{"id":88712,"date":"2026-04-20T09:24:26","date_gmt":"2026-04-20T09:24:26","guid":{"rendered":"https:\/\/teeptrak.com\/oee-calculation-mistakes-inflation\/"},"modified":"2026-04-20T09:24:29","modified_gmt":"2026-04-20T09:24:29","slug":"oee-calculation-mistakes-inflation","status":"publish","type":"post","link":"https:\/\/teeptrak.com\/en\/oee-calculation-mistakes-inflation\/","title":{"rendered":"OEE Calculation Mistakes That Inflate Your Numbers by 10-18 Points"},"content":{"rendered":"<p>[et_pb_section fb_built=&#8221;1&#8243; _builder_version=&#8221;4.27&#8243;][et_pb_row][et_pb_column type=&#8221;4_4&#8243;][et_pb_text]<\/p>\n<h1>OEE Calculation Mistakes That Inflate Your Numbers by 10-18 Points<\/h1>\n<p>Most plants reporting OEE of 70-80% are actually measuring 55-62% when calculation is done to standard definitions. The 10-18 point inflation is not intentional dishonesty; it is the cumulative effect of five specific calculation mistakes that have crept into reporting over years or decades. Each mistake individually sounds minor and defensible. Combined, they produce a systematic upward bias that misleads leadership, corrupts benchmarking, and misdirects improvement investment. This article catalogs the five most common mistakes with specific examples, quantifies their typical impact, and walks through the remediation path for each.<\/p>\n<p>The value of identifying these mistakes is not to blame the teams who made them \u2014 they usually inherited the calculation method from predecessors and never had reason to question it. The value is that correcting the mistakes produces a realistic baseline from which actual improvement becomes possible. Plants that correct their OEE calculation typically see reported OEE drop 10-18 points in the first 30 days, then rebuild real improvements from the honest baseline over the subsequent 6-12 months. The honest baseline produces 2-3x more actual improvement than the inflated baseline because it targets real problems.<\/p>\n<h2>Mistake 1: Treating changeover time as planned (not counted against OEE)<\/h2>\n<p><strong>Typical inflation: 4-8 OEE points.<\/strong> The standard MESA definition counts changeover as unplanned stop time within Availability. Many plants have drifted into treating it as planned downtime, excluded from OEE calculation. The rationale often sounds reasonable : &#8220;we know we need to change over, it&#8217;s planned production activity, not a loss.&#8221; The math treats it as a loss because it reduces actual running time against scheduled production time, which is what OEE measures.<\/p>\n<p>How to diagnose: ask whoever produces the OEE report how the denominator of Availability is calculated. If the answer includes &#8220;minus scheduled changeover time,&#8221; you have this mistake. How to remediate: switch to the standard definition (Planned Production Time = scheduled time minus breaks\/meetings\/no-demand, but not minus changeovers), and separately report changeover time as a loss category within Availability. Most plants see Availability drop 5-10 points when this is corrected.<\/p>\n<h2>Mistake 2: Using historical average cycle time as Ideal Cycle Time<\/h2>\n<p><strong>Typical inflation: 3-7 OEE points.<\/strong> Performance = (Ideal Cycle Time \u00d7 Total Count) \/ Run Time. The correct Ideal Cycle Time is the nameplate speed \u2014 what the equipment was designed to achieve at optimal conditions. The mistake is using the historical average cycle time as the denominator, which makes Performance appear close to 100% because it compares actual to actual.<\/p>\n<p>How to diagnose: check your reported Performance numbers. If Performance is consistently above 95% across different product types and the line has known speed losses during routine operation, the Ideal Cycle Time definition is probably wrong. The remediation is to establish Ideal Cycle Time from engineering specifications or from the fastest demonstrated cycle time observed during pilot runs. This is a one-time engineering review, not an ongoing adjustment.<\/p>\n<p>Plants fixing this mistake typically see Performance drop 8-15 points. The drop is real measurement, not performance change. The line runs at the same speed it did yesterday; the number is now honest instead of inflated.<\/p>\n<h2>Mistake 3: Missing micro-stops under 5 minutes<\/h2>\n<p><strong>Typical inflation: 2-5 OEE points, concentrated in Availability.<\/strong> Short stops (2-5 minutes for brief adjustments, 1-3 minutes for small fixes) are individually minor but cumulatively substantial. A line averaging 12 micro-stops per shift at 3 minutes each loses 36 minutes per shift \u2014 roughly 7.5% Availability impact on a 480-minute shift. Most plants do not capture these because operator manual logs have a threshold (&#8220;only log stops over 5 minutes&#8221;) and PLC event capture has filters that miss them.<\/p>\n<p>How to diagnose: compare your logged stop count per shift to what operators report when directly asked. If logged stops are under 5 per shift but operators describe a dozen or more small issues during the shift, the logging is missing micro-stops. The remediation depends on measurement infrastructure: manual-log plants need operator process changes (tablet-based quick-logging with preset reason codes); MES-captured plants need to review their event filter settings; direct-sensor IoT plants typically capture micro-stops accurately already.<\/p>\n<h2>Mistake 4: Counting reworked parts as Good Count<\/h2>\n<p><strong>Typical inflation: 1-3 OEE points.<\/strong> Quality = Good Count \/ Total Count. Good Count should include only parts that pass first-time without rework. Many plants count reworked parts as good because they ultimately ship to customers. This is reasonable commercially but inflates OEE because it hides the quality loss that rework represents.<\/p>\n<p>How to diagnose: check whether your Quality denominator is consistent with Good Count measured before rework. If rework is common and Quality reports are consistently above 98%, you may have this mistake. The remediation is to separate Good Count (first-pass good) from Shipped Count (including rework). OEE Quality uses Good Count; commercial reporting uses Shipped Count. Both numbers are useful for different purposes.<\/p>\n<h2>Mistake 5: Inconsistent planned-stop definitions across shifts or lines<\/h2>\n<p><strong>Typical inflation: variable, 2-5 OEE points of cross-line variance.<\/strong> Different shifts or lines define planned stops differently \u2014 one shift treats preventive maintenance as planned, another as scheduled time with unplanned stop. Weekend overtime shifts sometimes use different break definitions than weekday shifts. These inconsistencies make cross-line comparisons unreliable and tend to inflate the reporting of whichever line has more generous planned-stop definitions.<\/p>\n<p>How to diagnose: request the detailed calculation methodology from each shift and line, and look for discrepancies. Common issues are preventive maintenance treatment, break time duration, quality-hold time treatment, startup warm-up time treatment. The remediation is to publish a standard definition, align all lines and shifts to it, and audit monthly for drift.<\/p>\n<div style=\"background:#fff5f5;border:2px dashed #EB352C;border-radius:8px;padding:28px;margin:32px 0;text-align:center;\">\n<div style=\"font-size:18px;font-weight:bold;color:#232120;margin-bottom:8px;\">Free Download \u2014 OEE Calculator Excel (5 tabs)<\/div>\n<div style=\"font-size:14px;color:#555;margin-bottom:20px;\">Pre-built with standard MESA definitions: daily OEE log, mistake-audit checklist, what-if calculator showing impact of correction, benchmark comparison tab.<\/div>\n    <div class=\"teeptrak-asset-container tta-style-default\">\n                    <h3 class=\"tta-title\">Download the free Excel calculator<\/h3>\n                            <p class=\"tta-subtitle\">Instant download. No email confirmation needed.<\/p>\n        \n        <form id=\"tta-form-69e71b463d28f\" class=\"teeptrak-asset-form\" data-asset-id=\"oee-calculator\">\n            <div style=\"position:absolute;left:-9999px;top:-9999px;width:1px;height:1px;overflow:hidden;\" aria-hidden=\"true\"><input type=\"text\" name=\"website_url\" tabindex=\"-1\" autocomplete=\"off\"><input type=\"text\" name=\"fax_number\" tabindex=\"-1\" autocomplete=\"off\"><\/div>\n            <input type=\"hidden\" name=\"asset_id\" value=\"oee-calculator\">\n            <input type=\"hidden\" name=\"asset_label\" value=\"OEE Calculator Excel\">\n            <input type=\"hidden\" name=\"pdf_url_en\" value=\"https:\/\/teeptrak.com\/wp-content\/uploads\/2026\/04\/teeptrak-oee-calculator.xlsx\">\n            <input type=\"hidden\" name=\"pdf_url_fr\" value=\"https:\/\/teeptrak.com\/wp-content\/uploads\/2026\/04\/teeptrak-calculateur-trs.xlsx\">\n            <input type=\"hidden\" name=\"pdf_url_cn\" value=\"https:\/\/teeptrak.com\/wp-content\/uploads\/2026\/04\/teeptrak-oee-jisuanqi.xlsx\">\n            <input type=\"hidden\" name=\"pdf_url_de\" value=\"\">\n            <input type=\"hidden\" name=\"pdf_url_es\" value=\"\">\n            <input type=\"hidden\" name=\"pdf_url_nl\" value=\"\">\n            <input type=\"hidden\" name=\"page_url\" value=\"https:\/\/teeptrak.com\/en\/oee-calculation-mistakes-inflation\/\">\n\n            <div class=\"tta-row tta-row-half\">\n                <div class=\"tta-field\">\n                    <label>First name <span class=\"tta-required\">*<\/span><\/label>\n                    <input type=\"text\" name=\"first_name\" required autocomplete=\"given-name\">\n                <\/div>\n                <div class=\"tta-field\">\n                    <label>Last name <span class=\"tta-required\">*<\/span><\/label>\n                    <input type=\"text\" name=\"last_name\" required autocomplete=\"family-name\">\n                <\/div>\n            <\/div>\n\n            <div class=\"tta-row\">\n                <div class=\"tta-field\">\n                    <label>Business email <span class=\"tta-required\">*<\/span><\/label>\n                    <input type=\"email\" name=\"email\" required autocomplete=\"email\">\n                <\/div>\n            <\/div>\n\n            <div class=\"tta-row tta-row-half\">\n                <div class=\"tta-field\">\n                    <label>Company <span class=\"tta-required\">*<\/span><\/label>\n                    <input type=\"text\" name=\"company\" required autocomplete=\"organization\">\n                <\/div>\n                                <div class=\"tta-field\">\n                    <label>Job title<\/label>\n                    <input type=\"text\" name=\"job_title\" autocomplete=\"organization-title\">\n                <\/div>\n                            <\/div>\n\n                        <div class=\"tta-row\">\n                <div class=\"tta-field\">\n                    <label>Phone (optional)<\/label>\n                    <input type=\"tel\" name=\"phone\" autocomplete=\"tel\">\n                <\/div>\n            <\/div>\n            \n            <div class=\"tta-row\">\n                <label class=\"tta-consent\">\n                    <input type=\"checkbox\" name=\"consent_marketing\" value=\"1\">\n                    <span>I agree to receive occasional TeepTrak updates (unsubscribe anytime).<\/span>\n                <\/label>\n            <\/div>\n\n            <div class=\"tta-row\">\n                <button type=\"submit\" class=\"tta-submit\">\n                    <span class=\"tta-submit-text\">Get the calculator<\/span>\n                    <span class=\"tta-submit-loading\" style=\"display:none;\">Processing\u2026<\/span>\n                <\/button>\n            <\/div>\n\n            <div class=\"tta-legal\">\n                By submitting, you agree to our privacy policy. We use your email only to follow up on this download.            <\/div>\n\n            <div class=\"tta-message\" style=\"display:none;\"><\/div>\n        <\/form>\n    <\/div>\n    <\/div>\n<h2>The combined effect \u2014 why 10-18 points is typical<\/h2>\n<p>Each mistake individually produces 1-8 points of inflation. When a plant has multiple mistakes simultaneously (the common case), the effects compound. Mistake 1 alone (+6 points) + Mistake 2 alone (+5 points) + Mistake 3 alone (+3 points) = +14 points cumulative. A plant reporting 74% OEE with these three mistakes is actually measuring 60% OEE. Adding Mistake 4 and Mistake 5 can push the gap to 16-18 points.<\/p>\n<p>The compounding effect explains the typical pattern observed in parallel-measurement POCs : plants reporting 70-80% OEE, when measured with direct-sensor IoT at standard definitions, consistently show 55-62% OEE. The 15-18 point gap is not measurement noise; it is the cumulative effect of the five standard mistakes.<\/p>\n<h2>The leadership conversation \u2014 how to handle the correction<\/h2>\n<p>Correcting OEE calculation typically produces a 10-18 point drop in reported numbers. How this is communicated matters for the program&#8217;s success. The wrong framing : &#8220;the line&#8217;s performance dropped 15 points.&#8221; The right framing : &#8220;our measurement was inflated by 15 points; the honest number is 60%, not 75%, and now we can identify real improvement opportunities we were previously hiding.&#8221;<\/p>\n<p>Leadership teams that accept the correction with intellectual honesty use it to re-launch improvement programs with realistic targets. Leadership teams that push back \u2014 demanding that reporting revert to the inflated method \u2014 typically find that their improvement investments continue producing disappointing results because the targets are misaligned with reality. The correction is the foundation for real improvement, not an inconvenience to be denied.<\/p>\n<h2>Running the audit on your plant<\/h2>\n<p>A systematic OEE calculation audit takes roughly 4 hours of engineering time and identifies most mistakes. Step 1: request the detailed calculation methodology document from whoever owns OEE reporting. Step 2: walk through each of the five mistakes above and check methodology for each. Step 3: for any mistake identified, estimate the impact using the typical ranges in this article. Step 4: validate the total with a 48-hour parallel-measurement POC on one line.<\/p>\n<p>The audit output is a prioritized list of corrections with expected OEE impact. Most plants implement corrections over 60-90 days to allow time for leadership communication and definition alignment across shifts and lines. By the end of 90 days, OEE reporting is based on standard definitions and honest measurement \u2014 the foundation from which real improvement programs produce durable results.<\/p>\n<p style=\"text-align:center;margin-top:40px;background:#fff5f5;border:2px solid #EB352C;border-radius:8px;padding:32px;\">\n<strong style=\"font-size:18px;display:block;margin-bottom:8px;\">Audit your OEE calculation in 48 hours \u2014 Free POC<\/strong><br \/>\n<span style=\"display:block;margin-bottom:20px;color:#555;\">Parallel direct-sensor measurement, mistake identification, specific remediation roadmap with expected impact per correction<\/span><br \/>\n<a href=\"https:\/\/teeptrak.com\/en\/request-a-demo\/\" style=\"background-color:#EB352C;color:#ffffff;padding:14px 28px;border-radius:4px;text-decoration:none;font-weight:bold;font-size:15px;\">Request a free TeepTrak POC<\/a>\n<\/p>\n<p>External references: <a href=\"https:\/\/en.wikipedia.org\/wiki\/Overall_equipment_effectiveness\" target=\"_blank\" rel=\"noopener\">Wikipedia: OEE<\/a> &middot; <a href=\"https:\/\/www.mesa.org\" target=\"_blank\" rel=\"noopener\">MESA International<\/a> &middot; <a href=\"https:\/\/www.nist.gov\" target=\"_blank\" rel=\"noopener\">NIST<\/a><\/p>\n<p>See also: <a href=\"https:\/\/teeptrak.com\/en\/how-to-calculate-oee-complete-guide\/\">How to Calculate OEE \u2014 Complete Formula Guide<\/a> &middot; <a href=\"https:\/\/teeptrak.com\/en\/world-class-oee-benchmark\/\">World-Class OEE Benchmark<\/a> &middot; <a href=\"https:\/\/teeptrak.com\/en\/oee-software\/\">OEE Software Overview<\/a><\/p>\n<p><script type=\"application\/ld+json\">{\"@context\":\"https:\/\/schema.org\",\"@type\":\"BlogPosting\",\"headline\":\"OEE Calculation Mistakes That Inflate Your Numbers by 10-18 Points\",\"description\":\"Five specific calculation mistakes that make reported OEE 10-18 points higher than reality. How to identify, fix, and what honest measurement reveals.\",\"author\":{\"@type\":\"Organization\",\"name\":\"TeepTrak\"},\"publisher\":{\"@type\":\"Organization\",\"name\":\"TeepTrak\"},\"datePublished\":\"2026-04-20\",\"inLanguage\":\"en-US\"}<\/script><br \/>\n[\/et_pb_text][\/et_pb_column][\/et_pb_row][\/et_pb_section]<\/p>\n","protected":false},"excerpt":{"rendered":"<p>[et_pb_section fb_built=&#8221;1&#8243; _builder_version=&#8221;4.27&#8243;][et_pb_row][et_pb_column type=&#8221;4_4&#8243;][et_pb_text] OEE Calculation Mistakes That Inflate Your Numbers by 10-18 Points Most plants reporting OEE of 70-80% are actually measuring 55-62% when calculation is done to standard definitions. The 10-18 point inflation is not intentional dishonesty; it is the cumulative effect of five specific calculation mistakes that have crept into reporting over [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":88706,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_et_pb_use_builder":"","_et_pb_old_content":"","_et_gb_content_width":"","ai_seo_title":"OEE Calculation Mistakes \u2014 18 Points Inflation | TeepTrak","ai_meta_description":"The five specific calculation mistakes that make reported OEE 10-18 points higher than reality. How to identify them, how to fix them, and what honest measurement reveals.","ai_focus_keyword":"OEE calculation mistakes","footnotes":""},"categories":[101],"tags":[],"class_list":["post-88712","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-industrial-performance"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.4 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>OEE Calculation Mistakes \u2014 18 Points Inflation | TeepTrak<\/title>\n<meta name=\"description\" content=\"The five specific calculation mistakes that make reported OEE 10-18 points higher than reality. How to identify them, how to fix them, and what honest measurement reveals.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/teeptrak.com\/en\/oee-calculation-mistakes-inflation\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"OEE Calculation Mistakes \u2014 18 Points Inflation | TeepTrak\" \/>\n<meta property=\"og:description\" content=\"The five specific calculation mistakes that make reported OEE 10-18 points higher than reality. How to identify them, how to fix them, and what honest measurement reveals.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/teeptrak.com\/en\/oee-calculation-mistakes-inflation\/\" \/>\n<meta property=\"og:site_name\" content=\"TEEPTRAK - Connect to your industrial potential\" \/>\n<meta property=\"article:published_time\" content=\"2026-04-20T09:24:26+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-04-20T09:24:29+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/teeptrak.com\/wp-content\/uploads\/2026\/04\/oee-calculation-mistakes-inflation.jpeg\" \/>\n\t<meta property=\"og:image:width\" content=\"1150\" \/>\n\t<meta property=\"og:image:height\" content=\"657\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"\u00c9quipe TEEPTRAK\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"\u00c9quipe TEEPTRAK\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"7 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/teeptrak.com\\\/en\\\/oee-calculation-mistakes-inflation\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/teeptrak.com\\\/en\\\/oee-calculation-mistakes-inflation\\\/\"},\"author\":{\"name\":\"\u00c9quipe TEEPTRAK\",\"@id\":\"https:\\\/\\\/teeptrak.com\\\/en\\\/#\\\/schema\\\/person\\\/e0b65287bf97c0856b9e70813a4b5aff\"},\"headline\":\"OEE Calculation Mistakes That Inflate Your Numbers by 10-18 Points\",\"datePublished\":\"2026-04-20T09:24:26+00:00\",\"dateModified\":\"2026-04-20T09:24:29+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/teeptrak.com\\\/en\\\/oee-calculation-mistakes-inflation\\\/\"},\"wordCount\":1448,\"publisher\":{\"@id\":\"https:\\\/\\\/teeptrak.com\\\/en\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/teeptrak.com\\\/en\\\/oee-calculation-mistakes-inflation\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/teeptrak.com\\\/wp-content\\\/uploads\\\/2026\\\/04\\\/oee-calculation-mistakes-inflation.jpeg\",\"articleSection\":[\"Industrial Performance\"],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/teeptrak.com\\\/en\\\/oee-calculation-mistakes-inflation\\\/\",\"url\":\"https:\\\/\\\/teeptrak.com\\\/en\\\/oee-calculation-mistakes-inflation\\\/\",\"name\":\"OEE Calculation Mistakes \u2014 18 Points Inflation | TeepTrak\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/teeptrak.com\\\/en\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/teeptrak.com\\\/en\\\/oee-calculation-mistakes-inflation\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/teeptrak.com\\\/en\\\/oee-calculation-mistakes-inflation\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/teeptrak.com\\\/wp-content\\\/uploads\\\/2026\\\/04\\\/oee-calculation-mistakes-inflation.jpeg\",\"datePublished\":\"2026-04-20T09:24:26+00:00\",\"dateModified\":\"2026-04-20T09:24:29+00:00\",\"description\":\"The five specific calculation mistakes that make reported OEE 10-18 points higher than reality. How to identify them, how to fix them, and what honest measurement reveals.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/teeptrak.com\\\/en\\\/oee-calculation-mistakes-inflation\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/teeptrak.com\\\/en\\\/oee-calculation-mistakes-inflation\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/teeptrak.com\\\/en\\\/oee-calculation-mistakes-inflation\\\/#primaryimage\",\"url\":\"https:\\\/\\\/teeptrak.com\\\/wp-content\\\/uploads\\\/2026\\\/04\\\/oee-calculation-mistakes-inflation.jpeg\",\"contentUrl\":\"https:\\\/\\\/teeptrak.com\\\/wp-content\\\/uploads\\\/2026\\\/04\\\/oee-calculation-mistakes-inflation.jpeg\",\"width\":1150,\"height\":657,\"caption\":\"oee calculation mistakes inflation - TeepTrak\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/teeptrak.com\\\/en\\\/oee-calculation-mistakes-inflation\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Accueil\",\"item\":\"https:\\\/\\\/teeptrak.com\\\/en\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"OEE Calculation Mistakes That Inflate Your Numbers by 10-18 Points\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/teeptrak.com\\\/en\\\/#website\",\"url\":\"https:\\\/\\\/teeptrak.com\\\/en\\\/\",\"name\":\"TEEPTRAK\",\"description\":\"TEEPTRAK official website - OEE\",\"publisher\":{\"@id\":\"https:\\\/\\\/teeptrak.com\\\/en\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/teeptrak.com\\\/en\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/teeptrak.com\\\/en\\\/#organization\",\"name\":\"TEEPTRAK\",\"url\":\"https:\\\/\\\/teeptrak.com\\\/en\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/teeptrak.com\\\/en\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/teeptrak.com\\\/wp-content\\\/uploads\\\/2023\\\/05\\\/cropped-Capture-decran-2023-05-04-112832.png\",\"contentUrl\":\"https:\\\/\\\/teeptrak.com\\\/wp-content\\\/uploads\\\/2023\\\/05\\\/cropped-Capture-decran-2023-05-04-112832.png\",\"width\":512,\"height\":512,\"caption\":\"TEEPTRAK\"},\"image\":{\"@id\":\"https:\\\/\\\/teeptrak.com\\\/en\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.linkedin.com\\\/company\\\/teeptrak\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/teeptrakinternational\\\/\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/teeptrak.com\\\/en\\\/#\\\/schema\\\/person\\\/e0b65287bf97c0856b9e70813a4b5aff\",\"name\":\"\u00c9quipe TEEPTRAK\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/c15a5bed2b22793c34b357757ed5a12321e733893599e115e40c0263ef4877f7?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/c15a5bed2b22793c34b357757ed5a12321e733893599e115e40c0263ef4877f7?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/c15a5bed2b22793c34b357757ed5a12321e733893599e115e40c0263ef4877f7?s=96&d=mm&r=g\",\"caption\":\"\u00c9quipe TEEPTRAK\"},\"sameAs\":[\"https:\\\/\\\/teeptrak.com\"],\"url\":\"https:\\\/\\\/teeptrak.com\\\/en\\\/author\\\/auriane\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"OEE Calculation Mistakes \u2014 18 Points Inflation | TeepTrak","description":"The five specific calculation mistakes that make reported OEE 10-18 points higher than reality. How to identify them, how to fix them, and what honest measurement reveals.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/teeptrak.com\/en\/oee-calculation-mistakes-inflation\/","og_locale":"en_US","og_type":"article","og_title":"OEE Calculation Mistakes \u2014 18 Points Inflation | TeepTrak","og_description":"The five specific calculation mistakes that make reported OEE 10-18 points higher than reality. How to identify them, how to fix them, and what honest measurement reveals.","og_url":"https:\/\/teeptrak.com\/en\/oee-calculation-mistakes-inflation\/","og_site_name":"TEEPTRAK - Connect to your industrial potential","article_published_time":"2026-04-20T09:24:26+00:00","article_modified_time":"2026-04-20T09:24:29+00:00","og_image":[{"width":1150,"height":657,"url":"https:\/\/teeptrak.com\/wp-content\/uploads\/2026\/04\/oee-calculation-mistakes-inflation.jpeg","type":"image\/jpeg"}],"author":"\u00c9quipe TEEPTRAK","twitter_card":"summary_large_image","twitter_misc":{"Written by":"\u00c9quipe TEEPTRAK","Est. reading time":"7 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/teeptrak.com\/en\/oee-calculation-mistakes-inflation\/#article","isPartOf":{"@id":"https:\/\/teeptrak.com\/en\/oee-calculation-mistakes-inflation\/"},"author":{"name":"\u00c9quipe TEEPTRAK","@id":"https:\/\/teeptrak.com\/en\/#\/schema\/person\/e0b65287bf97c0856b9e70813a4b5aff"},"headline":"OEE Calculation Mistakes That Inflate Your Numbers by 10-18 Points","datePublished":"2026-04-20T09:24:26+00:00","dateModified":"2026-04-20T09:24:29+00:00","mainEntityOfPage":{"@id":"https:\/\/teeptrak.com\/en\/oee-calculation-mistakes-inflation\/"},"wordCount":1448,"publisher":{"@id":"https:\/\/teeptrak.com\/en\/#organization"},"image":{"@id":"https:\/\/teeptrak.com\/en\/oee-calculation-mistakes-inflation\/#primaryimage"},"thumbnailUrl":"https:\/\/teeptrak.com\/wp-content\/uploads\/2026\/04\/oee-calculation-mistakes-inflation.jpeg","articleSection":["Industrial Performance"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/teeptrak.com\/en\/oee-calculation-mistakes-inflation\/","url":"https:\/\/teeptrak.com\/en\/oee-calculation-mistakes-inflation\/","name":"OEE Calculation Mistakes \u2014 18 Points Inflation | TeepTrak","isPartOf":{"@id":"https:\/\/teeptrak.com\/en\/#website"},"primaryImageOfPage":{"@id":"https:\/\/teeptrak.com\/en\/oee-calculation-mistakes-inflation\/#primaryimage"},"image":{"@id":"https:\/\/teeptrak.com\/en\/oee-calculation-mistakes-inflation\/#primaryimage"},"thumbnailUrl":"https:\/\/teeptrak.com\/wp-content\/uploads\/2026\/04\/oee-calculation-mistakes-inflation.jpeg","datePublished":"2026-04-20T09:24:26+00:00","dateModified":"2026-04-20T09:24:29+00:00","description":"The five specific calculation mistakes that make reported OEE 10-18 points higher than reality. How to identify them, how to fix them, and what honest measurement reveals.","breadcrumb":{"@id":"https:\/\/teeptrak.com\/en\/oee-calculation-mistakes-inflation\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/teeptrak.com\/en\/oee-calculation-mistakes-inflation\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/teeptrak.com\/en\/oee-calculation-mistakes-inflation\/#primaryimage","url":"https:\/\/teeptrak.com\/wp-content\/uploads\/2026\/04\/oee-calculation-mistakes-inflation.jpeg","contentUrl":"https:\/\/teeptrak.com\/wp-content\/uploads\/2026\/04\/oee-calculation-mistakes-inflation.jpeg","width":1150,"height":657,"caption":"oee calculation mistakes inflation - TeepTrak"},{"@type":"BreadcrumbList","@id":"https:\/\/teeptrak.com\/en\/oee-calculation-mistakes-inflation\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Accueil","item":"https:\/\/teeptrak.com\/en\/"},{"@type":"ListItem","position":2,"name":"OEE Calculation Mistakes That Inflate Your Numbers by 10-18 Points"}]},{"@type":"WebSite","@id":"https:\/\/teeptrak.com\/en\/#website","url":"https:\/\/teeptrak.com\/en\/","name":"TEEPTRAK","description":"TEEPTRAK official website - OEE","publisher":{"@id":"https:\/\/teeptrak.com\/en\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/teeptrak.com\/en\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/teeptrak.com\/en\/#organization","name":"TEEPTRAK","url":"https:\/\/teeptrak.com\/en\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/teeptrak.com\/en\/#\/schema\/logo\/image\/","url":"https:\/\/teeptrak.com\/wp-content\/uploads\/2023\/05\/cropped-Capture-decran-2023-05-04-112832.png","contentUrl":"https:\/\/teeptrak.com\/wp-content\/uploads\/2023\/05\/cropped-Capture-decran-2023-05-04-112832.png","width":512,"height":512,"caption":"TEEPTRAK"},"image":{"@id":"https:\/\/teeptrak.com\/en\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.linkedin.com\/company\/teeptrak\/","https:\/\/www.linkedin.com\/company\/teeptrakinternational\/"]},{"@type":"Person","@id":"https:\/\/teeptrak.com\/en\/#\/schema\/person\/e0b65287bf97c0856b9e70813a4b5aff","name":"\u00c9quipe TEEPTRAK","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/secure.gravatar.com\/avatar\/c15a5bed2b22793c34b357757ed5a12321e733893599e115e40c0263ef4877f7?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/c15a5bed2b22793c34b357757ed5a12321e733893599e115e40c0263ef4877f7?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/c15a5bed2b22793c34b357757ed5a12321e733893599e115e40c0263ef4877f7?s=96&d=mm&r=g","caption":"\u00c9quipe TEEPTRAK"},"sameAs":["https:\/\/teeptrak.com"],"url":"https:\/\/teeptrak.com\/en\/author\/auriane\/"}]}},"_links":{"self":[{"href":"https:\/\/teeptrak.com\/en\/wp-json\/wp\/v2\/posts\/88712","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/teeptrak.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/teeptrak.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/teeptrak.com\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/teeptrak.com\/en\/wp-json\/wp\/v2\/comments?post=88712"}],"version-history":[{"count":1,"href":"https:\/\/teeptrak.com\/en\/wp-json\/wp\/v2\/posts\/88712\/revisions"}],"predecessor-version":[{"id":88713,"href":"https:\/\/teeptrak.com\/en\/wp-json\/wp\/v2\/posts\/88712\/revisions\/88713"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/teeptrak.com\/en\/wp-json\/wp\/v2\/media\/88706"}],"wp:attachment":[{"href":"https:\/\/teeptrak.com\/en\/wp-json\/wp\/v2\/media?parent=88712"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/teeptrak.com\/en\/wp-json\/wp\/v2\/categories?post=88712"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/teeptrak.com\/en\/wp-json\/wp\/v2\/tags?post=88712"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}