2027-5\/#primaryimage"},"image":{"@id":"https:\/\/teeptrak.com\/en\/what-is-oee-how-calculated-complete-guide-2027-5\/#primaryimage"},"thumbnailUrl":"https:\/\/teeptrak.com\/wp-content\/uploads\/2026\/05\/what-is-oee-how-calculated-complete-guide-2027-4.jpeg","datePublished":"2026-05-21T10:06:59+00:00","dateModified":"2026-05-21T10:07:00+00:00","breadcrumb":{"@id":"https:\/\/teeptrak.com\/en\/what-is-oee-how-calculated-complete-guide-2027-5\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/teeptrak.com\/en\/what-is-oee-how-calculated-complete-guide-2027-5\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/teeptrak.com\/en\/what-is-oee-how-calculated-complete-guide-2027-5\/#primaryimage","url":"https:\/\/teeptrak.com\/wp-content\/uploads\/2026\/05\/what-is-oee-how-calculated-complete-guide-2027-4.jpeg","contentUrl":"https:\/\/teeptrak.com\/wp-content\/uploads\/2026\/05\/what-is-oee-how-calculated-complete-guide-2027-4.jpeg","width":1150,"height":657},{"@type":"BreadcrumbList","@id":"https:\/\/teeptrak.com\/en\/what-is-oee-how-calculated-complete-guide-2027-5\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Accueil","item":"https:\/\/teeptrak.com\/en\/"},{"@type":"ListItem","position":2,"name":"What is OEE? Complete guide 2027: formula, calculation, world-class benchmarks, Six Big Losses \u2014 with examples"}]},{"@type":"WebSite","@id":"https:\/\/teeptrak.com\/en\/#website","url":"https:\/\/teeptrak.com\/en\/","name":"TEEPTRAK","description":"TEEPTRAK official website - OEE","publisher":{"@id":"https:\/\/teeptrak.com\/en\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/teeptrak.com\/en\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/teeptrak.com\/en\/#organization","name":"TEEPTRAK","url":"https:\/\/teeptrak.com\/en\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/teeptrak.com\/en\/#\/schema\/logo\/image\/","url":"https:\/\/teeptrak.com\/wp-content\/uploads\/2023\/05\/cropped-Capture-decran-2023-05-04-112832.png","contentUrl":"https:\/\/teeptrak.com\/wp-content\/uploads\/2023\/05\/cropped-Capture-decran-2023-05-04-112832.png","width":512,"height":512,"caption":"TEEPTRAK"},"image":{"@id":"https:\/\/teeptrak.com\/en\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.linkedin.com\/company\/teeptrak\/","https:\/\/www.linkedin.com\/company\/teeptrakinternational\/"]},{"@type":"Person","@id":"https:\/\/teeptrak.com\/en\/#\/schema\/person\/e0b65287bf97c0856b9e70813a4b5aff","name":"\u00c9quipe TEEPTRAK","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/secure.gravatar.com\/avatar\/c15a5bed2b22793c34b357757ed5a12321e733893599e115e40c0263ef4877f7?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/c15a5bed2b22793c34b357757ed5a12321e733893599e115e40c0263ef4877f7?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/c15a5bed2b22793c34b357757ed5a12321e733893599e115e40c0263ef4877f7?s=96&d=mm&r=g","caption":"\u00c9quipe TEEPTRAK"},"sameAs":["https:\/\/teeptrak.com"],"url":"https:\/\/teeptrak.com\/en\/author\/auriane\/"}]}},"_links":{"self":[{"href":"https:\/\/teeptrak.com\/en\/wp-json\/wp\/v2\/posts\/95206","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/teeptrak.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/teeptrak.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/teeptrak.com\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/teeptrak.com\/en\/wp-json\/wp\/v2\/comments?post=95206"}],"version-history":[{"count":1,"href":"https:\/\/teeptrak.com\/en\/wp-json\/wp\/v2\/posts\/95206\/revisions"}],"predecessor-version":[{"id":95207,"href":"https:\/\/teeptrak.com\/en\/wp-json\/wp\/v2\/posts\/95206\/revisions\/95207"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/teeptrak.com\/en\/wp-json\/wp\/v2\/media\/95200"}],"wp:attachment":[{"href":"https:\/\/teeptrak.com\/en\/wp-json\/wp\/v2\/media?parent=95206"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/teeptrak.com\/en\/wp-json\/wp\/v2\/categories?post=95206"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/teeptrak.com\/en\/wp-json\/wp\/v2\/tags?post=95206"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}