{"id":89555,"date":"2026-04-23T10:11:55","date_gmt":"2026-04-23T10:11:55","guid":{"rendered":"https:\/\/teeptrak.com\/lean-manufacturing-six-sigma-2026-guide\/"},"modified":"2026-04-23T10:11:56","modified_gmt":"2026-04-23T10:11:56","slug":"lean-manufacturing-six-sigma-2026-guide","status":"publish","type":"post","link":"https:\/\/teeptrak.com\/en\/lean-manufacturing-six-sigma-2026-guide\/","title":{"rendered":"Lean Manufacturing and Six Sigma: The 2026 Guide for US Plant Managers"},"content":{"rendered":"<p>[et_pb_section fb_built=&#8221;1&#8243; _builder_version=&#8221;4.27&#8243;][et_pb_row][et_pb_column type=&#8221;4_4&#8243;][et_pb_text]<\/p>\n<h1>Lean Manufacturing and Six Sigma: The 2026 Guide for US Plant Managers<\/h1>\n<p>Lean Manufacturing and Six Sigma have been the dominant operational improvement frameworks in US manufacturing for three decades. The Toyota Production System that gave birth to Lean in the 1950s; the Motorola quality discipline that gave birth to Six Sigma in the 1980s; the GE-led integration of the two in the 1990s that produced Lean Six Sigma \u2014 together, these frameworks have shaped how US plants define, measure and pursue operational excellence.<\/p>\n<p>But the way these frameworks are deployed in 2026 is different from how they were deployed in 2006. The core philosophy has not changed \u2014 eliminate waste, reduce variation, respect operators, improve continuously \u2014 but the infrastructure supporting the work has. Real-time OEE monitoring, digital SPC, machine-learning root-cause analysis, and plug-and-play IIoT have transformed what a Lean or Six Sigma program can actually accomplish in a modern US plant.<\/p>\n<p>This article is for US plant managers, continuous improvement leaders, and operations directors who have either grown up with these frameworks and want to know what has changed, or who are implementing them for the first time in 2026 and want to avoid the design mistakes that led so many programs to fade out after the initial enthusiasm. It covers the core principles, the integration points between Lean and Six Sigma, the certification landscape, and the specific infrastructure choices that predict whether a program will still be delivering results in year three.<\/p>\n<h2>Where Lean and Six Sigma Came From \u2014 And Why They Became Dominant<\/h2>\n<p>Lean Manufacturing emerged from Toyota&#8217;s Production System (TPS), developed primarily by Taiichi Ohno and Shigeo Shingo from the 1950s through the 1970s. The core insight was that American mass production \u2014 highly capital-intensive, optimized for long production runs, dependent on large buffer inventories \u2014 was not the only way to build cars efficiently. Toyota, facing postwar Japan&#8217;s capital scarcity and fragmented demand, developed an alternative approach based on small-batch flow, pull-based production, just-in-time inventory, and systematic waste elimination. By the late 1980s the results were undeniable: Toyota built higher-quality cars with less capital, less inventory, less floor space and less labor than its American competitors.<\/p>\n<p>Six Sigma emerged in parallel from Motorola in the 1980s, driven by engineer Bill Smith. Where Lean focused on flow and waste, Six Sigma focused on variation and defects \u2014 a statistical approach that aimed for a defect rate below 3.4 per million opportunities (the &#8220;six sigma&#8221; level of statistical process control). Jack Welch at GE famously mandated Six Sigma across all GE businesses in 1995, which cemented its adoption across US manufacturing and created the Green Belt \/ Black Belt certification ecosystem that still dominates continuous improvement training today.<\/p>\n<p>By the mid-2000s, most serious US manufacturing organizations had recognized that Lean and Six Sigma were complementary rather than competing. Lean Six Sigma \u2014 sometimes abbreviated LSS \u2014 integrates Lean&#8217;s flow-and-waste philosophy with Six Sigma&#8217;s variation-reduction statistical tools. DMAIC (Define, Measure, Analyze, Improve, Control) became the standard project framework; Value Stream Mapping, 5S, SMED, and Poka-Yoke became the standard tools; Green Belt and Black Belt became the standard certification levels.<\/p>\n<h2>The Eight Wastes of Lean \u2014 The Foundation Every Certification Teaches<\/h2>\n<p>Every Lean Manufacturing training program, from a one-day plant orientation to a six-month Black Belt certification, starts with the eight wastes. The eight wastes are Lean&#8217;s operational lens \u2014 the category system through which any production process can be evaluated. Understanding them is the prerequisite for doing any useful Lean work on a plant floor.<\/p>\n<p>The eight wastes are commonly remembered by the acronym DOWNTIME: <strong>D<\/strong>efects, <strong>O<\/strong>verproduction, <strong>W<\/strong>aiting, <strong>N<\/strong>on-utilized talent, <strong>T<\/strong>ransportation, <strong>I<\/strong>nventory, <strong>M<\/strong>otion, and <strong>E<\/strong>xtra processing. Every production activity on a plant floor either adds value for the customer or falls into one of these eight categories. The Lean improvement agenda, at its simplest, is to systematically eliminate the eight as much as physically possible.<\/p>\n<p>In 2026, the interesting development around the eight wastes is the data quality problem. You cannot eliminate what you cannot see, and most US plants still operate with dramatic blind spots on three of the eight: waiting (micro-stops that don&#8217;t get tagged because they are too short for operators to log), defects (quality issues that surface only at end-of-line inspection), and motion (operator time allocation that no dashboard captures). Real-time OEE monitoring with external sensors has changed this \u2014 waiting and micro-stops can now be captured at sub-minute granularity, defects can be tagged in real time via digital SPC, and motion can be inferred from cycle-time variance patterns. The infrastructure for seeing the eight wastes is finally catching up with the ambition of Lean as a philosophy.<\/p>\n<div style=\"background:#fff5f5;border:2px dashed #EB352C;border-radius:8px;padding:28px;margin:32px 0;text-align:center;\">\n<div style=\"font-size:18px;font-weight:bold;color:#232120;margin-bottom:8px;\">Free Download \u2014 48-Hour POC Planning Kit<\/div>\n<div style=\"font-size:14px;color:#555;margin-bottom:20px;\">Structured playbook to run a rapid OEE POC on any US plant. Checklist + timeline + decision framework.<\/div>\n    <div class=\"teeptrak-asset-container tta-style-default\">\n                    <h3 class=\"tta-title\">Free Download<\/h3>\n                            <p class=\"tta-subtitle\">Instant download. No email confirmation needed.<\/p>\n        \n        <form id=\"tta-form-69ea263790bd9\" class=\"teeptrak-asset-form\" data-asset-id=\"poc-kit\">\n            <div style=\"position:absolute;left:-9999px;top:-9999px;width:1px;height:1px;overflow:hidden;\" aria-hidden=\"true\"><input type=\"text\" name=\"website_url\" tabindex=\"-1\" autocomplete=\"off\"><input type=\"text\" name=\"fax_number\" tabindex=\"-1\" autocomplete=\"off\"><\/div>\n            <input type=\"hidden\" name=\"asset_id\" value=\"poc-kit\">\n            <input type=\"hidden\" name=\"asset_label\" value=\"48h POC Planning Kit\">\n            <input type=\"hidden\" name=\"pdf_url_en\" value=\"https:\/\/teeptrak.com\/wp-content\/uploads\/2026\/04\/teeptrak-48h-poc-planning-kit-en.pdf\">\n            <input type=\"hidden\" name=\"pdf_url_fr\" value=\"\">\n            <input type=\"hidden\" name=\"pdf_url_cn\" value=\"\">\n            <input type=\"hidden\" name=\"pdf_url_de\" value=\"\">\n            <input type=\"hidden\" name=\"pdf_url_es\" value=\"\">\n            <input type=\"hidden\" name=\"pdf_url_nl\" value=\"\">\n            <input type=\"hidden\" name=\"page_url\" value=\"https:\/\/teeptrak.com\/en\/lean-manufacturing-six-sigma-2026-guide\/\">\n\n            <div class=\"tta-row tta-row-half\">\n                <div class=\"tta-field\">\n                    <label>First name <span class=\"tta-required\">*<\/span><\/label>\n                    <input type=\"text\" name=\"first_name\" required autocomplete=\"given-name\">\n                <\/div>\n                <div class=\"tta-field\">\n                    <label>Last name <span class=\"tta-required\">*<\/span><\/label>\n                    <input type=\"text\" name=\"last_name\" required autocomplete=\"family-name\">\n                <\/div>\n            <\/div>\n\n            <div class=\"tta-row\">\n                <div class=\"tta-field\">\n                    <label>Business email <span class=\"tta-required\">*<\/span><\/label>\n                    <input type=\"email\" name=\"email\" required autocomplete=\"email\">\n                <\/div>\n            <\/div>\n\n            <div class=\"tta-row tta-row-half\">\n                <div class=\"tta-field\">\n                    <label>Company <span class=\"tta-required\">*<\/span><\/label>\n                    <input type=\"text\" name=\"company\" required autocomplete=\"organization\">\n                <\/div>\n                                <div class=\"tta-field\">\n                    <label>Job title<\/label>\n                    <input type=\"text\" name=\"job_title\" autocomplete=\"organization-title\">\n                <\/div>\n                            <\/div>\n\n                        <div class=\"tta-row\">\n                <div class=\"tta-field\">\n                    <label>Phone (optional)<\/label>\n                    <input type=\"tel\" name=\"phone\" autocomplete=\"tel\">\n                <\/div>\n            <\/div>\n            \n            <div class=\"tta-row\">\n                <label class=\"tta-consent\">\n                    <input type=\"checkbox\" name=\"consent_marketing\" value=\"1\">\n                    <span>I agree to receive occasional TeepTrak updates (unsubscribe anytime).<\/span>\n                <\/label>\n            <\/div>\n\n            <div class=\"tta-row\">\n                <button type=\"submit\" class=\"tta-submit\">\n                    <span class=\"tta-submit-text\">Download Kit<\/span>\n                    <span class=\"tta-submit-loading\" style=\"display:none;\">Processing\u2026<\/span>\n                <\/button>\n            <\/div>\n\n            <div class=\"tta-legal\">\n                By submitting, you agree to our privacy policy. We use your email only to follow up on this download.            <\/div>\n\n            <div class=\"tta-message\" style=\"display:none;\"><\/div>\n        <\/form>\n    <\/div>\n    <\/div>\n<h2>DMAIC: The Six Sigma Project Framework<\/h2>\n<p>DMAIC is Six Sigma&#8217;s core project lifecycle: <strong>D<\/strong>efine the problem, <strong>M<\/strong>easure the current state, <strong>A<\/strong>nalyze the root causes, <strong>I<\/strong>mprove the process, <strong>C<\/strong>ontrol the improvement. Every Green Belt and Black Belt project follows DMAIC. The framework is straightforward; the discipline it requires is not.<\/p>\n<p>The single most common failure mode of US Lean Six Sigma programs is that projects skip the Measure phase. Teams arrive at a diagnostic session with an opinion about the root cause, jump to Improve with a proposed fix, and never build the baseline data infrastructure that would let them tell whether the fix worked. The program produces a lot of activity but very little compounding improvement \u2014 because without the Measure and Control phases, each project&#8217;s gains evaporate once the team moves to the next project.<\/p>\n<p>This is precisely where the infrastructure argument matters. Real-time OEE monitoring means the Measure phase does not require a three-week manual data-collection project at the start of every DMAIC cycle. The baseline is already there, continuously updated. Similarly, the Control phase \u2014 holding the gain \u2014 no longer depends on operators remembering to run weekly SPC checks; it is automatic. US plants that have deployed continuous monitoring infrastructure consistently report that their DMAIC project cycles shorten from six months to ten weeks, and their Improvement gains actually hold over time rather than drifting back to baseline.<\/p>\n<h2>Lean Manufacturing Tools: Value Stream Mapping, 5S, SMED, Kanban, Poka-Yoke<\/h2>\n<p>The Lean toolkit is large, but five tools cover 80% of the practical work on US plant floors:<\/p>\n<p><strong>Value Stream Mapping (VSM)<\/strong> \u2014 Document the current process, identify waste, design the future state. VSM is the entry point for any serious Lean program because it forces the team to see the whole flow rather than optimize locally. A typical VSM engagement at a US plant takes two to four weeks for the initial current-state map, followed by facilitated future-state design.<\/p>\n<p><strong>5S<\/strong> \u2014 Sort, Set in Order, Shine, Standardize, Sustain. The visual and physical organization discipline that underlies every other Lean tool. Without 5S, nothing else sticks; with 5S, most Lean tools become enforceable. The Sustain phase is where most 5S programs fail \u2014 initial enthusiasm fades, the floor drifts back, and the effort is lost. Digital visual management (MoniTrak-style dashboards) can enforce Sustain by continuously surfacing 5S audit results.<\/p>\n<p><strong>SMED (Single-Minute Exchange of Die)<\/strong> \u2014 The methodology for reducing changeover time. Shigeo Shingo&#8217;s original work at Toyota showed that changeovers that once took hours could be reduced to minutes through systematic analysis of internal vs external setup work. SMED remains the highest-ROI Lean tool in US discrete manufacturing \u2014 changeover reduction directly unlocks capacity, and OEE measurement makes the before-and-after comparison rigorous rather than anecdotal.<\/p>\n<p><strong>Kanban<\/strong> \u2014 Pull-based production signaling. The visual card system that Toyota developed to match production to demand without central scheduling. Kanban is now often implemented digitally (dashboards, ERP integration) rather than with physical cards, but the core pull-flow philosophy remains.<\/p>\n<p><strong>Poka-Yoke<\/strong> \u2014 Mistake-proofing. The discipline of designing processes so that operator errors are physically prevented rather than caught after the fact. Poka-Yoke devices range from simple fixtures that prevent a part from being installed backwards to software interlocks that prevent out-of-spec parameters from being entered.<\/p>\n<div style=\"background:#fff5f5;border:2px dashed #EB352C;border-radius:8px;padding:28px;margin:32px 0;text-align:center;\">\n<div style=\"font-size:18px;font-weight:bold;color:#232120;margin-bottom:8px;\">Free Tool \u2014 OEE Calculator (Excel)<\/div>\n<div style=\"font-size:14px;color:#555;margin-bottom:20px;\">Client-ready Excel with formulas for Availability \u00d7 Performance \u00d7 Quality. Ready for your next plant walk.<\/div>\n    <div class=\"teeptrak-asset-container tta-style-default\">\n                    <h3 class=\"tta-title\">Free Download<\/h3>\n                            <p class=\"tta-subtitle\">Instant download. No email confirmation needed.<\/p>\n        \n        <form id=\"tta-form-69ea263790c50\" class=\"teeptrak-asset-form\" data-asset-id=\"oee-calc\">\n            <div style=\"position:absolute;left:-9999px;top:-9999px;width:1px;height:1px;overflow:hidden;\" aria-hidden=\"true\"><input type=\"text\" name=\"website_url\" tabindex=\"-1\" autocomplete=\"off\"><input type=\"text\" name=\"fax_number\" tabindex=\"-1\" autocomplete=\"off\"><\/div>\n            <input type=\"hidden\" name=\"asset_id\" value=\"oee-calc\">\n            <input type=\"hidden\" name=\"asset_label\" value=\"OEE Calculator\">\n            <input type=\"hidden\" name=\"pdf_url_en\" value=\"https:\/\/teeptrak.com\/wp-content\/uploads\/2026\/04\/teeptrak-oee-calculator-en.xlsx\">\n            <input type=\"hidden\" name=\"pdf_url_fr\" value=\"\">\n            <input type=\"hidden\" name=\"pdf_url_cn\" value=\"\">\n            <input type=\"hidden\" name=\"pdf_url_de\" value=\"\">\n            <input type=\"hidden\" name=\"pdf_url_es\" value=\"\">\n            <input type=\"hidden\" name=\"pdf_url_nl\" value=\"\">\n            <input type=\"hidden\" name=\"page_url\" value=\"https:\/\/teeptrak.com\/en\/lean-manufacturing-six-sigma-2026-guide\/\">\n\n            <div class=\"tta-row tta-row-half\">\n                <div class=\"tta-field\">\n                    <label>First name <span class=\"tta-required\">*<\/span><\/label>\n                    <input type=\"text\" name=\"first_name\" required autocomplete=\"given-name\">\n                <\/div>\n                <div class=\"tta-field\">\n                    <label>Last name <span class=\"tta-required\">*<\/span><\/label>\n                    <input type=\"text\" name=\"last_name\" required autocomplete=\"family-name\">\n                <\/div>\n            <\/div>\n\n            <div class=\"tta-row\">\n                <div class=\"tta-field\">\n                    <label>Business email <span class=\"tta-required\">*<\/span><\/label>\n                    <input type=\"email\" name=\"email\" required autocomplete=\"email\">\n                <\/div>\n            <\/div>\n\n            <div class=\"tta-row tta-row-half\">\n                <div class=\"tta-field\">\n                    <label>Company <span class=\"tta-required\">*<\/span><\/label>\n                    <input type=\"text\" name=\"company\" required autocomplete=\"organization\">\n                <\/div>\n                                <div class=\"tta-field\">\n                    <label>Job title<\/label>\n                    <input type=\"text\" name=\"job_title\" autocomplete=\"organization-title\">\n                <\/div>\n                            <\/div>\n\n                        <div class=\"tta-row\">\n                <div class=\"tta-field\">\n                    <label>Phone (optional)<\/label>\n                    <input type=\"tel\" name=\"phone\" autocomplete=\"tel\">\n                <\/div>\n            <\/div>\n            \n            <div class=\"tta-row\">\n                <label class=\"tta-consent\">\n                    <input type=\"checkbox\" name=\"consent_marketing\" value=\"1\">\n                    <span>I agree to receive occasional TeepTrak updates (unsubscribe anytime).<\/span>\n                <\/label>\n            <\/div>\n\n            <div class=\"tta-row\">\n                <button type=\"submit\" class=\"tta-submit\">\n                    <span class=\"tta-submit-text\">Download Calculator<\/span>\n                    <span class=\"tta-submit-loading\" style=\"display:none;\">Processing\u2026<\/span>\n                <\/button>\n            <\/div>\n\n            <div class=\"tta-legal\">\n                By submitting, you agree to our privacy policy. We use your email only to follow up on this download.            <\/div>\n\n            <div class=\"tta-message\" style=\"display:none;\"><\/div>\n        <\/form>\n    <\/div>\n    <\/div>\n<h2>Lean Six Sigma Certifications: White, Yellow, Green, Black, Master Black Belt<\/h2>\n<p>The US Lean Six Sigma certification ecosystem has a five-tier structure that roughly maps to project complexity and organizational responsibility:<\/p>\n<p><strong>White Belt<\/strong> \u2014 Basic awareness. Typically a one-day orientation for all plant employees to establish shared vocabulary and philosophy. White Belts don&#8217;t lead projects; they participate as team members.<\/p>\n<p><strong>Yellow Belt<\/strong> \u2014 Junior practitioner. Two to five days of training covering Lean tools and basic DMAIC. Yellow Belts can lead small, local improvement projects and support larger projects as subject-matter experts.<\/p>\n<p><strong>Green Belt<\/strong> \u2014 Project leader. Two to four weeks of training (often spread over several months) covering the full DMAIC framework, statistical tools (hypothesis testing, regression, DOE), and project management. Green Belts lead most of the improvement projects in a mature Lean Six Sigma organization. Certification is typically issued after completing 1-2 successful projects.<\/p>\n<p><strong>Black Belt<\/strong> \u2014 Senior project leader. Four to six weeks of training plus 2-4 completed Black Belt projects. Black Belts handle cross-functional, strategic-impact projects and mentor Green Belts. In most US organizations, Black Belts are full-time continuous improvement professionals rather than operations staff who lead projects part-time.<\/p>\n<p><strong>Master Black Belt<\/strong> \u2014 Program-level leader. Typically reserved for continuous improvement directors or VPs who define the organization&#8217;s overall Lean Six Sigma strategy, set certification standards, and coach the Black Belt community.<\/p>\n<p>Certification providers vary widely in rigor. ASQ (American Society for Quality) is the most widely recognized US certification body; IASSC (International Association for Six Sigma Certification) is widely recognized as a vendor-neutral alternative. Be cautious of certification programs that offer Black Belt certification after a few online courses \u2014 these rarely hold up in practice and can actively damage a program&#8217;s credibility.<\/p>\n<h2>Why Lean Six Sigma Programs Fail in US Plants (and How to Avoid It)<\/h2>\n<p>Three failure modes account for the majority of Lean Six Sigma programs that fade out after two to three years in US plants:<\/p>\n<p><strong>Failure Mode 1: No measurable baseline.<\/strong> The program launches with enthusiasm, projects are selected, teams are formed \u2014 but nobody ever built the data infrastructure that tells whether the improvements are sticking. Three years in, the CFO asks &#8220;what has the program returned?&#8221; and nobody can answer. Budget gets cut, the program fades. The prevention: real-time OEE monitoring installed before the first project starts, so every project has a measurable before and after.<\/p>\n<p><strong>Failure Mode 2: Black Belt isolation.<\/strong> The Black Belts are treated as a separate team, physically and organizationally isolated from operations. They run projects in a dedicated CI war room; operators never see them as part of the plant&#8217;s real work. After a year, operations starts viewing CI as a compliance obligation rather than a value-creating partner. The prevention: embed Black Belts in operations, let them report to plant managers rather than a separate CI director, and ensure that every Black Belt project involves operators as active team members from day one.<\/p>\n<p><strong>Failure Mode 3: Tool fixation without philosophy.<\/strong> The program adopts the tools \u2014 VSM, 5S, SMED, DMAIC \u2014 without internalizing the underlying respect-for-people philosophy. Tools become checkboxes; the Sustain phase fails because operators were treated as subjects of improvement rather than agents of it. The prevention: explicitly teach the philosophy (Toyota Production System principles, respect for people, gemba walks) alongside the tools, and model it at the leadership level.<\/p>\n<div style=\"background:#fff5f5;border:2px dashed #EB352C;border-radius:8px;padding:28px;margin:32px 0;text-align:center;\">\n<div style=\"font-size:18px;font-weight:bold;color:#232120;margin-bottom:8px;\">Free Download \u2014 MES Buyer&#8217;s Checklist (42 questions)<\/div>\n<div style=\"font-size:14px;color:#555;margin-bottom:20px;\">The vendor-neutral checklist used by BCG, McKinsey and Bain consultants to evaluate MES\/OEE systems with their US manufacturing clients.<\/div>\n    <div class=\"teeptrak-asset-container tta-style-default\">\n                    <h3 class=\"tta-title\">Free Download<\/h3>\n                            <p class=\"tta-subtitle\">Instant download. No email confirmation needed.<\/p>\n        \n        <form id=\"tta-form-69ea263790ca8\" class=\"teeptrak-asset-form\" data-asset-id=\"mes-checklist\">\n            <div style=\"position:absolute;left:-9999px;top:-9999px;width:1px;height:1px;overflow:hidden;\" aria-hidden=\"true\"><input type=\"text\" name=\"website_url\" tabindex=\"-1\" autocomplete=\"off\"><input type=\"text\" name=\"fax_number\" tabindex=\"-1\" autocomplete=\"off\"><\/div>\n            <input type=\"hidden\" name=\"asset_id\" value=\"mes-checklist\">\n            <input type=\"hidden\" name=\"asset_label\" value=\"MES Buyer&#039;s Checklist\">\n            <input type=\"hidden\" name=\"pdf_url_en\" value=\"https:\/\/teeptrak.com\/wp-content\/uploads\/2026\/04\/teeptrak-mes-buyers-checklist-en.xlsx\">\n            <input type=\"hidden\" name=\"pdf_url_fr\" value=\"\">\n            <input type=\"hidden\" name=\"pdf_url_cn\" value=\"\">\n            <input type=\"hidden\" name=\"pdf_url_de\" value=\"\">\n            <input type=\"hidden\" name=\"pdf_url_es\" value=\"\">\n            <input type=\"hidden\" name=\"pdf_url_nl\" value=\"\">\n            <input type=\"hidden\" name=\"page_url\" value=\"https:\/\/teeptrak.com\/en\/lean-manufacturing-six-sigma-2026-guide\/\">\n\n            <div class=\"tta-row tta-row-half\">\n                <div class=\"tta-field\">\n                    <label>First name <span class=\"tta-required\">*<\/span><\/label>\n                    <input type=\"text\" name=\"first_name\" required autocomplete=\"given-name\">\n                <\/div>\n                <div class=\"tta-field\">\n                    <label>Last name <span class=\"tta-required\">*<\/span><\/label>\n                    <input type=\"text\" name=\"last_name\" required autocomplete=\"family-name\">\n                <\/div>\n            <\/div>\n\n            <div class=\"tta-row\">\n                <div class=\"tta-field\">\n                    <label>Business email <span class=\"tta-required\">*<\/span><\/label>\n                    <input type=\"email\" name=\"email\" required autocomplete=\"email\">\n                <\/div>\n            <\/div>\n\n            <div class=\"tta-row tta-row-half\">\n                <div class=\"tta-field\">\n                    <label>Company <span class=\"tta-required\">*<\/span><\/label>\n                    <input type=\"text\" name=\"company\" required autocomplete=\"organization\">\n                <\/div>\n                                <div class=\"tta-field\">\n                    <label>Job title<\/label>\n                    <input type=\"text\" name=\"job_title\" autocomplete=\"organization-title\">\n                <\/div>\n                            <\/div>\n\n                        <div class=\"tta-row\">\n                <div class=\"tta-field\">\n                    <label>Phone (optional)<\/label>\n                    <input type=\"tel\" name=\"phone\" autocomplete=\"tel\">\n                <\/div>\n            <\/div>\n            \n            <div class=\"tta-row\">\n                <label class=\"tta-consent\">\n                    <input type=\"checkbox\" name=\"consent_marketing\" value=\"1\">\n                    <span>I agree to receive occasional TeepTrak updates (unsubscribe anytime).<\/span>\n                <\/label>\n            <\/div>\n\n            <div class=\"tta-row\">\n                <button type=\"submit\" class=\"tta-submit\">\n                    <span class=\"tta-submit-text\">Get the Checklist<\/span>\n                    <span class=\"tta-submit-loading\" style=\"display:none;\">Processing\u2026<\/span>\n                <\/button>\n            <\/div>\n\n            <div class=\"tta-legal\">\n                By submitting, you agree to our privacy policy. We use your email only to follow up on this download.            <\/div>\n\n            <div class=\"tta-message\" style=\"display:none;\"><\/div>\n        <\/form>\n    <\/div>\n    <\/div>\n<h2>What US Plant Managers Should Do in 2026<\/h2>\n<p>If you are a US plant manager evaluating whether to launch, restart, or accelerate a Lean Six Sigma program, three priorities matter most in 2026:<\/p>\n<p>First, build the measurement infrastructure before launching the improvement program. Real-time OEE monitoring with external-sensor IIoT (such as TeepTrak&#8217;s PerfTrak, installed in 1-2 weeks on any equipment vintage) produces the baseline data that every DMAIC project needs. Without it, your first six months will be lost to baseline data collection; with it, your first project can be closed in eight weeks with defensible ROI numbers.<\/p>\n<p>Second, invest in Black Belt development but keep them embedded. Two to three certified Black Belts per plant is the typical ratio for a plant with 200-500 employees. They should report to the plant manager, not a separate corporate CI function, and they should spend at least 50% of their time on the production floor.<\/p>\n<p>Third, align the program with actual business priorities. The Lean Six Sigma programs that sustain are the ones that produce measurable impact on the three or four metrics that the plant leadership already cares about: OEE, first-pass yield, on-time delivery, inventory turns. Programs that produce a different set of metrics \u2014 number of projects completed, Belts certified, savings claimed \u2014 tend to fade regardless of how much effort goes in.<\/p>\n<p>External references: <a href=\"https:\/\/en.wikipedia.org\/wiki\/Lean_manufacturing\" target=\"_blank\" rel=\"noopener\">Lean Manufacturing \u2014 Wikipedia<\/a> \u00b7 <a href=\"https:\/\/en.wikipedia.org\/wiki\/Six_Sigma\" target=\"_blank\" rel=\"noopener\">Six Sigma \u2014 Wikipedia<\/a> \u00b7 <a href=\"https:\/\/asq.org\/quality-resources\/six-sigma\" target=\"_blank\" rel=\"noopener\">ASQ Six Sigma Resources<\/a> \u00b7 <a href=\"https:\/\/iassc.org\" target=\"_blank\" rel=\"noopener\">IASSC Certification<\/a><\/p>\n<p>Related TeepTrak reading: <a href=\"https:\/\/teeptrak.com\/en\/5s-methodology-lean-manufacturing-us\/\">5S methodology for US plant floors<\/a> \u00b7 <a href=\"https:\/\/teeptrak.com\/en\/lean-manufacturing-principles-deployment-us\/\">Lean Manufacturing principles and deployment in US plants<\/a> \u00b7 <a href=\"https:\/\/teeptrak.com\/en\/strategy-consultants-lightweight-oee-vs-mes\/\">Why strategy consultants recommend lightweight OEE over MES<\/a><\/p>\n<p style=\"text-align:center;margin-top:40px;background:#fff5f5;border:2px solid #EB352C;border-radius:8px;padding:32px;\">\n<strong style=\"font-size:20px;display:block;margin-bottom:8px;color:#232120;\">Running a US Plant? Let&#8217;s Talk.<\/strong><br \/>\n<span style=\"display:block;margin-bottom:20px;color:#555;\">TeepTrak&#8217;s US team is based in Chicago. Free 48-hour POC on any plant floor \u2014 no commitment, measurable OEE baseline by day 2.<\/span><br \/>\n<a href=\"https:\/\/teeptrak.com\/en\/request-a-demo\/\" style=\"background-color:#EB352C;color:#ffffff;padding:14px 28px;border-radius:4px;text-decoration:none;font-weight:bold;font-size:15px;\">Book a 48h POC<\/a>\n<\/p>\n<p><script type=\"application\/ld+json\">{\"@context\":\"https:\/\/schema.org\",\"@type\":\"BlogPosting\",\"headline\":\"Lean Manufacturing and Six Sigma: The 2026 Guide for US Plant Managers\",\"description\":\"The definitive 2026 guide to Lean Manufacturing and Six Sigma for US plant managers.\",\"author\":{\"@type\":\"Organization\",\"name\":\"TeepTrak\"},\"publisher\":{\"@type\":\"Organization\",\"name\":\"TeepTrak\"},\"datePublished\":\"2026-04-23\",\"inLanguage\":\"en-US\"}<\/script><br \/>\n[\/et_pb_text][\/et_pb_column][\/et_pb_row][\/et_pb_section]<\/p>\n","protected":false},"excerpt":{"rendered":"<p>[et_pb_section fb_built=&#8221;1&#8243; _builder_version=&#8221;4.27&#8243;][et_pb_row][et_pb_column type=&#8221;4_4&#8243;][et_pb_text] Lean Manufacturing and Six Sigma: The 2026 Guide for US Plant Managers Lean Manufacturing and Six Sigma have been the dominant operational improvement frameworks in US manufacturing for three decades. The Toyota Production System that gave birth to Lean in the 1950s; the Motorola quality discipline that gave birth to Six [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":89549,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_et_pb_use_builder":"","_et_pb_old_content":"","_et_gb_content_width":"","ai_seo_title":"Lean Manufacturing & Six Sigma: 2026 US Guide | TeepTrak","ai_meta_description":"The definitive 2026 guide to Lean Manufacturing and Six Sigma for US plant managers. Principles, tools, certifications and how to deploy data infrastructure.","ai_focus_keyword":"lean manufacturing 6 sigma","footnotes":""},"categories":[101],"tags":[],"class_list":["post-89555","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-industrial-performance"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.4 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Lean Manufacturing &amp; Six Sigma: 2026 US Guide | TeepTrak<\/title>\n<meta name=\"description\" content=\"The definitive 2026 guide to Lean Manufacturing and Six Sigma for US plant managers. Principles, tools, certifications and how to deploy data infrastructure.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/teeptrak.com\/en\/lean-manufacturing-six-sigma-2026-guide\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Lean Manufacturing &amp; Six Sigma: 2026 US Guide | TeepTrak\" \/>\n<meta property=\"og:description\" content=\"The definitive 2026 guide to Lean Manufacturing and Six Sigma for US plant managers. Principles, tools, certifications and how to deploy data infrastructure.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/teeptrak.com\/en\/lean-manufacturing-six-sigma-2026-guide\/\" \/>\n<meta property=\"og:site_name\" content=\"TEEPTRAK - Connect to your industrial potential\" \/>\n<meta property=\"article:published_time\" content=\"2026-04-23T10:11:55+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-04-23T10:11:56+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/teeptrak.com\/wp-content\/uploads\/2026\/04\/lean-manufacturing-six-sigma-2026-guide.jpeg\" \/>\n\t<meta property=\"og:image:width\" content=\"1150\" \/>\n\t<meta property=\"og:image:height\" content=\"657\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"\u00c9quipe TEEPTRAK\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"\u00c9quipe TEEPTRAK\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"12 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/teeptrak.com\\\/en\\\/lean-manufacturing-six-sigma-2026-guide\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/teeptrak.com\\\/en\\\/lean-manufacturing-six-sigma-2026-guide\\\/\"},\"author\":{\"name\":\"\u00c9quipe TEEPTRAK\",\"@id\":\"https:\\\/\\\/teeptrak.com\\\/en\\\/#\\\/schema\\\/person\\\/e0b65287bf97c0856b9e70813a4b5aff\"},\"headline\":\"Lean Manufacturing and Six Sigma: The 2026 Guide for US Plant Managers\",\"datePublished\":\"2026-04-23T10:11:55+00:00\",\"dateModified\":\"2026-04-23T10:11:56+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/teeptrak.com\\\/en\\\/lean-manufacturing-six-sigma-2026-guide\\\/\"},\"wordCount\":2330,\"publisher\":{\"@id\":\"https:\\\/\\\/teeptrak.com\\\/en\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/teeptrak.com\\\/en\\\/lean-manufacturing-six-sigma-2026-guide\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/teeptrak.com\\\/wp-content\\\/uploads\\\/2026\\\/04\\\/lean-manufacturing-six-sigma-2026-guide.jpeg\",\"articleSection\":[\"Industrial Performance\"],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/teeptrak.com\\\/en\\\/lean-manufacturing-six-sigma-2026-guide\\\/\",\"url\":\"https:\\\/\\\/teeptrak.com\\\/en\\\/lean-manufacturing-six-sigma-2026-guide\\\/\",\"name\":\"Lean Manufacturing & Six Sigma: 2026 US Guide | TeepTrak\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/teeptrak.com\\\/en\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/teeptrak.com\\\/en\\\/lean-manufacturing-six-sigma-2026-guide\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/teeptrak.com\\\/en\\\/lean-manufacturing-six-sigma-2026-guide\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/teeptrak.com\\\/wp-content\\\/uploads\\\/2026\\\/04\\\/lean-manufacturing-six-sigma-2026-guide.jpeg\",\"datePublished\":\"2026-04-23T10:11:55+00:00\",\"dateModified\":\"2026-04-23T10:11:56+00:00\",\"description\":\"The definitive 2026 guide to Lean Manufacturing and Six Sigma for US plant managers. Principles, tools, certifications and how to deploy data infrastructure.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/teeptrak.com\\\/en\\\/lean-manufacturing-six-sigma-2026-guide\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/teeptrak.com\\\/en\\\/lean-manufacturing-six-sigma-2026-guide\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/teeptrak.com\\\/en\\\/lean-manufacturing-six-sigma-2026-guide\\\/#primaryimage\",\"url\":\"https:\\\/\\\/teeptrak.com\\\/wp-content\\\/uploads\\\/2026\\\/04\\\/lean-manufacturing-six-sigma-2026-guide.jpeg\",\"contentUrl\":\"https:\\\/\\\/teeptrak.com\\\/wp-content\\\/uploads\\\/2026\\\/04\\\/lean-manufacturing-six-sigma-2026-guide.jpeg\",\"width\":1150,\"height\":657,\"caption\":\"lean manufacturing six sigma 2026 guide - TeepTrak\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/teeptrak.com\\\/en\\\/lean-manufacturing-six-sigma-2026-guide\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Accueil\",\"item\":\"https:\\\/\\\/teeptrak.com\\\/en\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Lean Manufacturing and Six Sigma: The 2026 Guide for US Plant Managers\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/teeptrak.com\\\/en\\\/#website\",\"url\":\"https:\\\/\\\/teeptrak.com\\\/en\\\/\",\"name\":\"TEEPTRAK\",\"description\":\"TEEPTRAK official website - OEE\",\"publisher\":{\"@id\":\"https:\\\/\\\/teeptrak.com\\\/en\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/teeptrak.com\\\/en\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/teeptrak.com\\\/en\\\/#organization\",\"name\":\"TEEPTRAK\",\"url\":\"https:\\\/\\\/teeptrak.com\\\/en\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/teeptrak.com\\\/en\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/teeptrak.com\\\/wp-content\\\/uploads\\\/2023\\\/05\\\/cropped-Capture-decran-2023-05-04-112832.png\",\"contentUrl\":\"https:\\\/\\\/teeptrak.com\\\/wp-content\\\/uploads\\\/2023\\\/05\\\/cropped-Capture-decran-2023-05-04-112832.png\",\"width\":512,\"height\":512,\"caption\":\"TEEPTRAK\"},\"image\":{\"@id\":\"https:\\\/\\\/teeptrak.com\\\/en\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.linkedin.com\\\/company\\\/teeptrak\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/teeptrakinternational\\\/\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/teeptrak.com\\\/en\\\/#\\\/schema\\\/person\\\/e0b65287bf97c0856b9e70813a4b5aff\",\"name\":\"\u00c9quipe TEEPTRAK\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/c15a5bed2b22793c34b357757ed5a12321e733893599e115e40c0263ef4877f7?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/c15a5bed2b22793c34b357757ed5a12321e733893599e115e40c0263ef4877f7?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/c15a5bed2b22793c34b357757ed5a12321e733893599e115e40c0263ef4877f7?s=96&d=mm&r=g\",\"caption\":\"\u00c9quipe TEEPTRAK\"},\"sameAs\":[\"https:\\\/\\\/teeptrak.com\"],\"url\":\"https:\\\/\\\/teeptrak.com\\\/en\\\/author\\\/auriane\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Lean Manufacturing & Six Sigma: 2026 US Guide | TeepTrak","description":"The definitive 2026 guide to Lean Manufacturing and Six Sigma for US plant managers. Principles, tools, certifications and how to deploy data infrastructure.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/teeptrak.com\/en\/lean-manufacturing-six-sigma-2026-guide\/","og_locale":"en_US","og_type":"article","og_title":"Lean Manufacturing & Six Sigma: 2026 US Guide | TeepTrak","og_description":"The definitive 2026 guide to Lean Manufacturing and Six Sigma for US plant managers. Principles, tools, certifications and how to deploy data infrastructure.","og_url":"https:\/\/teeptrak.com\/en\/lean-manufacturing-six-sigma-2026-guide\/","og_site_name":"TEEPTRAK - Connect to your industrial potential","article_published_time":"2026-04-23T10:11:55+00:00","article_modified_time":"2026-04-23T10:11:56+00:00","og_image":[{"width":1150,"height":657,"url":"https:\/\/teeptrak.com\/wp-content\/uploads\/2026\/04\/lean-manufacturing-six-sigma-2026-guide.jpeg","type":"image\/jpeg"}],"author":"\u00c9quipe TEEPTRAK","twitter_card":"summary_large_image","twitter_misc":{"Written by":"\u00c9quipe TEEPTRAK","Est. reading time":"12 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/teeptrak.com\/en\/lean-manufacturing-six-sigma-2026-guide\/#article","isPartOf":{"@id":"https:\/\/teeptrak.com\/en\/lean-manufacturing-six-sigma-2026-guide\/"},"author":{"name":"\u00c9quipe TEEPTRAK","@id":"https:\/\/teeptrak.com\/en\/#\/schema\/person\/e0b65287bf97c0856b9e70813a4b5aff"},"headline":"Lean Manufacturing and Six Sigma: The 2026 Guide for US Plant Managers","datePublished":"2026-04-23T10:11:55+00:00","dateModified":"2026-04-23T10:11:56+00:00","mainEntityOfPage":{"@id":"https:\/\/teeptrak.com\/en\/lean-manufacturing-six-sigma-2026-guide\/"},"wordCount":2330,"publisher":{"@id":"https:\/\/teeptrak.com\/en\/#organization"},"image":{"@id":"https:\/\/teeptrak.com\/en\/lean-manufacturing-six-sigma-2026-guide\/#primaryimage"},"thumbnailUrl":"https:\/\/teeptrak.com\/wp-content\/uploads\/2026\/04\/lean-manufacturing-six-sigma-2026-guide.jpeg","articleSection":["Industrial Performance"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/teeptrak.com\/en\/lean-manufacturing-six-sigma-2026-guide\/","url":"https:\/\/teeptrak.com\/en\/lean-manufacturing-six-sigma-2026-guide\/","name":"Lean Manufacturing & Six Sigma: 2026 US Guide | TeepTrak","isPartOf":{"@id":"https:\/\/teeptrak.com\/en\/#website"},"primaryImageOfPage":{"@id":"https:\/\/teeptrak.com\/en\/lean-manufacturing-six-sigma-2026-guide\/#primaryimage"},"image":{"@id":"https:\/\/teeptrak.com\/en\/lean-manufacturing-six-sigma-2026-guide\/#primaryimage"},"thumbnailUrl":"https:\/\/teeptrak.com\/wp-content\/uploads\/2026\/04\/lean-manufacturing-six-sigma-2026-guide.jpeg","datePublished":"2026-04-23T10:11:55+00:00","dateModified":"2026-04-23T10:11:56+00:00","description":"The definitive 2026 guide to Lean Manufacturing and Six Sigma for US plant managers. Principles, tools, certifications and how to deploy data infrastructure.","breadcrumb":{"@id":"https:\/\/teeptrak.com\/en\/lean-manufacturing-six-sigma-2026-guide\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/teeptrak.com\/en\/lean-manufacturing-six-sigma-2026-guide\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/teeptrak.com\/en\/lean-manufacturing-six-sigma-2026-guide\/#primaryimage","url":"https:\/\/teeptrak.com\/wp-content\/uploads\/2026\/04\/lean-manufacturing-six-sigma-2026-guide.jpeg","contentUrl":"https:\/\/teeptrak.com\/wp-content\/uploads\/2026\/04\/lean-manufacturing-six-sigma-2026-guide.jpeg","width":1150,"height":657,"caption":"lean manufacturing six sigma 2026 guide - TeepTrak"},{"@type":"BreadcrumbList","@id":"https:\/\/teeptrak.com\/en\/lean-manufacturing-six-sigma-2026-guide\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Accueil","item":"https:\/\/teeptrak.com\/en\/"},{"@type":"ListItem","position":2,"name":"Lean Manufacturing and Six Sigma: The 2026 Guide for US Plant Managers"}]},{"@type":"WebSite","@id":"https:\/\/teeptrak.com\/en\/#website","url":"https:\/\/teeptrak.com\/en\/","name":"TEEPTRAK","description":"TEEPTRAK official website - OEE","publisher":{"@id":"https:\/\/teeptrak.com\/en\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/teeptrak.com\/en\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/teeptrak.com\/en\/#organization","name":"TEEPTRAK","url":"https:\/\/teeptrak.com\/en\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/teeptrak.com\/en\/#\/schema\/logo\/image\/","url":"https:\/\/teeptrak.com\/wp-content\/uploads\/2023\/05\/cropped-Capture-decran-2023-05-04-112832.png","contentUrl":"https:\/\/teeptrak.com\/wp-content\/uploads\/2023\/05\/cropped-Capture-decran-2023-05-04-112832.png","width":512,"height":512,"caption":"TEEPTRAK"},"image":{"@id":"https:\/\/teeptrak.com\/en\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.linkedin.com\/company\/teeptrak\/","https:\/\/www.linkedin.com\/company\/teeptrakinternational\/"]},{"@type":"Person","@id":"https:\/\/teeptrak.com\/en\/#\/schema\/person\/e0b65287bf97c0856b9e70813a4b5aff","name":"\u00c9quipe TEEPTRAK","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/secure.gravatar.com\/avatar\/c15a5bed2b22793c34b357757ed5a12321e733893599e115e40c0263ef4877f7?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/c15a5bed2b22793c34b357757ed5a12321e733893599e115e40c0263ef4877f7?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/c15a5bed2b22793c34b357757ed5a12321e733893599e115e40c0263ef4877f7?s=96&d=mm&r=g","caption":"\u00c9quipe TEEPTRAK"},"sameAs":["https:\/\/teeptrak.com"],"url":"https:\/\/teeptrak.com\/en\/author\/auriane\/"}]}},"_links":{"self":[{"href":"https:\/\/teeptrak.com\/en\/wp-json\/wp\/v2\/posts\/89555","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/teeptrak.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/teeptrak.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/teeptrak.com\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/teeptrak.com\/en\/wp-json\/wp\/v2\/comments?post=89555"}],"version-history":[{"count":1,"href":"https:\/\/teeptrak.com\/en\/wp-json\/wp\/v2\/posts\/89555\/revisions"}],"predecessor-version":[{"id":89556,"href":"https:\/\/teeptrak.com\/en\/wp-json\/wp\/v2\/posts\/89555\/revisions\/89556"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/teeptrak.com\/en\/wp-json\/wp\/v2\/media\/89549"}],"wp:attachment":[{"href":"https:\/\/teeptrak.com\/en\/wp-json\/wp\/v2\/media?parent=89555"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/teeptrak.com\/en\/wp-json\/wp\/v2\/categories?post=89555"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/teeptrak.com\/en\/wp-json\/wp\/v2\/tags?post=89555"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}