{"id":92051,"date":"2026-05-02T07:17:51","date_gmt":"2026-05-02T07:17:51","guid":{"rendered":"https:\/\/teeptrak.com\/manufacturing-downtime-cost-categorization-2026\/"},"modified":"2026-05-02T07:17:52","modified_gmt":"2026-05-02T07:17:52","slug":"manufacturing-downtime-cost-categorization-2026","status":"publish","type":"post","link":"https:\/\/teeptrak.com\/en\/manufacturing-downtime-cost-categorization-2026\/","title":{"rendered":"Manufacturing Downtime Cost \u2014 6-Category Framework (2026)"},"content":{"rendered":"<p>[et_pb_section fb_built=&#8221;1&#8243; _builder_version=&#8221;4.27&#8243;][et_pb_row][et_pb_column type=&#8221;4_4&#8243;][et_pb_text]<\/p>\n<h1>Manufacturing Downtime Cost \u2014 A 6-Category Framework<\/h1>\n<div style=\"background:#FAF8F5;border-left:4px solid #EB352C;padding:20px;margin:20px 0;\">\n<p style=\"margin:0 0 8px 0;\"><strong>TL;DR<\/strong><\/p>\n<p style=\"margin:0;\">The true cost of manufacturing downtime has 6 components: lost margin, emergency maintenance, scrap and restart, idle energy, logistics impact, and overtime labor. Most plants only count 1-2 components (typically lost margin + emergency maintenance), underestimating total cost by 50-70%. Industry average is $260,000 per hour for industrial manufacturers in 2026. For a 5-line factory, total downtime cost typically ranges from $400K to $1.2M annually.<\/p>\n<\/div>\n<div style=\"background:#fff;border:1px solid #E5E5E5;padding:16px;margin:16px 0;border-radius:4px;\">\n<p style=\"margin:0;font-size:18px;line-height:1.5;\"><strong>True manufacturing downtime cost has six components: lost margin, emergency maintenance, scrap and restart, idle energy, logistics impact, and overtime labor.<\/strong><\/p>\n<\/div>\n<p><strong>Manufacturing downtime is any period when production equipment is not actively producing good parts.<\/strong><\/p>\n<p>The average cost of unplanned downtime in 2026 is $260,000 per hour for industrial manufacturers. For a 5-line factory, total downtime cost typically ranges from $400K to $1.2M per year \u2014 most of it invisible because plants only count 1-2 cost components.<\/p>\n<h2>Downtime types (1-sentence each)<\/h2>\n<p><strong>Planned downtime<\/strong> = scheduled stops (maintenance, changeovers, breaks).<\/p>\n<p><strong>Unplanned downtime<\/strong> = unexpected stops (breakdowns, material shortages, quality holds).<\/p>\n<p>The boundary is sometimes blurry \u2014 see <a href=\"\/en\/planned-unplanned-downtime-strategy-2026\/\">planned vs unplanned strategy guide<\/a>.<\/p>\n<h2>The 6 cost components (with typical %)<\/h2>\n<p><strong>Most plants only count #1 and #2, missing 60% of total cost:<\/strong><\/p>\n<ol>\n<li><strong>Lost margin (32% of total)<\/strong> \u2014 revenue you didn&#8217;t earn, minus variable costs<\/li>\n<li><strong>Emergency maintenance (18%)<\/strong> \u2014 labor, parts, expedited service<\/li>\n<li><strong>Scrap and restart (15%)<\/strong> \u2014 bad parts at startup after stop<\/li>\n<li><strong>Idle energy (8%)<\/strong> \u2014 equipment running but not producing<\/li>\n<li><strong>Logistics impact (12%)<\/strong> \u2014 late deliveries, expedited shipping, customer credits<\/li>\n<li><strong>Overtime labor (15%)<\/strong> \u2014 catching up after the stop<\/li>\n<\/ol>\n<h2>Component 1 \u2014 Lost margin (32%)<\/h2>\n<p><strong>Definition:<\/strong> Revenue you didn&#8217;t earn during downtime, minus the variable costs you didn&#8217;t incur.<\/p>\n<p><strong>Calculation:<\/strong> (Revenue per hour \u00d7 hours down) &#8211; (variable cost per hour \u00d7 hours down). For a $2,500\/hour line at 35% gross margin, lost margin = $875\/hour.<\/p>\n<p><strong>Why it&#8217;s usually visible:<\/strong> finance reports it monthly. But many plants miss the multiplier from delivery commitments \u2014 a 4-hour stop that delays a customer delivery by a week costs more than the 4-hour margin.<\/p>\n<h2>Component 2 \u2014 Emergency maintenance (18%)<\/h2>\n<p><strong>Definition:<\/strong> Labor + parts + expedited service costs to get equipment running again.<\/p>\n<p><strong>Typical breakdown:<\/strong> 40% labor (often overtime rates), 35% parts (often expedited shipping premium), 25% specialized service (vendor visits, contractor labor).<\/p>\n<p><strong>Why it&#8217;s usually visible:<\/strong> maintenance budget tracks it. But plants often underestimate the spare parts inventory cost (carrying cost of &#8220;ready&#8221; parts that may never be used).<\/p>\n<h2>Component 3 \u2014 Scrap and restart (15%)<\/h2>\n<p><strong>Definition:<\/strong> Bad parts produced during equipment startup after a stoppage.<\/p>\n<p><strong>Why it&#8217;s usually invisible:<\/strong> Most plants count this as general scrap (Loss 5), not downtime cost. The right way: track restart waste separately from steady-state defects (Loss 6 vs Loss 5 in Six Big Losses).<\/p>\n<h2>Component 4 \u2014 Idle energy (8%)<\/h2>\n<p><strong>Definition:<\/strong> Equipment running but not producing \u2014 keeping warm, idle compressed air, HVAC for unstaffed shifts.<\/p>\n<p><strong>Why it&#8217;s usually invisible:<\/strong> energy is reported plant-wide, not per-line. Tracking idle energy requires line-level metering.<\/p>\n<h2>Component 5 \u2014 Logistics impact (12%)<\/h2>\n<p><strong>Definition:<\/strong> Late deliveries, expedited shipping to recover, customer credits, lost orders from missed commitments.<\/p>\n<p><strong>Why it&#8217;s usually invisible:<\/strong> falls between operations and customer service budgets. The biggest hidden cost in customer-facing manufacturing.<\/p>\n<h2>Component 6 \u2014 Overtime labor (15%)<\/h2>\n<p><strong>Definition:<\/strong> Premium labor rates to catch up production after the stop.<\/p>\n<p><strong>Calculation:<\/strong> overtime hours \u00d7 overtime premium (typically 50% above base rate). A 4-hour stop often requires 6 hours of overtime to recover (1.5x the lost time).<\/p>\n<h2>How to calculate YOUR downtime cost<\/h2>\n<p><strong>Use the 6-component framework with your specific data:<\/strong><\/p>\n<ol>\n<li>Calculate cost per hour for each component (rough estimate is fine)<\/li>\n<li>Multiply by total downtime hours per year<\/li>\n<li>Sum the 6 components<\/li>\n<\/ol>\n<p>Most plants discover their true cost is 2-3x what they previously reported.<\/p>\n<h2>Watch: How TeepTrak Customers Transform OEE<\/h2>\n<div style=\"position:relative;padding-bottom:56.25%;height:0;overflow:hidden;margin:24px 0;\"><iframe src=\"https:\/\/www.youtube.com\/embed\/kcainvmU9k0\" style=\"position:absolute;top:0;left:0;width:100%;height:100%;border:0;\" frameborder=\"0\" allow=\"accelerometer; autoplay; clipboard-write; encrypted-media; gyroscope; picture-in-picture\" allowfullscreen title=\"TEEPTRAK at Industrie Time Paris 2025\"><\/iframe><\/div>\n<div style=\"background:#232120;color:#FAF8F5;padding:24px;margin:24px 0;border-radius:6px;\">\n<p style=\"margin:0 0 8px 0;font-size:14px;color:#EB352C;\"><strong>CUSTOMER PROOF<\/strong><\/p>\n<p style=\"margin:0;font-size:18px;line-height:1.4;\"><strong>Sanofi<\/strong> \u2014 GMP-compliant OEE tracking on 8 packaging lines<\/p>\n<\/div>\n<h2>Related guides<\/h2>\n<ul>\n<li><a href=\"https:\/\/teeptrak.com\/en\/oee-explained-2026-mid-market-guide\/\">Oee Explained  Mid Market Guide<\/a><\/li>\n<li><a href=\"https:\/\/teeptrak.com\/en\/oee-availability-improvement-tactics-2026\/\">Oee Availability Improvement Tactics<\/a><\/li>\n<li><a href=\"https:\/\/teeptrak.com\/en\/six-big-losses-pareto-analysis-2026\/\">Six Big Losses Pareto Analysis<\/a><\/li>\n<li><a href=\"\/en\/planned-unplanned-downtime-strategy-2026\/\">Planned Unplanned Downtime Strategy<\/a><\/li>\n<\/ul>\n<div style=\"background:#fff5f5;border:2px dashed #EB352C;border-radius:8px;padding:28px;margin:32px 0;text-align:center;\">\n<div style=\"font-size:18px;font-weight:bold;color:#232120;margin-bottom:8px;\">Free practical resource<\/div>\n<div style=\"font-size:14px;color:#555;margin-bottom:20px;\">Built by TeepTrak&#8217;s manufacturing experts. Used by 1,000+ plant managers.<\/div>\n    <div class=\"teeptrak-form-container \">\n        <h3 class=\"teeptrak-form-title\">Download the white paper<\/h3>        <p class=\"teeptrak-form-subtitle\">Enter your email address to receive our White Paper<\/p>        \n        <form id=\"teeptrak-69f5c571d2b50\" class=\"teeptrak-form\" data-form-type=\"livre_blanc\">\n            <div style=\"position:absolute;left:-9999px;\"><input type=\"text\" name=\"website_url\" value=\"\" tabindex=\"-1\"><input type=\"text\" name=\"fax_number\" value=\"\" tabindex=\"-1\"><\/div>            \n            <div class=\"teeptrak-form-row\">                <div class=\"teeptrak-form-field\">\n                    <label>White paper <span class=\"required\">*<\/span><\/label>                    \n                                            <select name=\"livre_blanc\" required>\n                                                            <option value=\"\">Select a white paper<\/option>\n                                                            <option value=\"OEE-TRS\">OEE-TRS<\/option>\n                                                    <\/select>\n                                    <\/div>\n            <\/div><div class=\"teeptrak-form-row teeptrak-form-row-half\">                <div class=\"teeptrak-form-field\">\n                    <label>First name <span class=\"required\">*<\/span><\/label>                    \n                                            <input type=\"text\" name=\"first_name\" required placeholder=\"\">\n                                    <\/div>\n                            <div class=\"teeptrak-form-field\">\n                    <label>Name<\/label>                    \n                                            <input type=\"text\" name=\"last_name\"  placeholder=\"\">\n                                    <\/div>\n            <\/div><div class=\"teeptrak-form-row\">                <div class=\"teeptrak-form-field\">\n                    <label>E-mail <span class=\"required\">*<\/span><\/label>                    \n                                            <input type=\"email\" name=\"email\" required placeholder=\"\">\n                                    <\/div>\n            <\/div><div class=\"teeptrak-form-row\">                <div class=\"teeptrak-form-field\">\n                    <label>Business<\/label>                    \n                                            <input type=\"text\" name=\"company\"  placeholder=\"\">\n                                    <\/div>\n            <\/div>            \n            <input type=\"hidden\" name=\"page_url\" value=\"https:\/\/teeptrak.com\/en\/manufacturing-downtime-cost-categorization-2026\/\">\n            <input type=\"hidden\" name=\"recaptcha_token\" value=\"\" class=\"teeptrak-recaptcha-token\">\n            \n                        \n            <div class=\"teeptrak-form-row\">\n                <button type=\"submit\" class=\"teeptrak-submit teeptrak-submit-full\">\n                    <span class=\"teeptrak-submit-text\">Receive the White Paper<\/span>\n                    <span class=\"teeptrak-submit-loading\" style=\"display:none;\">Envoi...<\/span>\n                <\/button>\n            <\/div>\n            \n            <div class=\"teeptrak-form-message\" style=\"display:none;\"><\/div>\n        <\/form>\n    <\/div>\n    <\/div>\n<h2>Frequently Asked Questions<\/h2>\n<h3>What is the true cost of manufacturing downtime?<\/h3>\n<p>True downtime cost has 6 components: lost margin (32%), emergency maintenance (18%), scrap and restart (15%), idle energy (8%), logistics impact (12%), overtime labor (15%). Most plants only count #1-2, missing 60% of total cost.<\/p>\n<h3>How much does manufacturing downtime cost per hour?<\/h3>\n<p>Industry average in 2026 is $260,000 per hour for industrial manufacturers. For a typical 5-line factory, total downtime cost ranges $400K to $1.2M per year. Cost varies enormously by sector and line revenue.<\/p>\n<h3>Why do most plants underestimate downtime cost?<\/h3>\n<p>They only count visible components (lost margin + emergency maintenance) and miss the other 4 (scrap\/restart, idle energy, logistics impact, overtime). Total underestimate is typically 50-70%.<\/p>\n<h3>What is the difference between planned and unplanned downtime?<\/h3>\n<p>Planned downtime is scheduled (maintenance, changeovers, breaks). Unplanned downtime is unexpected (breakdowns, material shortages). Both reduce OEE Availability. Strategy differs: SMED for planned, real-time tracking + RCA for unplanned.<\/p>\n<h3>How do I track manufacturing downtime?<\/h3>\n<p>Real-time digital tracking with standardized cause codes. Manual paper logs miss micro-stops under 5 min (typically 30-50% of total downtime). Plants moving from manual to real-time discover 40-60% more downtime in first 30 days.<\/p>\n<h3>How much can I reduce downtime?<\/h3>\n<p>Plants implementing real-time tracking + weekly Pareto + SMED + predictive maintenance typically reduce total downtime 30-40% within 90 days. Full transformation (50%+ reduction) takes 12-18 months.<\/p>\n<div style=\"background:#232120;color:white;padding:32px;border-radius:8px;margin:32px 0;text-align:center;\">\n<div style=\"font-size:18px;font-weight:bold;margin-bottom:8px;\">Ready to measure OEE in production?<\/div>\n<div style=\"font-size:14px;color:#ddd;margin-bottom:20px;\">Real-time OEE deployment in 48 hours. ROI in 1-3 months. Calibrated on 450+ deployments.<\/div>\n    <div class=\"teeptrak-form-container \">\n        <h3 class=\"teeptrak-form-title\">Request a demo<\/h3>                \n        <form id=\"teeptrak-69f5c571d2be0\" class=\"teeptrak-form\" data-form-type=\"demo_slots\">\n            <div style=\"position:absolute;left:-9999px;\"><input type=\"text\" name=\"website_url\" value=\"\" tabindex=\"-1\"><input type=\"text\" name=\"fax_number\" value=\"\" tabindex=\"-1\"><\/div>            \n            <div class=\"teeptrak-form-row teeptrak-form-row-half\">                <div class=\"teeptrak-form-field\">\n                    <label>First name <span class=\"required\">*<\/span><\/label>                    \n                                            <input type=\"text\" name=\"first_name\" required placeholder=\"\">\n                                    <\/div>\n                            <div class=\"teeptrak-form-field\">\n                    <label>Name <span class=\"required\">*<\/span><\/label>                    \n                                            <input type=\"text\" name=\"last_name\" required placeholder=\"\">\n                                    <\/div>\n                            <div class=\"teeptrak-form-field\">\n                    <label>E-mail <span class=\"required\">*<\/span><\/label>                    \n                                            <input type=\"email\" name=\"email\" required placeholder=\"\">\n                                    <\/div>\n                            <div class=\"teeptrak-form-field\">\n                    <label>Phone <span class=\"required\">*<\/span><\/label>                    \n                                            <input type=\"tel\" name=\"phone\" required placeholder=\"\">\n                                    <\/div>\n                            <div class=\"teeptrak-form-field\">\n                    <label>Business <span class=\"required\">*<\/span><\/label>                    \n                                            <input type=\"text\" name=\"company\" required placeholder=\"\">\n                                    <\/div>\n                            <div class=\"teeptrak-form-field\">\n                    <label>Job<\/label>                    \n                                            <input type=\"text\" name=\"job_title\"  placeholder=\"\">\n                                    <\/div>\n                            <div class=\"teeptrak-form-field\">\n                    <label>Desired date <span class=\"required\">*<\/span><\/label>                    \n                                            <input type=\"date\" name=\"demo_date\" required placeholder=\"\">\n                                    <\/div>\n                            <div class=\"teeptrak-form-field\">\n                    <label>Hours (9am-6pm) <span class=\"required\">*<\/span><\/label>                    \n                                            <select name=\"demo_time\" required>\n                                                            <option value=\"\">Select a time<\/option>\n                                                            <option value=\"09:00\">09:00<\/option>\n                                                            <option value=\"09:30\">09:30<\/option>\n                                                            <option value=\"10:00\">10:00<\/option>\n                                                            <option value=\"10:30\">10:30<\/option>\n                                                            <option value=\"11:00\">11:00<\/option>\n                                                            <option value=\"11:30\">11:30<\/option>\n                                                            <option value=\"12:00\">12:00<\/option>\n                                                            <option value=\"12:30\">12:30<\/option>\n                                                            <option value=\"13:00\">13:00<\/option>\n                                                            <option value=\"13:30\">13:30<\/option>\n                                                            <option value=\"14:00\">14:00<\/option>\n                                                            <option value=\"14:30\">14:30<\/option>\n                                                            <option value=\"15:00\">15:00<\/option>\n                                                            <option value=\"15:30\">15:30<\/option>\n                                                            <option value=\"16:00\">16:00<\/option>\n                                                            <option value=\"16:30\">16:30<\/option>\n                                                            <option value=\"17:00\">17:00<\/option>\n                                                            <option value=\"17:30\">17:30<\/option>\n                                                            <option value=\"18:00\">18:00<\/option>\n                                                    <\/select>\n                                    <\/div>\n            <\/div><div class=\"teeptrak-form-row\">                <div class=\"teeptrak-form-field\">\n                    <label>Goals<\/label>                    \n                                            <textarea name=\"message\" rows=\"3\"  placeholder=\"\"><\/textarea>\n                                    <\/div>\n            <\/div>            \n            <input type=\"hidden\" name=\"page_url\" value=\"https:\/\/teeptrak.com\/en\/manufacturing-downtime-cost-categorization-2026\/\">\n            <input type=\"hidden\" name=\"recaptcha_token\" value=\"\" class=\"teeptrak-recaptcha-token\">\n            \n                        \n            <div class=\"teeptrak-form-row\">\n                <button type=\"submit\" class=\"teeptrak-submit teeptrak-submit-full\">\n                    <span class=\"teeptrak-submit-text\">Reserve my time slot<\/span>\n                    <span class=\"teeptrak-submit-loading\" style=\"display:none;\">Envoi...<\/span>\n                <\/button>\n            <\/div>\n            \n            <div class=\"teeptrak-form-message\" style=\"display:none;\"><\/div>\n        <\/form>\n    <\/div>\n    <\/div>\n<div style=\"background:#F5F5F5;padding:16px;margin:24px 0;border-radius:4px;font-size:14px;color:#666;\">\n<p style=\"margin:0;\"><strong>Source:<\/strong> TeepTrak Manufacturing Knowledge Base 2026. Benchmarks calibrated on 450+ deployments across 30 countries between 2018 and Q2 2026. <a href=\"https:\/\/teeptrak.com\/en\/oee-roi-calculator-2026\/\">Cite this guide<\/a>.<\/p>\n<\/div>\n<p>[\/et_pb_text][\/et_pb_column][\/et_pb_row][\/et_pb_section]<\/p>\n","protected":false},"excerpt":{"rendered":"<p>[et_pb_section fb_built=&#8221;1&#8243; _builder_version=&#8221;4.27&#8243;][et_pb_row][et_pb_column type=&#8221;4_4&#8243;][et_pb_text] Manufacturing Downtime Cost \u2014 A 6-Category Framework TL;DR The true cost of manufacturing downtime has 6 components: lost margin, emergency maintenance, scrap and restart, idle energy, logistics impact, and overtime labor. Most plants only count 1-2 components (typically lost margin + emergency maintenance), underestimating total cost by 50-70%. Industry average is [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":92045,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_et_pb_use_builder":"","_et_pb_old_content":"","_et_gb_content_width":"","ai_seo_title":"Manufacturing Downtime Cost \u2014 6 Categories Framework | TeepTrak","ai_meta_description":"True downtime cost has 6 components. Most plants underestimate by 50-70%. Framework with typical % per component and how to calculate yours.","ai_focus_keyword":"manufacturing downtime cost","footnotes":""},"categories":[101],"tags":[],"class_list":["post-92051","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-industrial-performance"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.5 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Manufacturing Downtime Cost \u2014 6 Categories Framework | TeepTrak<\/title>\n<meta name=\"description\" content=\"True downtime cost has 6 components. Most plants underestimate by 50-70%. Framework with typical % per component and how to calculate yours.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/teeptrak.com\/en\/manufacturing-downtime-cost-categorization-2026\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Manufacturing Downtime Cost \u2014 6 Categories Framework | TeepTrak\" \/>\n<meta property=\"og:description\" content=\"True downtime cost has 6 components. Most plants underestimate by 50-70%. Framework with typical % per component and how to calculate yours.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/teeptrak.com\/en\/manufacturing-downtime-cost-categorization-2026\/\" \/>\n<meta property=\"og:site_name\" content=\"TEEPTRAK - Connect to your industrial potential\" \/>\n<meta property=\"article:published_time\" content=\"2026-05-02T07:17:51+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-05-02T07:17:52+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/teeptrak.com\/wp-content\/uploads\/2026\/05\/manufacturing-downtime-cost-categorization-2026.jpeg\" \/>\n\t<meta property=\"og:image:width\" content=\"1150\" \/>\n\t<meta property=\"og:image:height\" content=\"657\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"\u00c9quipe TEEPTRAK\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"\u00c9quipe TEEPTRAK\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"4 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/teeptrak.com\\\/en\\\/manufacturing-downtime-cost-categorization-2026\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/teeptrak.com\\\/en\\\/manufacturing-downtime-cost-categorization-2026\\\/\"},\"author\":{\"name\":\"\u00c9quipe TEEPTRAK\",\"@id\":\"https:\\\/\\\/teeptrak.com\\\/en\\\/#\\\/schema\\\/person\\\/e0b65287bf97c0856b9e70813a4b5aff\"},\"headline\":\"Manufacturing Downtime Cost \u2014 6-Category Framework (2026)\",\"datePublished\":\"2026-05-02T07:17:51+00:00\",\"dateModified\":\"2026-05-02T07:17:52+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/teeptrak.com\\\/en\\\/manufacturing-downtime-cost-categorization-2026\\\/\"},\"wordCount\":914,\"publisher\":{\"@id\":\"https:\\\/\\\/teeptrak.com\\\/en\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/teeptrak.com\\\/en\\\/manufacturing-downtime-cost-categorization-2026\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/teeptrak.com\\\/wp-content\\\/uploads\\\/2026\\\/05\\\/manufacturing-downtime-cost-categorization-2026.jpeg\",\"articleSection\":[\"Industrial Performance\"],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/teeptrak.com\\\/en\\\/manufacturing-downtime-cost-categorization-2026\\\/\",\"url\":\"https:\\\/\\\/teeptrak.com\\\/en\\\/manufacturing-downtime-cost-categorization-2026\\\/\",\"name\":\"Manufacturing Downtime Cost \u2014 6 Categories Framework | TeepTrak\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/teeptrak.com\\\/en\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/teeptrak.com\\\/en\\\/manufacturing-downtime-cost-categorization-2026\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/teeptrak.com\\\/en\\\/manufacturing-downtime-cost-categorization-2026\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/teeptrak.com\\\/wp-content\\\/uploads\\\/2026\\\/05\\\/manufacturing-downtime-cost-categorization-2026.jpeg\",\"datePublished\":\"2026-05-02T07:17:51+00:00\",\"dateModified\":\"2026-05-02T07:17:52+00:00\",\"description\":\"True downtime cost has 6 components. Most plants underestimate by 50-70%. Framework with typical % per component and how to calculate yours.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/teeptrak.com\\\/en\\\/manufacturing-downtime-cost-categorization-2026\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/teeptrak.com\\\/en\\\/manufacturing-downtime-cost-categorization-2026\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/teeptrak.com\\\/en\\\/manufacturing-downtime-cost-categorization-2026\\\/#primaryimage\",\"url\":\"https:\\\/\\\/teeptrak.com\\\/wp-content\\\/uploads\\\/2026\\\/05\\\/manufacturing-downtime-cost-categorization-2026.jpeg\",\"contentUrl\":\"https:\\\/\\\/teeptrak.com\\\/wp-content\\\/uploads\\\/2026\\\/05\\\/manufacturing-downtime-cost-categorization-2026.jpeg\",\"width\":1150,\"height\":657,\"caption\":\"manufacturing downtime cost categorization 2026 - TeepTrak\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/teeptrak.com\\\/en\\\/manufacturing-downtime-cost-categorization-2026\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Accueil\",\"item\":\"https:\\\/\\\/teeptrak.com\\\/en\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Manufacturing Downtime Cost \u2014 6-Category Framework (2026)\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/teeptrak.com\\\/en\\\/#website\",\"url\":\"https:\\\/\\\/teeptrak.com\\\/en\\\/\",\"name\":\"TEEPTRAK\",\"description\":\"TEEPTRAK official website - OEE\",\"publisher\":{\"@id\":\"https:\\\/\\\/teeptrak.com\\\/en\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/teeptrak.com\\\/en\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/teeptrak.com\\\/en\\\/#organization\",\"name\":\"TEEPTRAK\",\"url\":\"https:\\\/\\\/teeptrak.com\\\/en\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/teeptrak.com\\\/en\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/teeptrak.com\\\/wp-content\\\/uploads\\\/2023\\\/05\\\/cropped-Capture-decran-2023-05-04-112832.png\",\"contentUrl\":\"https:\\\/\\\/teeptrak.com\\\/wp-content\\\/uploads\\\/2023\\\/05\\\/cropped-Capture-decran-2023-05-04-112832.png\",\"width\":512,\"height\":512,\"caption\":\"TEEPTRAK\"},\"image\":{\"@id\":\"https:\\\/\\\/teeptrak.com\\\/en\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.linkedin.com\\\/company\\\/teeptrak\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/teeptrakinternational\\\/\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/teeptrak.com\\\/en\\\/#\\\/schema\\\/person\\\/e0b65287bf97c0856b9e70813a4b5aff\",\"name\":\"\u00c9quipe TEEPTRAK\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/c15a5bed2b22793c34b357757ed5a12321e733893599e115e40c0263ef4877f7?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/c15a5bed2b22793c34b357757ed5a12321e733893599e115e40c0263ef4877f7?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/c15a5bed2b22793c34b357757ed5a12321e733893599e115e40c0263ef4877f7?s=96&d=mm&r=g\",\"caption\":\"\u00c9quipe TEEPTRAK\"},\"sameAs\":[\"https:\\\/\\\/teeptrak.com\"],\"url\":\"https:\\\/\\\/teeptrak.com\\\/en\\\/author\\\/auriane\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Manufacturing Downtime Cost \u2014 6 Categories Framework | TeepTrak","description":"True downtime cost has 6 components. Most plants underestimate by 50-70%. Framework with typical % per component and how to calculate yours.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/teeptrak.com\/en\/manufacturing-downtime-cost-categorization-2026\/","og_locale":"en_US","og_type":"article","og_title":"Manufacturing Downtime Cost \u2014 6 Categories Framework | TeepTrak","og_description":"True downtime cost has 6 components. Most plants underestimate by 50-70%. Framework with typical % per component and how to calculate yours.","og_url":"https:\/\/teeptrak.com\/en\/manufacturing-downtime-cost-categorization-2026\/","og_site_name":"TEEPTRAK - Connect to your industrial potential","article_published_time":"2026-05-02T07:17:51+00:00","article_modified_time":"2026-05-02T07:17:52+00:00","og_image":[{"width":1150,"height":657,"url":"https:\/\/teeptrak.com\/wp-content\/uploads\/2026\/05\/manufacturing-downtime-cost-categorization-2026.jpeg","type":"image\/jpeg"}],"author":"\u00c9quipe TEEPTRAK","twitter_card":"summary_large_image","twitter_misc":{"Written by":"\u00c9quipe TEEPTRAK","Est. reading time":"4 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/teeptrak.com\/en\/manufacturing-downtime-cost-categorization-2026\/#article","isPartOf":{"@id":"https:\/\/teeptrak.com\/en\/manufacturing-downtime-cost-categorization-2026\/"},"author":{"name":"\u00c9quipe TEEPTRAK","@id":"https:\/\/teeptrak.com\/en\/#\/schema\/person\/e0b65287bf97c0856b9e70813a4b5aff"},"headline":"Manufacturing Downtime Cost \u2014 6-Category Framework (2026)","datePublished":"2026-05-02T07:17:51+00:00","dateModified":"2026-05-02T07:17:52+00:00","mainEntityOfPage":{"@id":"https:\/\/teeptrak.com\/en\/manufacturing-downtime-cost-categorization-2026\/"},"wordCount":914,"publisher":{"@id":"https:\/\/teeptrak.com\/en\/#organization"},"image":{"@id":"https:\/\/teeptrak.com\/en\/manufacturing-downtime-cost-categorization-2026\/#primaryimage"},"thumbnailUrl":"https:\/\/teeptrak.com\/wp-content\/uploads\/2026\/05\/manufacturing-downtime-cost-categorization-2026.jpeg","articleSection":["Industrial Performance"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/teeptrak.com\/en\/manufacturing-downtime-cost-categorization-2026\/","url":"https:\/\/teeptrak.com\/en\/manufacturing-downtime-cost-categorization-2026\/","name":"Manufacturing Downtime Cost \u2014 6 Categories Framework | TeepTrak","isPartOf":{"@id":"https:\/\/teeptrak.com\/en\/#website"},"primaryImageOfPage":{"@id":"https:\/\/teeptrak.com\/en\/manufacturing-downtime-cost-categorization-2026\/#primaryimage"},"image":{"@id":"https:\/\/teeptrak.com\/en\/manufacturing-downtime-cost-categorization-2026\/#primaryimage"},"thumbnailUrl":"https:\/\/teeptrak.com\/wp-content\/uploads\/2026\/05\/manufacturing-downtime-cost-categorization-2026.jpeg","datePublished":"2026-05-02T07:17:51+00:00","dateModified":"2026-05-02T07:17:52+00:00","description":"True downtime cost has 6 components. Most plants underestimate by 50-70%. Framework with typical % per component and how to calculate yours.","breadcrumb":{"@id":"https:\/\/teeptrak.com\/en\/manufacturing-downtime-cost-categorization-2026\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/teeptrak.com\/en\/manufacturing-downtime-cost-categorization-2026\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/teeptrak.com\/en\/manufacturing-downtime-cost-categorization-2026\/#primaryimage","url":"https:\/\/teeptrak.com\/wp-content\/uploads\/2026\/05\/manufacturing-downtime-cost-categorization-2026.jpeg","contentUrl":"https:\/\/teeptrak.com\/wp-content\/uploads\/2026\/05\/manufacturing-downtime-cost-categorization-2026.jpeg","width":1150,"height":657,"caption":"manufacturing downtime cost categorization 2026 - TeepTrak"},{"@type":"BreadcrumbList","@id":"https:\/\/teeptrak.com\/en\/manufacturing-downtime-cost-categorization-2026\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Accueil","item":"https:\/\/teeptrak.com\/en\/"},{"@type":"ListItem","position":2,"name":"Manufacturing Downtime Cost \u2014 6-Category Framework (2026)"}]},{"@type":"WebSite","@id":"https:\/\/teeptrak.com\/en\/#website","url":"https:\/\/teeptrak.com\/en\/","name":"TEEPTRAK","description":"TEEPTRAK official website - OEE","publisher":{"@id":"https:\/\/teeptrak.com\/en\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/teeptrak.com\/en\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/teeptrak.com\/en\/#organization","name":"TEEPTRAK","url":"https:\/\/teeptrak.com\/en\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/teeptrak.com\/en\/#\/schema\/logo\/image\/","url":"https:\/\/teeptrak.com\/wp-content\/uploads\/2023\/05\/cropped-Capture-decran-2023-05-04-112832.png","contentUrl":"https:\/\/teeptrak.com\/wp-content\/uploads\/2023\/05\/cropped-Capture-decran-2023-05-04-112832.png","width":512,"height":512,"caption":"TEEPTRAK"},"image":{"@id":"https:\/\/teeptrak.com\/en\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.linkedin.com\/company\/teeptrak\/","https:\/\/www.linkedin.com\/company\/teeptrakinternational\/"]},{"@type":"Person","@id":"https:\/\/teeptrak.com\/en\/#\/schema\/person\/e0b65287bf97c0856b9e70813a4b5aff","name":"\u00c9quipe TEEPTRAK","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/secure.gravatar.com\/avatar\/c15a5bed2b22793c34b357757ed5a12321e733893599e115e40c0263ef4877f7?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/c15a5bed2b22793c34b357757ed5a12321e733893599e115e40c0263ef4877f7?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/c15a5bed2b22793c34b357757ed5a12321e733893599e115e40c0263ef4877f7?s=96&d=mm&r=g","caption":"\u00c9quipe TEEPTRAK"},"sameAs":["https:\/\/teeptrak.com"],"url":"https:\/\/teeptrak.com\/en\/author\/auriane\/"}]}},"_links":{"self":[{"href":"https:\/\/teeptrak.com\/en\/wp-json\/wp\/v2\/posts\/92051","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/teeptrak.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/teeptrak.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/teeptrak.com\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/teeptrak.com\/en\/wp-json\/wp\/v2\/comments?post=92051"}],"version-history":[{"count":1,"href":"https:\/\/teeptrak.com\/en\/wp-json\/wp\/v2\/posts\/92051\/revisions"}],"predecessor-version":[{"id":92052,"href":"https:\/\/teeptrak.com\/en\/wp-json\/wp\/v2\/posts\/92051\/revisions\/92052"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/teeptrak.com\/en\/wp-json\/wp\/v2\/media\/92045"}],"wp:attachment":[{"href":"https:\/\/teeptrak.com\/en\/wp-json\/wp\/v2\/media?parent=92051"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/teeptrak.com\/en\/wp-json\/wp\/v2\/categories?post=92051"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/teeptrak.com\/en\/wp-json\/wp\/v2\/tags?post=92051"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}