{"id":92026,"date":"2026-05-02T07:14:47","date_gmt":"2026-05-02T07:14:47","guid":{"rendered":"https:\/\/teeptrak.com\/oee-quality-fpy-tracking-methodology-2026\/"},"modified":"2026-05-02T07:14:48","modified_gmt":"2026-05-02T07:14:48","slug":"oee-quality-fpy-tracking-methodology-2026","status":"publish","type":"post","link":"https:\/\/teeptrak.com\/en\/oee-quality-fpy-tracking-methodology-2026\/","title":{"rendered":"OEE Quality \u2014 FPY Tracking Methodology (2026)"},"content":{"rendered":"<p>[et_pb_section fb_built=&#8221;1&#8243; _builder_version=&#8221;4.27&#8243;][et_pb_row][et_pb_column type=&#8221;4_4&#8243;][et_pb_text]<\/p>\n<h1>OEE Quality \u2014 FPY Tracking Methodology for Manufacturers<\/h1>\n<div style=\"background:#FAF8F5;border-left:4px solid #EB352C;padding:20px;margin:20px 0;\">\n<p style=\"margin:0 0 8px 0;\"><strong>TL;DR<\/strong><\/p>\n<p style=\"margin:0;\">Quality is the third OEE pillar, measuring the ratio of good parts to total parts produced. It is closely related to First Pass Yield (FPY) but measured at line level vs station level. The 4-level FPY tracking maturity ladder progresses from end-of-month aggregate to real-time per-station defect tagging. Plants implementing structured Quality tracking typically gain +2 to +4 Quality points within 90 days.<\/p>\n<\/div>\n<div style=\"background:#fff;border:1px solid #E5E5E5;padding:16px;margin:16px 0;border-radius:4px;\">\n<p style=\"margin:0;font-size:18px;line-height:1.5;\"><strong>Quality is the third OEE pillar, calculated as Good Count divided by Total Count, expressed as a percentage between 0% and 100%.<\/strong><\/p>\n<\/div>\n<p><strong>Quality is the third OEE pillar, measuring the ratio of good parts to total parts produced.<\/strong><\/p>\n<p>Quality tracking is the most operationally rewarding of the three pillars: gains compound through customer retention, audit performance, and rework labor savings. Yet most plants track Quality at the wrong granularity (line-level monthly aggregate) for improvement work.<\/p>\n<h2>Quality definition (1-sentence)<\/h2>\n<p><strong>Quality = Good Count \u00f7 Total Count, expressed as a percentage.<\/strong><\/p>\n<p>Critical: <strong>&#8220;Good Count&#8221; excludes scrap, rework, AND downgrades<\/strong>. A part that needs rework is NOT good \u2014 it failed first-pass inspection.<\/p>\n<h2>Quality vs First Pass Yield (FPY)<\/h2>\n<p><strong>OEE Quality and FPY are nearly identical with subtle differences:<\/strong><\/p>\n<ul>\n<li><strong>OEE Quality<\/strong> typically counts at end of line. Reported at line level.<\/li>\n<li><strong>FPY<\/strong> counts at each individual station. A 5-station line with 99% FPY at each station has overall FPY of 0.99\u2075 = 95.1%.<\/li>\n<\/ul>\n<p>OEE Quality is what you report. FPY is what you analyze to find which station is the bottleneck. See <a href=\"\/en\/first-pass-yield-rty-multi-station-2026\/\">FPY\/RTY multi-station guide<\/a>.<\/p>\n<h2>Typical Quality benchmarks (2026)<\/h2>\n<ul>\n<li><strong>Automotive OEM:<\/strong> median 94%, world-class 98%<\/li>\n<li><strong>Food &amp; beverage:<\/strong> median 94%, world-class 97%<\/li>\n<li><strong>Pharma biologics:<\/strong> median 97%, world-class 99% (highest, GMP-driven)<\/li>\n<li><strong>Plastics extrusion:<\/strong> median 92%, world-class 96%<\/li>\n<li><strong>Aerospace composites:<\/strong> median 94%, world-class 97%<\/li>\n<\/ul>\n<h2>Categorizing Quality losses (4 categories)<\/h2>\n<p><strong>Effective Quality tracking requires categorization. Standard categories:<\/strong><\/p>\n<ul>\n<li><strong>Process defects (Loss 5):<\/strong> bad parts during steady-state operation. Causes: drift, equipment wear, material variability.<\/li>\n<li><strong>Startup losses (Loss 6):<\/strong> bad parts during equipment startup or after changeovers. Causes: warm-up time, parameter dial-in.<\/li>\n<li><strong>Rework:<\/strong> parts that pass inspection only after additional processing. Counted as Quality loss.<\/li>\n<li><strong>Restart waste:<\/strong> parts produced immediately after a stoppage. Often miscategorized as scrap; should be tracked separately.<\/li>\n<\/ul>\n<p>Real-time defect tagging with these categories is the foundation of structured improvement.<\/p>\n<h2>4-level FPY tracking maturity ladder<\/h2>\n<p><strong>Most plants are at Level 1-2; world-class plants operate at Level 4.<\/strong><\/p>\n<ol>\n<li><strong>Level 1 (Beginner):<\/strong> Aggregate FPY at end of line, calculated monthly. Useful for trend tracking; too late for corrective action.<\/li>\n<li><strong>Level 2 (Intermediate):<\/strong> FPY tracked daily at end of line, with categories. Pareto possible but no station-level diagnosis.<\/li>\n<li><strong>Level 3 (Advanced):<\/strong> Real-time FPY per station with defect tagging. Enables station-level RTY analysis.<\/li>\n<li><strong>Level 4 (World-class):<\/strong> Real-time FPY + automated defect classification + closed-loop improvement to RCA action items.<\/li>\n<\/ol>\n<h2>5 tactics to improve Quality (ranked)<\/h2>\n<ol>\n<li><strong>Real-time defect tagging<\/strong> with category as defect occurs. End-of-month aggregation hides patterns.<\/li>\n<li><strong>Mandatory RCA on top 3 defect classes<\/strong> \u2014 5-Why or Ishikawa, action items tracked to closure. Plants typically reduce defects 50-70% within 12 months.<\/li>\n<li><strong>Restart waste isolation<\/strong> \u2014 separate from steady-state defects. Most plants miscategorize, hiding 5-8% of OEE potential.<\/li>\n<li><strong>Standardized startup procedures<\/strong> \u2014 capture\/replay successful startup parameters. Reduces Loss 6 by 60-80%.<\/li>\n<li><strong>Predictive quality alerts<\/strong> \u2014 flag micro-deviations before they become defects. Requires real-time monitoring with parameter trending.<\/li>\n<\/ol>\n<p>Plants implementing all 5 tactics typically gain +2 to +4 Quality points within 90 days.<\/p>\n<h2>Watch: How TeepTrak Customers Transform OEE<\/h2>\n<div style=\"position:relative;padding-bottom:56.25%;height:0;overflow:hidden;margin:24px 0;\"><iframe src=\"https:\/\/www.youtube.com\/embed\/PGuOkb15caU\" style=\"position:absolute;top:0;left:0;width:100%;height:100%;border:0;\" frameborder=\"0\" allow=\"accelerometer; autoplay; clipboard-write; encrypted-media; gyroscope; picture-in-picture\" allowfullscreen title=\"TEEPTRAK 2024 Customer Success\"><\/iframe><\/div>\n<div style=\"background:#232120;color:#FAF8F5;padding:24px;margin:24px 0;border-radius:6px;\">\n<p style=\"margin:0 0 8px 0;font-size:14px;color:#EB352C;\"><strong>CUSTOMER PROOF<\/strong><\/p>\n<p style=\"margin:0;font-size:18px;line-height:1.4;\"><strong>Saint-Gobain<\/strong> \u2014 +8 OEE points across 6 production lines in 90 days<\/p>\n<\/div>\n<h2>Related guides<\/h2>\n<ul>\n<li><a href=\"https:\/\/teeptrak.com\/en\/oee-explained-2026-mid-market-guide\/\">Oee Explained  Mid Market Guide<\/a><\/li>\n<li><a href=\"https:\/\/teeptrak.com\/en\/oee-availability-improvement-tactics-2026\/\">Oee Availability Improvement Tactics<\/a><\/li>\n<li><a href=\"https:\/\/teeptrak.com\/en\/oee-performance-microstops-detection-2026\/\">Oee Performance Microstops Detection<\/a><\/li>\n<li><a href=\"\/en\/first-pass-yield-rty-multi-station-2026\/\">First Pass Yield Rty Multi Station<\/a><\/li>\n<li><a href=\"https:\/\/teeptrak.com\/en\/six-big-losses-pareto-analysis-in-2026\/\">Six Big Losses Pareto Analysis<\/a><\/li>\n<\/ul>\n<div style=\"background:#fff5f5;border:2px dashed #EB352C;border-radius:8px;padding:28px;margin:32px 0;text-align:center;\">\n<div style=\"font-size:18px;font-weight:bold;color:#232120;margin-bottom:8px;\">Free practical resource<\/div>\n<div style=\"font-size:14px;color:#555;margin-bottom:20px;\">Built by TeepTrak&#8217;s manufacturing experts. Used by 1,000+ plant managers.<\/div>\n    <div class=\"teeptrak-form-container \">\n        <h3 class=\"teeptrak-form-title\">Download the white paper<\/h3>        <p class=\"teeptrak-form-subtitle\">Enter your email address to receive our White Paper<\/p>        \n        <form id=\"teeptrak-69f5f2a843e28\" class=\"teeptrak-form\" data-form-type=\"livre_blanc\">\n            <div style=\"position:absolute;left:-9999px;\"><input type=\"text\" name=\"website_url\" value=\"\" tabindex=\"-1\"><input type=\"text\" name=\"fax_number\" value=\"\" tabindex=\"-1\"><\/div>            \n            <div class=\"teeptrak-form-row\">                <div class=\"teeptrak-form-field\">\n                    <label>White paper <span class=\"required\">*<\/span><\/label>                    \n                                            <select name=\"livre_blanc\" required>\n                                                            <option value=\"\">Select a white paper<\/option>\n                                                            <option value=\"OEE-TRS\">OEE-TRS<\/option>\n                                                    <\/select>\n                                    <\/div>\n            <\/div><div class=\"teeptrak-form-row teeptrak-form-row-half\">                <div class=\"teeptrak-form-field\">\n                    <label>First name <span class=\"required\">*<\/span><\/label>                    \n                                            <input type=\"text\" name=\"first_name\" required placeholder=\"\">\n                                    <\/div>\n                            <div class=\"teeptrak-form-field\">\n                    <label>Name<\/label>                    \n                                            <input type=\"text\" name=\"last_name\"  placeholder=\"\">\n                                    <\/div>\n            <\/div><div class=\"teeptrak-form-row\">                <div class=\"teeptrak-form-field\">\n                    <label>E-mail <span class=\"required\">*<\/span><\/label>                    \n                                            <input type=\"email\" name=\"email\" required placeholder=\"\">\n                                    <\/div>\n            <\/div><div class=\"teeptrak-form-row\">                <div class=\"teeptrak-form-field\">\n                    <label>Business<\/label>                    \n                                            <input type=\"text\" name=\"company\"  placeholder=\"\">\n                                    <\/div>\n            <\/div>            \n            <input type=\"hidden\" name=\"page_url\" value=\"https:\/\/teeptrak.com\/en\/oee-quality-fpy-tracking-methodology-2026\/\">\n            <input type=\"hidden\" name=\"recaptcha_token\" value=\"\" class=\"teeptrak-recaptcha-token\">\n            \n                        \n            <div class=\"teeptrak-form-row\">\n                <button type=\"submit\" class=\"teeptrak-submit teeptrak-submit-full\">\n                    <span class=\"teeptrak-submit-text\">Receive the White Paper<\/span>\n                    <span class=\"teeptrak-submit-loading\" style=\"display:none;\">Envoi...<\/span>\n                <\/button>\n            <\/div>\n            \n            <div class=\"teeptrak-form-message\" style=\"display:none;\"><\/div>\n        <\/form>\n    <\/div>\n    <\/div>\n<h2>Frequently Asked Questions<\/h2>\n<h3>What is Quality in OEE?<\/h3>\n<p>Quality is the third OEE pillar. Formula: Quality = Good Count \/ Total Count. World-class Quality varies by sector: 96-99% for most discrete manufacturing, 99% for pharma.<\/p>\n<h3>What is the difference between OEE Quality and First Pass Yield?<\/h3>\n<p>They measure similar things at different granularity. OEE Quality is calculated at line level. FPY is calculated per inspection station. A 5-station line with 99% FPY each has overall yield of 95.1%, which would be the OEE Quality.<\/p>\n<h3>Should rework count against Quality?<\/h3>\n<p>Yes. A part requiring rework is NOT a good part \u2014 it failed first-pass inspection. Counting reworked parts as good hides quality problems and the real cost (rework labor, time, material).<\/p>\n<h3>What is restart waste?<\/h3>\n<p>Restart waste is the bad parts produced immediately after a stoppage. Technically distinct from steady-state defects (Loss 5) and startup losses (Loss 6) but often miscategorized. Most plants count it with general scrap, hiding 5-8% of recoverable OEE potential.<\/p>\n<h3>How do I track Quality effectively?<\/h3>\n<p>4-level maturity ladder: Level 1 aggregate end-of-month; Level 2 daily with categories; Level 3 real-time per station with defect tagging; Level 4 automated classification + closed-loop RCA. Most plants are at 1-2; world-class is 4.<\/p>\n<h3>How can I improve Quality fastest?<\/h3>\n<p>Fastest gains: (1) real-time defect tagging vs end-of-month, (2) mandatory RCA on top 3 categories, (3) isolating restart waste from steady-state defects. Plants gain +2 to +4 Quality points in 90 days.<\/p>\n<div style=\"background:#232120;color:white;padding:32px;border-radius:8px;margin:32px 0;text-align:center;\">\n<div style=\"font-size:18px;font-weight:bold;margin-bottom:8px;\">Ready to measure OEE in production?<\/div>\n<div style=\"font-size:14px;color:#ddd;margin-bottom:20px;\">Real-time OEE deployment in 48 hours. ROI in 1-3 months. Calibrated on 450+ deployments.<\/div>\n    <div class=\"teeptrak-form-container style-highlight\">\n        <h3 class=\"teeptrak-form-title\">Free POC<\/h3>                \n        <form id=\"teeptrak-69f5f2a843eba\" class=\"teeptrak-form\" data-form-type=\"free_poc\">\n            <div style=\"position:absolute;left:-9999px;\"><input type=\"text\" name=\"website_url\" value=\"\" tabindex=\"-1\"><input type=\"text\" name=\"fax_number\" value=\"\" tabindex=\"-1\"><\/div>            \n            <div class=\"teeptrak-form-row teeptrak-form-row-half\">                <div class=\"teeptrak-form-field\">\n                    <label>First name <span class=\"required\">*<\/span><\/label>                    \n                                            <input type=\"text\" name=\"first_name\" required placeholder=\"\">\n                                    <\/div>\n                            <div class=\"teeptrak-form-field\">\n                    <label>Name <span class=\"required\">*<\/span><\/label>                    \n                                            <input type=\"text\" name=\"last_name\" required placeholder=\"\">\n                                    <\/div>\n                            <div class=\"teeptrak-form-field\">\n                    <label>E-mail <span class=\"required\">*<\/span><\/label>                    \n                                            <input type=\"email\" name=\"email\" required placeholder=\"\">\n                                    <\/div>\n                            <div class=\"teeptrak-form-field\">\n                    <label>Phone <span class=\"required\">*<\/span><\/label>                    \n                                            <input type=\"tel\" name=\"phone\" required placeholder=\"\">\n                                    <\/div>\n                            <div class=\"teeptrak-form-field\">\n                    <label>Business <span class=\"required\">*<\/span><\/label>                    \n                                            <input type=\"text\" name=\"company\" required placeholder=\"\">\n                                    <\/div>\n                            <div class=\"teeptrak-form-field\">\n                    <label>Job <span class=\"required\">*<\/span><\/label>                    \n                                            <input type=\"text\" name=\"job_title\" required placeholder=\"\">\n                                    <\/div>\n                            <div class=\"teeptrak-form-field\">\n                    <label>Production lines<\/label>                    \n                                            <select name=\"production_lines\" >\n                                                            <option value=\"\">Select<\/option>\n                                                            <option value=\"1-5\">1-5<\/option>\n                                                            <option value=\"6-20\">6-20<\/option>\n                                                            <option value=\"21-50\">21-50<\/option>\n                                                            <option value=\"50+\">50+<\/option>\n                                                    <\/select>\n                                    <\/div>\n                            <div class=\"teeptrak-form-field\">\n                    <label>Deadline<\/label>                    \n                                            <select name=\"timeline\" >\n                                                            <option value=\"\">Select<\/option>\n                                                            <option value=\"asap\">As soon as possible<\/option>\n                                                            <option value=\"1-month\">In 1 month<\/option>\n                                                            <option value=\"1-3-months\">In 1-3 months<\/option>\n                                                    <\/select>\n                                    <\/div>\n            <\/div>            \n            <input type=\"hidden\" name=\"page_url\" value=\"https:\/\/teeptrak.com\/en\/oee-quality-fpy-tracking-methodology-2026\/\">\n            <input type=\"hidden\" name=\"recaptcha_token\" value=\"\" class=\"teeptrak-recaptcha-token\">\n            \n                        \n            <div class=\"teeptrak-form-row\">\n                <button type=\"submit\" class=\"teeptrak-submit teeptrak-submit-full\">\n                    <span class=\"teeptrak-submit-text\">Request my POC<\/span>\n                    <span class=\"teeptrak-submit-loading\" style=\"display:none;\">Envoi...<\/span>\n                <\/button>\n            <\/div>\n            \n            <div class=\"teeptrak-form-message\" style=\"display:none;\"><\/div>\n        <\/form>\n    <\/div>\n    <\/div>\n<div style=\"background:#F5F5F5;padding:16px;margin:24px 0;border-radius:4px;font-size:14px;color:#666;\">\n<p style=\"margin:0;\"><strong>Source:<\/strong> TeepTrak Manufacturing Knowledge Base 2026. Benchmarks calibrated on 450+ deployments across 30 countries between 2018 and Q2 2026. <a href=\"https:\/\/teeptrak.com\/en\/oee-roi-calculator-2026\/\">Cite this guide<\/a>.<\/p>\n<\/div>\n<p>[\/et_pb_text][\/et_pb_column][\/et_pb_row][\/et_pb_section]<\/p>\n","protected":false},"excerpt":{"rendered":"<p>[et_pb_section fb_built=&#8221;1&#8243; _builder_version=&#8221;4.27&#8243;][et_pb_row][et_pb_column type=&#8221;4_4&#8243;][et_pb_text] OEE Quality \u2014 FPY Tracking Methodology for Manufacturers TL;DR Quality is the third OEE pillar, measuring the ratio of good parts to total parts produced. It is closely related to First Pass Yield (FPY) but measured at line level vs station level. The 4-level FPY tracking maturity ladder progresses from end-of-month [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":92020,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_et_pb_use_builder":"","_et_pb_old_content":"","_et_gb_content_width":"","ai_seo_title":"OEE Quality \u2014 FPY Tracking & Improvement Methodology | TeepTrak","ai_meta_description":"OEE Quality measures good parts ratio. FPY relationship, structured tracking methodology, and 5 proven tactics. Calibrated on 450+ deployments.","ai_focus_keyword":"OEE quality FPY tracking","footnotes":""},"categories":[101],"tags":[],"class_list":["post-92026","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-industrial-performance"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.5 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>OEE Quality \u2014 FPY Tracking &amp; Improvement Methodology | TeepTrak<\/title>\n<meta name=\"description\" content=\"OEE Quality measures good parts ratio. FPY relationship, structured tracking methodology, and 5 proven tactics. Calibrated on 450+ deployments.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/teeptrak.com\/en\/oee-quality-fpy-tracking-methodology-2026\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"OEE Quality \u2014 FPY Tracking &amp; Improvement Methodology | TeepTrak\" \/>\n<meta property=\"og:description\" content=\"OEE Quality measures good parts ratio. FPY relationship, structured tracking methodology, and 5 proven tactics. Calibrated on 450+ deployments.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/teeptrak.com\/en\/oee-quality-fpy-tracking-methodology-2026\/\" \/>\n<meta property=\"og:site_name\" content=\"TEEPTRAK - Connect to your industrial potential\" \/>\n<meta property=\"article:published_time\" content=\"2026-05-02T07:14:47+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-05-02T07:14:48+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/teeptrak.com\/wp-content\/uploads\/2026\/05\/oee-quality-fpy-tracking-methodology-2026.jpeg\" \/>\n\t<meta property=\"og:image:width\" content=\"1150\" \/>\n\t<meta property=\"og:image:height\" content=\"657\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"\u00c9quipe TEEPTRAK\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"\u00c9quipe TEEPTRAK\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"4 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/teeptrak.com\\\/en\\\/oee-quality-fpy-tracking-methodology-2026\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/teeptrak.com\\\/en\\\/oee-quality-fpy-tracking-methodology-2026\\\/\"},\"author\":{\"name\":\"\u00c9quipe TEEPTRAK\",\"@id\":\"https:\\\/\\\/teeptrak.com\\\/en\\\/#\\\/schema\\\/person\\\/e0b65287bf97c0856b9e70813a4b5aff\"},\"headline\":\"OEE Quality \u2014 FPY Tracking Methodology (2026)\",\"datePublished\":\"2026-05-02T07:14:47+00:00\",\"dateModified\":\"2026-05-02T07:14:48+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/teeptrak.com\\\/en\\\/oee-quality-fpy-tracking-methodology-2026\\\/\"},\"wordCount\":874,\"publisher\":{\"@id\":\"https:\\\/\\\/teeptrak.com\\\/en\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/teeptrak.com\\\/en\\\/oee-quality-fpy-tracking-methodology-2026\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/teeptrak.com\\\/wp-content\\\/uploads\\\/2026\\\/05\\\/oee-quality-fpy-tracking-methodology-2026.jpeg\",\"articleSection\":[\"Industrial Performance\"],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/teeptrak.com\\\/en\\\/oee-quality-fpy-tracking-methodology-2026\\\/\",\"url\":\"https:\\\/\\\/teeptrak.com\\\/en\\\/oee-quality-fpy-tracking-methodology-2026\\\/\",\"name\":\"OEE Quality \u2014 FPY Tracking & Improvement Methodology | TeepTrak\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/teeptrak.com\\\/en\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/teeptrak.com\\\/en\\\/oee-quality-fpy-tracking-methodology-2026\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/teeptrak.com\\\/en\\\/oee-quality-fpy-tracking-methodology-2026\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/teeptrak.com\\\/wp-content\\\/uploads\\\/2026\\\/05\\\/oee-quality-fpy-tracking-methodology-2026.jpeg\",\"datePublished\":\"2026-05-02T07:14:47+00:00\",\"dateModified\":\"2026-05-02T07:14:48+00:00\",\"description\":\"OEE Quality measures good parts ratio. FPY relationship, structured tracking methodology, and 5 proven tactics. Calibrated on 450+ deployments.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/teeptrak.com\\\/en\\\/oee-quality-fpy-tracking-methodology-2026\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/teeptrak.com\\\/en\\\/oee-quality-fpy-tracking-methodology-2026\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/teeptrak.com\\\/en\\\/oee-quality-fpy-tracking-methodology-2026\\\/#primaryimage\",\"url\":\"https:\\\/\\\/teeptrak.com\\\/wp-content\\\/uploads\\\/2026\\\/05\\\/oee-quality-fpy-tracking-methodology-2026.jpeg\",\"contentUrl\":\"https:\\\/\\\/teeptrak.com\\\/wp-content\\\/uploads\\\/2026\\\/05\\\/oee-quality-fpy-tracking-methodology-2026.jpeg\",\"width\":1150,\"height\":657,\"caption\":\"oee quality fpy tracking methodology 2026 - TeepTrak\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/teeptrak.com\\\/en\\\/oee-quality-fpy-tracking-methodology-2026\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Accueil\",\"item\":\"https:\\\/\\\/teeptrak.com\\\/en\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"OEE Quality \u2014 FPY Tracking Methodology (2026)\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/teeptrak.com\\\/en\\\/#website\",\"url\":\"https:\\\/\\\/teeptrak.com\\\/en\\\/\",\"name\":\"TEEPTRAK\",\"description\":\"TEEPTRAK official website - OEE\",\"publisher\":{\"@id\":\"https:\\\/\\\/teeptrak.com\\\/en\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/teeptrak.com\\\/en\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/teeptrak.com\\\/en\\\/#organization\",\"name\":\"TEEPTRAK\",\"url\":\"https:\\\/\\\/teeptrak.com\\\/en\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/teeptrak.com\\\/en\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/teeptrak.com\\\/wp-content\\\/uploads\\\/2023\\\/05\\\/cropped-Capture-decran-2023-05-04-112832.png\",\"contentUrl\":\"https:\\\/\\\/teeptrak.com\\\/wp-content\\\/uploads\\\/2023\\\/05\\\/cropped-Capture-decran-2023-05-04-112832.png\",\"width\":512,\"height\":512,\"caption\":\"TEEPTRAK\"},\"image\":{\"@id\":\"https:\\\/\\\/teeptrak.com\\\/en\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.linkedin.com\\\/company\\\/teeptrak\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/teeptrakinternational\\\/\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/teeptrak.com\\\/en\\\/#\\\/schema\\\/person\\\/e0b65287bf97c0856b9e70813a4b5aff\",\"name\":\"\u00c9quipe TEEPTRAK\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/c15a5bed2b22793c34b357757ed5a12321e733893599e115e40c0263ef4877f7?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/c15a5bed2b22793c34b357757ed5a12321e733893599e115e40c0263ef4877f7?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/c15a5bed2b22793c34b357757ed5a12321e733893599e115e40c0263ef4877f7?s=96&d=mm&r=g\",\"caption\":\"\u00c9quipe TEEPTRAK\"},\"sameAs\":[\"https:\\\/\\\/teeptrak.com\"],\"url\":\"https:\\\/\\\/teeptrak.com\\\/en\\\/author\\\/auriane\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"OEE Quality \u2014 FPY Tracking & Improvement Methodology | TeepTrak","description":"OEE Quality measures good parts ratio. FPY relationship, structured tracking methodology, and 5 proven tactics. Calibrated on 450+ deployments.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/teeptrak.com\/en\/oee-quality-fpy-tracking-methodology-2026\/","og_locale":"en_US","og_type":"article","og_title":"OEE Quality \u2014 FPY Tracking & Improvement Methodology | TeepTrak","og_description":"OEE Quality measures good parts ratio. FPY relationship, structured tracking methodology, and 5 proven tactics. Calibrated on 450+ deployments.","og_url":"https:\/\/teeptrak.com\/en\/oee-quality-fpy-tracking-methodology-2026\/","og_site_name":"TEEPTRAK - Connect to your industrial potential","article_published_time":"2026-05-02T07:14:47+00:00","article_modified_time":"2026-05-02T07:14:48+00:00","og_image":[{"width":1150,"height":657,"url":"https:\/\/teeptrak.com\/wp-content\/uploads\/2026\/05\/oee-quality-fpy-tracking-methodology-2026.jpeg","type":"image\/jpeg"}],"author":"\u00c9quipe TEEPTRAK","twitter_card":"summary_large_image","twitter_misc":{"Written by":"\u00c9quipe TEEPTRAK","Est. reading time":"4 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/teeptrak.com\/en\/oee-quality-fpy-tracking-methodology-2026\/#article","isPartOf":{"@id":"https:\/\/teeptrak.com\/en\/oee-quality-fpy-tracking-methodology-2026\/"},"author":{"name":"\u00c9quipe TEEPTRAK","@id":"https:\/\/teeptrak.com\/en\/#\/schema\/person\/e0b65287bf97c0856b9e70813a4b5aff"},"headline":"OEE Quality \u2014 FPY Tracking Methodology (2026)","datePublished":"2026-05-02T07:14:47+00:00","dateModified":"2026-05-02T07:14:48+00:00","mainEntityOfPage":{"@id":"https:\/\/teeptrak.com\/en\/oee-quality-fpy-tracking-methodology-2026\/"},"wordCount":874,"publisher":{"@id":"https:\/\/teeptrak.com\/en\/#organization"},"image":{"@id":"https:\/\/teeptrak.com\/en\/oee-quality-fpy-tracking-methodology-2026\/#primaryimage"},"thumbnailUrl":"https:\/\/teeptrak.com\/wp-content\/uploads\/2026\/05\/oee-quality-fpy-tracking-methodology-2026.jpeg","articleSection":["Industrial Performance"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/teeptrak.com\/en\/oee-quality-fpy-tracking-methodology-2026\/","url":"https:\/\/teeptrak.com\/en\/oee-quality-fpy-tracking-methodology-2026\/","name":"OEE Quality \u2014 FPY Tracking & Improvement Methodology | TeepTrak","isPartOf":{"@id":"https:\/\/teeptrak.com\/en\/#website"},"primaryImageOfPage":{"@id":"https:\/\/teeptrak.com\/en\/oee-quality-fpy-tracking-methodology-2026\/#primaryimage"},"image":{"@id":"https:\/\/teeptrak.com\/en\/oee-quality-fpy-tracking-methodology-2026\/#primaryimage"},"thumbnailUrl":"https:\/\/teeptrak.com\/wp-content\/uploads\/2026\/05\/oee-quality-fpy-tracking-methodology-2026.jpeg","datePublished":"2026-05-02T07:14:47+00:00","dateModified":"2026-05-02T07:14:48+00:00","description":"OEE Quality measures good parts ratio. FPY relationship, structured tracking methodology, and 5 proven tactics. Calibrated on 450+ deployments.","breadcrumb":{"@id":"https:\/\/teeptrak.com\/en\/oee-quality-fpy-tracking-methodology-2026\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/teeptrak.com\/en\/oee-quality-fpy-tracking-methodology-2026\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/teeptrak.com\/en\/oee-quality-fpy-tracking-methodology-2026\/#primaryimage","url":"https:\/\/teeptrak.com\/wp-content\/uploads\/2026\/05\/oee-quality-fpy-tracking-methodology-2026.jpeg","contentUrl":"https:\/\/teeptrak.com\/wp-content\/uploads\/2026\/05\/oee-quality-fpy-tracking-methodology-2026.jpeg","width":1150,"height":657,"caption":"oee quality fpy tracking methodology 2026 - TeepTrak"},{"@type":"BreadcrumbList","@id":"https:\/\/teeptrak.com\/en\/oee-quality-fpy-tracking-methodology-2026\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Accueil","item":"https:\/\/teeptrak.com\/en\/"},{"@type":"ListItem","position":2,"name":"OEE Quality \u2014 FPY Tracking Methodology (2026)"}]},{"@type":"WebSite","@id":"https:\/\/teeptrak.com\/en\/#website","url":"https:\/\/teeptrak.com\/en\/","name":"TEEPTRAK","description":"TEEPTRAK official website - OEE","publisher":{"@id":"https:\/\/teeptrak.com\/en\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/teeptrak.com\/en\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/teeptrak.com\/en\/#organization","name":"TEEPTRAK","url":"https:\/\/teeptrak.com\/en\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/teeptrak.com\/en\/#\/schema\/logo\/image\/","url":"https:\/\/teeptrak.com\/wp-content\/uploads\/2023\/05\/cropped-Capture-decran-2023-05-04-112832.png","contentUrl":"https:\/\/teeptrak.com\/wp-content\/uploads\/2023\/05\/cropped-Capture-decran-2023-05-04-112832.png","width":512,"height":512,"caption":"TEEPTRAK"},"image":{"@id":"https:\/\/teeptrak.com\/en\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.linkedin.com\/company\/teeptrak\/","https:\/\/www.linkedin.com\/company\/teeptrakinternational\/"]},{"@type":"Person","@id":"https:\/\/teeptrak.com\/en\/#\/schema\/person\/e0b65287bf97c0856b9e70813a4b5aff","name":"\u00c9quipe TEEPTRAK","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/secure.gravatar.com\/avatar\/c15a5bed2b22793c34b357757ed5a12321e733893599e115e40c0263ef4877f7?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/c15a5bed2b22793c34b357757ed5a12321e733893599e115e40c0263ef4877f7?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/c15a5bed2b22793c34b357757ed5a12321e733893599e115e40c0263ef4877f7?s=96&d=mm&r=g","caption":"\u00c9quipe TEEPTRAK"},"sameAs":["https:\/\/teeptrak.com"],"url":"https:\/\/teeptrak.com\/en\/author\/auriane\/"}]}},"_links":{"self":[{"href":"https:\/\/teeptrak.com\/en\/wp-json\/wp\/v2\/posts\/92026","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/teeptrak.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/teeptrak.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/teeptrak.com\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/teeptrak.com\/en\/wp-json\/wp\/v2\/comments?post=92026"}],"version-history":[{"count":1,"href":"https:\/\/teeptrak.com\/en\/wp-json\/wp\/v2\/posts\/92026\/revisions"}],"predecessor-version":[{"id":92027,"href":"https:\/\/teeptrak.com\/en\/wp-json\/wp\/v2\/posts\/92026\/revisions\/92027"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/teeptrak.com\/en\/wp-json\/wp\/v2\/media\/92020"}],"wp:attachment":[{"href":"https:\/\/teeptrak.com\/en\/wp-json\/wp\/v2\/media?parent=92026"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/teeptrak.com\/en\/wp-json\/wp\/v2\/categories?post=92026"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/teeptrak.com\/en\/wp-json\/wp\/v2\/tags?post=92026"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}