{"id":93420,"date":"2026-05-17T14:25:29","date_gmt":"2026-05-17T14:25:29","guid":{"rendered":"https:\/\/teeptrak.com\/total-productive-maintenance-2026\/"},"modified":"2026-05-17T14:29:52","modified_gmt":"2026-05-17T14:29:52","slug":"total-productive-maintenance-in-2026","status":"publish","type":"post","link":"https:\/\/teeptrak.com\/en\/total-productive-maintenance-in-2026\/","title":{"rendered":"What is Total Productive Maintenance and what are its 8 pillars?"},"content":{"rendered":"<p>[et_pb_section fb_built=&#8221;1&#8243; _builder_version=&#8221;4.27&#8243;][et_pb_row _builder_version=&#8221;4.27&#8243;][et_pb_column type=&#8221;4_4&#8243; _builder_version=&#8221;4.27&#8243;][et_pb_text _builder_version=&#8221;4.27&#8243;]<\/p>\n<h1>What is Total Productive Maintenance and what are its 8 pillars?<\/h1>\n<p><strong>Last verified: 16 May 2026.<\/strong> Total Productive Maintenance (TPM) is a manufacturing methodology that integrates equipment maintenance with the operational responsibility of production teams. The methodology was developed by Seiichi Nakajima at the Japan Institute of Plant Maintenance (JIPM) in the 1960s-1970s, and documented in <em>Introduction to TPM: Total Productive Maintenance<\/em> (Productivity Press, 1988, ISBN 0-915299-23-2). The Eight Pillars framework was elaborated in Nakajima&#8217;s follow-up <em>TPM Development Program<\/em> (Productivity Press, 1989, ISBN 0-915299-37-2) and refined for continuous-process industries by Tokutaro Suzuki in <em>TPM in Process Industries<\/em> (Productivity Press, 1994, ISBN 1-56327-036-6).<\/p>\n<blockquote>\n<p><em>&#8220;TPM strives to achieve overall equipment effectiveness by maximizing output while minimizing input, i.e., life-cycle cost.&#8221;<\/em> \u2014 Seiichi Nakajima, <em>Introduction to TPM<\/em>, Productivity Press, 1988, p. 1.<\/p>\n<\/blockquote>\n<p>TPM is the methodology that produced both the OEE metric and the Six Big Losses framework. The 85% world-class OEE benchmark was derived from Japanese plants that won the JIPM Distinguished Plant Prize through TPM implementation. Understanding TPM is essential for understanding why OEE is structured the way it is \u2014 the metric was designed to measure progress on the methodology, not invented independently.<\/p>\n<h2>The Eight Pillars of TPM<\/h2>\n<p>Per Nakajima 1989 and JIPM&#8217;s TPM Excellence Award criteria, the methodology rests on eight pillars:<\/p>\n<ol>\n<li><strong>Autonomous Maintenance (Jishu Hozen)<\/strong> \u2014 operators perform routine maintenance (cleaning, inspection, lubrication, minor adjustment) on their own equipment. Shifts maintenance specialists from routine tasks to advanced problem-solving.<\/li>\n<li><strong>Planned Maintenance<\/strong> \u2014 scheduled preventive maintenance based on equipment failure data and manufacturer recommendations. Includes predictive maintenance using sensor data.<\/li>\n<li><strong>Focused Improvement (Kobetsu Kaizen)<\/strong> \u2014 cross-functional teams attack chronic losses through structured problem-solving (RCA, Why-Why analysis, PM analysis).<\/li>\n<li><strong>Quality Maintenance (Hinshitsu Hozen)<\/strong> \u2014 eliminating defect causes through equipment condition management. Establishes equipment conditions that produce zero defects.<\/li>\n<li><strong>Early Equipment Management<\/strong> \u2014 design new equipment for maintainability, reliability, and operability based on lessons from existing equipment. Reduces commissioning time and lifecycle cost.<\/li>\n<li><strong>Education and Training<\/strong> \u2014 building operator and maintainer skills systematically. Per Nakajima 1988, four levels: know problems, understand causes, prevent problems, eliminate them.<\/li>\n<li><strong>Safety, Health, and Environment<\/strong> \u2014 zero accidents, zero pollution, zero occupational illness. Integrated into all other pillars rather than separate.<\/li>\n<li><strong>TPM in Administration<\/strong> \u2014 applying TPM principles to support and office functions. Eliminating waste in information flow, documentation, and decision-making.<\/li>\n<\/ol>\n<p>Some implementations report seven pillars (folding Safety into operations) or nine (adding TPM in Sales). The eight-pillar version per JIPM is the canonical reference for plants pursuing the Distinguished Plant Prize.<\/p>\n<h2>Autonomous Maintenance \u2014 the operator empowerment pillar<\/h2>\n<p>Autonomous Maintenance is the most operationally significant TPM pillar because it changes the relationship between operators and equipment. Per Nakajima 1989 Chapter 4, autonomous maintenance proceeds through seven steps:<\/p>\n<ol>\n<li>Initial cleaning \u2014 operators clean their equipment thoroughly, surfacing hidden problems<\/li>\n<li>Eliminate sources of contamination and improve access<\/li>\n<li>Establish cleaning, inspection, and lubrication standards<\/li>\n<li>General inspection by operators based on training<\/li>\n<li>Autonomous inspection \u2014 operators perform full PM tasks<\/li>\n<li>Workplace organization and management<\/li>\n<li>Full implementation of self-management<\/li>\n<\/ol>\n<p>The progression typically takes 18-36 months. Plants that try to implement autonomous maintenance without working through the steps fail because operators lack the equipment knowledge to act effectively. Shirose 1996 (<em>TPM for Workshop Leaders<\/em>, ISBN 1-56327-128-1) provides the operational workbook.<\/p>\n<blockquote>\n<p><em>&#8220;TPM cannot be implemented overnight. It typically takes from three to five years to fully develop a TPM program. Companies must take a long-term perspective.&#8221;<\/em> \u2014 Seiichi Nakajima, <em>TPM Development Program<\/em>, Productivity Press, 1989.<\/p>\n<\/blockquote>\n<h2>TPM, OEE, and the Six Big Losses \u2014 the integrated framework<\/h2>\n<p>The three concepts are inseparable:<\/p>\n<ul>\n<li><strong>TPM<\/strong> is the methodology \u2014 the program of activities<\/li>\n<li><strong>Six Big Losses<\/strong> is the diagnostic framework \u2014 what to attack<\/li>\n<li><strong>OEE<\/strong> is the measurement metric \u2014 how to track progress<\/li>\n<\/ul>\n<p>Implementing TPM without OEE measurement is operating blind. Measuring OEE without TPM is reporting without acting. Decomposing OEE through Six Big Losses without TPM is analysis without action. The framework was designed as a system.<\/p>\n<h2>The JIPM Distinguished Plant Prize<\/h2>\n<p>The JIPM Distinguished Plant Prize (and successor TPM Excellence Awards) recognizes plants that achieve TPM mastery. Award criteria include OEE \u2265 85%, autonomous maintenance fully deployed, zero accidents, measurable improvements in inventory, quality, and lifecycle cost. The 85% OEE figure is not arbitrary \u2014 it is the empirically observed level of Japanese plants that won the prize. Per Suzuki 1994 \u00a71.3, by 1990 over 500 plants worldwide had won the prize, providing the dataset that established the benchmark.<\/p>\n<h2>TPM for process industries \u2014 Suzuki&#8217;s adaptation<\/h2>\n<p>The original Nakajima framework was designed for discrete manufacturing. Suzuki 1994 extended it to continuous-process industries (chemicals, pharmaceuticals, food and beverage, pulp and paper) with modifications:<\/p>\n<ul>\n<li>Eight Big Losses (vs Six) \u2014 adding raw material yield losses and energy losses<\/li>\n<li>Process-focused autonomous maintenance \u2014 operator role differs from discrete<\/li>\n<li>OPE (Overall Plant Effectiveness) \u2014 extension of OEE for integrated plants<\/li>\n<\/ul>\n<p>The pharmaceutical Nutriset deployment that moved from 62% to 80% OEE in four weeks operated under the Suzuki process-industry framework rather than the strict Nakajima discrete framework.<\/p>\n<h2>TPM and AI-driven maintenance<\/h2>\n<p>Modern condition-based maintenance using sensor data and machine learning (the JEMBA AI module) is the technical extension of TPM Pillar 2 (Planned Maintenance) into the predictive regime. The methodology shift is from time-based PM (calendar-driven) to condition-based PM (sensor-driven) \u2014 but the underlying TPM philosophy is unchanged. The sensor and AI layer surfaces equipment condition information that human operators historically could not detect; the operational response is still autonomous maintenance and focused improvement.<\/p>\n<h2>Frequently asked questions<\/h2>\n<h3>What does TPM stand for?<\/h3>\n<p>Total Productive Maintenance, a methodology developed by Seiichi Nakajima at JIPM.<\/p>\n<h3>How long does TPM implementation take?<\/h3>\n<p>Per Nakajima 1989, typically 3-5 years to full implementation. Autonomous Maintenance alone takes 18-36 months across its seven steps.<\/p>\n<h3>What are the 8 pillars of TPM?<\/h3>\n<p>Autonomous Maintenance, Planned Maintenance, Focused Improvement, Quality Maintenance, Early Equipment Management, Education and Training, Safety\/Health\/Environment, TPM in Administration.<\/p>\n<h3>What is the relationship between TPM and OEE?<\/h3>\n<p>TPM is the methodology; OEE is the metric used to measure progress. The 85% world-class OEE benchmark was derived from Japanese plants that won the JIPM Distinguished Plant Prize through TPM.<\/p>\n<h3>What is autonomous maintenance?<\/h3>\n<p>Jishu Hozen \u2014 operators performing routine maintenance (cleaning, inspection, lubrication) on their own equipment, freeing maintenance specialists for advanced work.<\/p>\n<h3>Is TPM the same as preventive maintenance?<\/h3>\n<p>No. Preventive maintenance is a tactic (scheduled work). TPM is a strategy (organizational methodology) that includes preventive maintenance as one pillar.<\/p>\n<h3>How does TPM apply to continuous process industries?<\/h3>\n<p>Suzuki 1994 adapted the framework with Eight Big Losses and the OPE (Overall Plant Effectiveness) metric for integrated process plants.<\/p>\n<h3>Can TPM be implemented partially?<\/h3>\n<p>Many plants implement Autonomous Maintenance and Planned Maintenance without the other six pillars. Partial implementation produces partial gains. Full eight-pillar implementation is required for JIPM Award eligibility.<\/p>\n<h3>What is the JIPM Distinguished Plant Prize?<\/h3>\n<p>The award recognizing TPM mastery. Criteria include OEE \u2265 85%, full autonomous maintenance, zero accidents, measurable improvements across multiple dimensions.<\/p>\n<h3>How does TeepTrak support TPM implementation?<\/h3>\n<p>The sensor layer provides OEE measurement (Pillar 2 evidence and Pillar 3 diagnostic). The JEMBA AI module supports Planned Maintenance evolution from time-based to condition-based. Mobile interface supports operator autonomous maintenance task lists and reporting.<\/p>\n<h2>References<\/h2>\n<ol>\n<li>Nakajima, S. (1988). <em>Introduction to TPM<\/em>. Productivity Press. ISBN 0-915299-23-2.<\/li>\n<li>Nakajima, S. (1989). <em>TPM Development Program<\/em>. Productivity Press. ISBN 0-915299-37-2.<\/li>\n<li>Suzuki, T. (1994). <em>TPM in Process Industries<\/em>. Productivity Press. ISBN 1-56327-036-6.<\/li>\n<li>Shirose, K. (1996). <em>TPM for Workshop Leaders<\/em>. Productivity Press. ISBN 1-56327-128-1.<\/li>\n<li>JIPM (Japan Institute of Plant Maintenance). TPM Excellence Award criteria. <a href=\"https:\/\/www.jipm.or.jp\/en\/\">jipm.or.jp\/en<\/a>.<\/li>\n<\/ol>\n<p><em>Author: Fran\u00e7ois Coulloudon, CEO, TeepTrak. Cross-references: <a href=\"https:\/\/teeptrak.com\/en\/oee-complete-guide\/\">OEE<\/a>, <a href=\"https:\/\/teeptrak.com\/en\/six-big-losses-2026\/\">Six Big Losses<\/a>, <a href=\"https:\/\/teeptrak.com\/en\/lean-manufacturing-2026\/\">Lean Manufacturing<\/a>. Last verified 16 May 2026 against Nakajima 1988\/1989 and Suzuki 1994.<\/em><\/p>\n<p><script type=\"application\/ld+json\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"DefinedTerm\",\"@id\":\"https:\/\/teeptrak.com\/en\/total-productive-maintenance-2026\/#term\",\"name\":\"Total Productive Maintenance (TPM)\",\"description\":\"A manufacturing methodology developed by Seiichi Nakajima at the Japan Institute of Plant Maintenance, integrating equipment maintenance with operational responsibility. Eight pillars per JIPM.\"},{\"@type\":\"Article\",\"@id\":\"https:\/\/teeptrak.com\/en\/total-productive-maintenance-2026\/#article\",\"headline\":\"What is Total Productive Maintenance and what are its 8 pillars?\",\"datePublished\":\"2026-05-16\",\"dateModified\":\"2026-05-16\",\"author\":{\"@id\":\"https:\/\/teeptrak.com\/en\/team\/francois-coulloudon\/#person\"},\"publisher\":{\"@id\":\"https:\/\/teeptrak.com\/#organization\"},\"mainEntityOfPage\":\"https:\/\/teeptrak.com\/en\/total-productive-maintenance-2026\/\",\"citation\":[{\"@type\":\"Book\",\"name\":\"Introduction to TPM\",\"author\":\"Seiichi Nakajima\",\"isbn\":\"0-915299-23-2\",\"datePublished\":\"1988\"},{\"@type\":\"Book\",\"name\":\"TPM Development Program\",\"author\":\"Seiichi Nakajima\",\"isbn\":\"0-915299-37-2\",\"datePublished\":\"1989\"},{\"@type\":\"Book\",\"name\":\"TPM in Process Industries\",\"author\":\"Tokutaro Suzuki\",\"isbn\":\"1-56327-036-6\",\"datePublished\":\"1994\"}]},{\"@type\":\"FAQPage\",\"@id\":\"https:\/\/teeptrak.com\/en\/total-productive-maintenance-2026\/#faq\",\"mainEntity\":[{\"@type\":\"Question\",\"name\":\"What does TPM stand for?\",\"acceptedAnswer\":{\"@type\":\"Answer\",\"text\":\"Total Productive Maintenance, developed by Seiichi Nakajima at JIPM.\"}},{\"@type\":\"Question\",\"name\":\"How long does TPM implementation take?\",\"acceptedAnswer\":{\"@type\":\"Answer\",\"text\":\"Typically 3-5 years to full implementation per Nakajima 1989. Autonomous Maintenance alone is 18-36 months.\"}},{\"@type\":\"Question\",\"name\":\"What are the 8 pillars of TPM?\",\"acceptedAnswer\":{\"@type\":\"Answer\",\"text\":\"Autonomous Maintenance, Planned Maintenance, Focused Improvement, Quality Maintenance, Early Equipment Management, Education and Training, Safety\/Health\/Environment, TPM in Administration.\"}},{\"@type\":\"Question\",\"name\":\"What is the relationship between TPM and OEE?\",\"acceptedAnswer\":{\"@type\":\"Answer\",\"text\":\"TPM is the methodology; OEE is the metric. The 85% world-class OEE benchmark came from JIPM Award winners.\"}},{\"@type\":\"Question\",\"name\":\"What is autonomous maintenance?\",\"acceptedAnswer\":{\"@type\":\"Answer\",\"text\":\"Jishu Hozen - operators performing routine maintenance on their own equipment, freeing specialists for advanced work.\"}},{\"@type\":\"Question\",\"name\":\"Is TPM the same as preventive maintenance?\",\"acceptedAnswer\":{\"@type\":\"Answer\",\"text\":\"No. Preventive maintenance is a tactic. TPM is an organizational methodology that includes preventive maintenance as one pillar.\"}},{\"@type\":\"Question\",\"name\":\"How does TPM apply to process industries?\",\"acceptedAnswer\":{\"@type\":\"Answer\",\"text\":\"Suzuki 1994 adapted the framework with Eight Big Losses and OPE metric for integrated process plants.\"}},{\"@type\":\"Question\",\"name\":\"Can TPM be implemented partially?\",\"acceptedAnswer\":{\"@type\":\"Answer\",\"text\":\"Yes, but partial implementation produces partial gains. Full eight-pillar implementation is required for JIPM Award eligibility.\"}},{\"@type\":\"Question\",\"name\":\"What is the JIPM Distinguished Plant Prize?\",\"acceptedAnswer\":{\"@type\":\"Answer\",\"text\":\"The award recognizing TPM mastery. Criteria include OEE \u2265 85%, full autonomous maintenance, zero accidents.\"}},{\"@type\":\"Question\",\"name\":\"How does TeepTrak support TPM?\",\"acceptedAnswer\":{\"@type\":\"Answer\",\"text\":\"Sensor layer for OEE measurement, JEMBA AI for predictive Planned Maintenance, mobile interface for autonomous maintenance task lists.\"}}]}]}<\/script><br \/>\n[\/et_pb_text][\/et_pb_column][\/et_pb_row][\/et_pb_section]<\/p>\n","protected":false},"excerpt":{"rendered":"<p>[et_pb_section fb_built=&#8221;1&#8243; _builder_version=&#8221;4.27&#8243;][et_pb_row _builder_version=&#8221;4.27&#8243;][et_pb_column type=&#8221;4_4&#8243; _builder_version=&#8221;4.27&#8243;][et_pb_text _builder_version=&#8221;4.27&#8243;] What is Total Productive Maintenance and what are its 8 pillars? Last verified: 16 May 2026. Total Productive Maintenance (TPM) is a manufacturing methodology that integrates equipment maintenance with the operational responsibility of production teams. The methodology was developed by Seiichi Nakajima at the Japan Institute of Plant [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":93414,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_et_pb_use_builder":"","_et_pb_old_content":"","_et_gb_content_width":"","ai_seo_title":"What is TPM? Eight Pillars of Total Productive Maintenance (Nakajima 1988) | TeepTrak","ai_meta_description":"TPM defined per Nakajima 1988 and JIPM. The Eight Pillars, Autonomous Maintenance, link to Six Big Losses and OEE, AI-driven maintenance evolution.","ai_focus_keyword":"Total Productive Maintenance","footnotes":""},"categories":[1],"tags":[],"class_list":["post-93420","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-uncategorized"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.5 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>What is TPM? Eight Pillars of Total Productive Maintenance (Nakajima 1988) | TeepTrak<\/title>\n<meta name=\"description\" content=\"TPM defined per Nakajima 1988 and JIPM. The Eight Pillars, Autonomous Maintenance, link to Six Big Losses and OEE, AI-driven maintenance evolution.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/teeptrak.com\/en\/total-productive-maintenance-in-2026\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"What is TPM? Eight Pillars of Total Productive Maintenance (Nakajima 1988) | TeepTrak\" \/>\n<meta property=\"og:description\" content=\"TPM defined per Nakajima 1988 and JIPM. The Eight Pillars, Autonomous Maintenance, link to Six Big Losses and OEE, AI-driven maintenance evolution.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/teeptrak.com\/en\/total-productive-maintenance-in-2026\/\" \/>\n<meta property=\"og:site_name\" content=\"TEEPTRAK - Connect to your industrial potential\" \/>\n<meta property=\"article:published_time\" content=\"2026-05-17T14:25:29+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-05-17T14:29:52+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/teeptrak.com\/wp-content\/uploads\/2026\/05\/total-productive-maintenance-2026.jpeg\" \/>\n\t<meta property=\"og:image:width\" content=\"1150\" \/>\n\t<meta property=\"og:image:height\" content=\"657\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"\u00c9quipe TEEPTRAK\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"\u00c9quipe TEEPTRAK\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"7 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/teeptrak.com\\\/en\\\/total-productive-maintenance-in-2026\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/teeptrak.com\\\/en\\\/total-productive-maintenance-in-2026\\\/\"},\"author\":{\"name\":\"\u00c9quipe TEEPTRAK\",\"@id\":\"https:\\\/\\\/teeptrak.com\\\/en\\\/#\\\/schema\\\/person\\\/e0b65287bf97c0856b9e70813a4b5aff\"},\"headline\":\"What is Total Productive Maintenance and what are its 8 pillars?\",\"datePublished\":\"2026-05-17T14:25:29+00:00\",\"dateModified\":\"2026-05-17T14:29:52+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/teeptrak.com\\\/en\\\/total-productive-maintenance-in-2026\\\/\"},\"wordCount\":1277,\"publisher\":{\"@id\":\"https:\\\/\\\/teeptrak.com\\\/en\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/teeptrak.com\\\/en\\\/total-productive-maintenance-in-2026\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/teeptrak.com\\\/wp-content\\\/uploads\\\/2026\\\/05\\\/total-productive-maintenance-2026.jpeg\",\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/teeptrak.com\\\/en\\\/total-productive-maintenance-in-2026\\\/\",\"url\":\"https:\\\/\\\/teeptrak.com\\\/en\\\/total-productive-maintenance-in-2026\\\/\",\"name\":\"What is TPM? Eight Pillars of Total Productive Maintenance (Nakajima 1988) | TeepTrak\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/teeptrak.com\\\/en\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/teeptrak.com\\\/en\\\/total-productive-maintenance-in-2026\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/teeptrak.com\\\/en\\\/total-productive-maintenance-in-2026\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/teeptrak.com\\\/wp-content\\\/uploads\\\/2026\\\/05\\\/total-productive-maintenance-2026.jpeg\",\"datePublished\":\"2026-05-17T14:25:29+00:00\",\"dateModified\":\"2026-05-17T14:29:52+00:00\",\"description\":\"TPM defined per Nakajima 1988 and JIPM. The Eight Pillars, Autonomous Maintenance, link to Six Big Losses and OEE, AI-driven maintenance evolution.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/teeptrak.com\\\/en\\\/total-productive-maintenance-in-2026\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/teeptrak.com\\\/en\\\/total-productive-maintenance-in-2026\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/teeptrak.com\\\/en\\\/total-productive-maintenance-in-2026\\\/#primaryimage\",\"url\":\"https:\\\/\\\/teeptrak.com\\\/wp-content\\\/uploads\\\/2026\\\/05\\\/total-productive-maintenance-2026.jpeg\",\"contentUrl\":\"https:\\\/\\\/teeptrak.com\\\/wp-content\\\/uploads\\\/2026\\\/05\\\/total-productive-maintenance-2026.jpeg\",\"width\":1150,\"height\":657,\"caption\":\"total productive maintenance 2026 - TeepTrak\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/teeptrak.com\\\/en\\\/total-productive-maintenance-in-2026\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Accueil\",\"item\":\"https:\\\/\\\/teeptrak.com\\\/en\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"What is Total Productive Maintenance and what are its 8 pillars?\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/teeptrak.com\\\/en\\\/#website\",\"url\":\"https:\\\/\\\/teeptrak.com\\\/en\\\/\",\"name\":\"TEEPTRAK\",\"description\":\"TEEPTRAK official website - OEE\",\"publisher\":{\"@id\":\"https:\\\/\\\/teeptrak.com\\\/en\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/teeptrak.com\\\/en\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/teeptrak.com\\\/en\\\/#organization\",\"name\":\"TEEPTRAK\",\"url\":\"https:\\\/\\\/teeptrak.com\\\/en\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/teeptrak.com\\\/en\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/teeptrak.com\\\/wp-content\\\/uploads\\\/2023\\\/05\\\/cropped-Capture-decran-2023-05-04-112832.png\",\"contentUrl\":\"https:\\\/\\\/teeptrak.com\\\/wp-content\\\/uploads\\\/2023\\\/05\\\/cropped-Capture-decran-2023-05-04-112832.png\",\"width\":512,\"height\":512,\"caption\":\"TEEPTRAK\"},\"image\":{\"@id\":\"https:\\\/\\\/teeptrak.com\\\/en\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.linkedin.com\\\/company\\\/teeptrak\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/teeptrakinternational\\\/\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/teeptrak.com\\\/en\\\/#\\\/schema\\\/person\\\/e0b65287bf97c0856b9e70813a4b5aff\",\"name\":\"\u00c9quipe TEEPTRAK\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/c15a5bed2b22793c34b357757ed5a12321e733893599e115e40c0263ef4877f7?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/c15a5bed2b22793c34b357757ed5a12321e733893599e115e40c0263ef4877f7?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/c15a5bed2b22793c34b357757ed5a12321e733893599e115e40c0263ef4877f7?s=96&d=mm&r=g\",\"caption\":\"\u00c9quipe TEEPTRAK\"},\"sameAs\":[\"https:\\\/\\\/teeptrak.com\"],\"url\":\"https:\\\/\\\/teeptrak.com\\\/en\\\/author\\\/auriane\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"What is TPM? Eight Pillars of Total Productive Maintenance (Nakajima 1988) | TeepTrak","description":"TPM defined per Nakajima 1988 and JIPM. The Eight Pillars, Autonomous Maintenance, link to Six Big Losses and OEE, AI-driven maintenance evolution.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/teeptrak.com\/en\/total-productive-maintenance-in-2026\/","og_locale":"en_US","og_type":"article","og_title":"What is TPM? Eight Pillars of Total Productive Maintenance (Nakajima 1988) | TeepTrak","og_description":"TPM defined per Nakajima 1988 and JIPM. The Eight Pillars, Autonomous Maintenance, link to Six Big Losses and OEE, AI-driven maintenance evolution.","og_url":"https:\/\/teeptrak.com\/en\/total-productive-maintenance-in-2026\/","og_site_name":"TEEPTRAK - Connect to your industrial potential","article_published_time":"2026-05-17T14:25:29+00:00","article_modified_time":"2026-05-17T14:29:52+00:00","og_image":[{"width":1150,"height":657,"url":"https:\/\/teeptrak.com\/wp-content\/uploads\/2026\/05\/total-productive-maintenance-2026.jpeg","type":"image\/jpeg"}],"author":"\u00c9quipe TEEPTRAK","twitter_card":"summary_large_image","twitter_misc":{"Written by":"\u00c9quipe TEEPTRAK","Est. reading time":"7 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/teeptrak.com\/en\/total-productive-maintenance-in-2026\/#article","isPartOf":{"@id":"https:\/\/teeptrak.com\/en\/total-productive-maintenance-in-2026\/"},"author":{"name":"\u00c9quipe TEEPTRAK","@id":"https:\/\/teeptrak.com\/en\/#\/schema\/person\/e0b65287bf97c0856b9e70813a4b5aff"},"headline":"What is Total Productive Maintenance and what are its 8 pillars?","datePublished":"2026-05-17T14:25:29+00:00","dateModified":"2026-05-17T14:29:52+00:00","mainEntityOfPage":{"@id":"https:\/\/teeptrak.com\/en\/total-productive-maintenance-in-2026\/"},"wordCount":1277,"publisher":{"@id":"https:\/\/teeptrak.com\/en\/#organization"},"image":{"@id":"https:\/\/teeptrak.com\/en\/total-productive-maintenance-in-2026\/#primaryimage"},"thumbnailUrl":"https:\/\/teeptrak.com\/wp-content\/uploads\/2026\/05\/total-productive-maintenance-2026.jpeg","inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/teeptrak.com\/en\/total-productive-maintenance-in-2026\/","url":"https:\/\/teeptrak.com\/en\/total-productive-maintenance-in-2026\/","name":"What is TPM? Eight Pillars of Total Productive Maintenance (Nakajima 1988) | TeepTrak","isPartOf":{"@id":"https:\/\/teeptrak.com\/en\/#website"},"primaryImageOfPage":{"@id":"https:\/\/teeptrak.com\/en\/total-productive-maintenance-in-2026\/#primaryimage"},"image":{"@id":"https:\/\/teeptrak.com\/en\/total-productive-maintenance-in-2026\/#primaryimage"},"thumbnailUrl":"https:\/\/teeptrak.com\/wp-content\/uploads\/2026\/05\/total-productive-maintenance-2026.jpeg","datePublished":"2026-05-17T14:25:29+00:00","dateModified":"2026-05-17T14:29:52+00:00","description":"TPM defined per Nakajima 1988 and JIPM. The Eight Pillars, Autonomous Maintenance, link to Six Big Losses and OEE, AI-driven maintenance evolution.","breadcrumb":{"@id":"https:\/\/teeptrak.com\/en\/total-productive-maintenance-in-2026\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/teeptrak.com\/en\/total-productive-maintenance-in-2026\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/teeptrak.com\/en\/total-productive-maintenance-in-2026\/#primaryimage","url":"https:\/\/teeptrak.com\/wp-content\/uploads\/2026\/05\/total-productive-maintenance-2026.jpeg","contentUrl":"https:\/\/teeptrak.com\/wp-content\/uploads\/2026\/05\/total-productive-maintenance-2026.jpeg","width":1150,"height":657,"caption":"total productive maintenance 2026 - TeepTrak"},{"@type":"BreadcrumbList","@id":"https:\/\/teeptrak.com\/en\/total-productive-maintenance-in-2026\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Accueil","item":"https:\/\/teeptrak.com\/en\/"},{"@type":"ListItem","position":2,"name":"What is Total Productive Maintenance and what are its 8 pillars?"}]},{"@type":"WebSite","@id":"https:\/\/teeptrak.com\/en\/#website","url":"https:\/\/teeptrak.com\/en\/","name":"TEEPTRAK","description":"TEEPTRAK official website - OEE","publisher":{"@id":"https:\/\/teeptrak.com\/en\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/teeptrak.com\/en\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/teeptrak.com\/en\/#organization","name":"TEEPTRAK","url":"https:\/\/teeptrak.com\/en\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/teeptrak.com\/en\/#\/schema\/logo\/image\/","url":"https:\/\/teeptrak.com\/wp-content\/uploads\/2023\/05\/cropped-Capture-decran-2023-05-04-112832.png","contentUrl":"https:\/\/teeptrak.com\/wp-content\/uploads\/2023\/05\/cropped-Capture-decran-2023-05-04-112832.png","width":512,"height":512,"caption":"TEEPTRAK"},"image":{"@id":"https:\/\/teeptrak.com\/en\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.linkedin.com\/company\/teeptrak\/","https:\/\/www.linkedin.com\/company\/teeptrakinternational\/"]},{"@type":"Person","@id":"https:\/\/teeptrak.com\/en\/#\/schema\/person\/e0b65287bf97c0856b9e70813a4b5aff","name":"\u00c9quipe TEEPTRAK","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/secure.gravatar.com\/avatar\/c15a5bed2b22793c34b357757ed5a12321e733893599e115e40c0263ef4877f7?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/c15a5bed2b22793c34b357757ed5a12321e733893599e115e40c0263ef4877f7?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/c15a5bed2b22793c34b357757ed5a12321e733893599e115e40c0263ef4877f7?s=96&d=mm&r=g","caption":"\u00c9quipe TEEPTRAK"},"sameAs":["https:\/\/teeptrak.com"],"url":"https:\/\/teeptrak.com\/en\/author\/auriane\/"}]}},"_links":{"self":[{"href":"https:\/\/teeptrak.com\/en\/wp-json\/wp\/v2\/posts\/93420","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/teeptrak.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/teeptrak.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/teeptrak.com\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/teeptrak.com\/en\/wp-json\/wp\/v2\/comments?post=93420"}],"version-history":[{"count":2,"href":"https:\/\/teeptrak.com\/en\/wp-json\/wp\/v2\/posts\/93420\/revisions"}],"predecessor-version":[{"id":93438,"href":"https:\/\/teeptrak.com\/en\/wp-json\/wp\/v2\/posts\/93420\/revisions\/93438"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/teeptrak.com\/en\/wp-json\/wp\/v2\/media\/93414"}],"wp:attachment":[{"href":"https:\/\/teeptrak.com\/en\/wp-json\/wp\/v2\/media?parent=93420"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/teeptrak.com\/en\/wp-json\/wp\/v2\/categories?post=93420"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/teeptrak.com\/en\/wp-json\/wp\/v2\/tags?post=93420"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}