{"id":59624,"date":"2025-11-28T02:10:40","date_gmt":"2025-11-28T02:10:40","guid":{"rendered":"https:\/\/teeptrak.com\/2025\/11\/28\/comprendre-le-oee-efficacite-globale-equipements\/"},"modified":"2026-11-18T10:15:08","modified_gmt":"2026-11-18T10:15:08","slug":"comprendre-le-oee-efficacite-globale-equipements","status":"publish","type":"post","link":"https:\/\/teeptrak.com\/en\/comprendre-le-oee-efficacite-globale-equipements\/","title":{"rendered":"Understanding OEE: Overall Equipment Efficiency to improve performance"},"content":{"rendered":"<p>In the industrial sector, maximizing equipment performance is crucial to staying competitive. This is where the concept of Overall Equipment Effectiveness (OEE) comes in. This is a key indicator for quantifying the efficiency of a production line, combining availability, performance and quality. But understanding and optimizing OEE remains a major challenge for many plants.   <\/p>\n<p>The causes of low OEE can be manifold: unplanned stoppages, waiting times, quality defects or speeds below theoretical capacity. These losses have a direct impact on yield and generate additional costs. Poor OEE often translates into more downtime, sub-optimal OEE, and degraded production quality, increasing the investment needed to correct these defects.  <\/p>\n<p>Improving OEE means adopting strategic levers such as systematic analysis of loss causes, and implementing continuous improvement techniques like Lean Manufacturing or Total Productive Maintenance (TPM). Digitizing the shop floor with solutions such as those offered by <a href=\"https:\/\/teeptrak.com\/en\/our-solutions\/\">TEEPTRAK<\/a> enables real-time monitoring and increased visibility of equipment performance, facilitating informed decision-making. <\/p>\n<p>Take the example of a chemical production plant which, thanks to TEEPTRAK, was able to identify bottlenecks on one of its lines. By monitoring data in real time, the team adjusted operations to reduce unscheduled downtime, increasing OEE by 15% in six months. This success illustrates how a methodical approach and the integration of technological solutions can transform a problematic situation into an opportunity for improvement.  <\/p>\n<p>For industrial managers, the time has come to take action to optimize the overall performance of their operations. Investing in a structured OEE project improves not only productivity, but also quality and team morale. Measuring, monitoring and improving TRS\/OEE with modern tools like TEEPTRAK is a winning strategy for any industrial player wishing to stay at the forefront of its sector.  <\/p>\n<h3><strong>FAQ<\/strong><\/h3>\n<h4><strong>Question 1: How can OEE be improved in a plant?<\/strong><\/h4>\n<p>To improve OEE, it is crucial to identify production losses and address them with targeted strategies. Continuous improvement and the digitization of the shop floor, for example with TEEPTRAK, can greatly assist in this process. <\/p>\n<h4><strong>Question 2: What is the impact of poor OEE on production?<\/strong><\/h4>\n<p>Poor OEE leads to higher downtime, lower productivity and inferior quality, all of which increase production costs and reduce plant competitiveness.<\/p>\n<h4><strong>Question 3:  <\/strong><\/h4>\n<p><script type=\"application\/ld+json\">{\"@context\":\"https:\/\/schema.org\",\"@type\":\"FAQPage\",\"mainEntity\":[{\"@type\":\"Question\",\"name\":\"What is Overall Equipment Effectiveness (OEE) and why does it matter?\",\"acceptedAnswer\":{\"@type\":\"Answer\",\"text\":\"OEE is a key performance indicator combining availability, performance, and quality to quantify production line efficiency. It's crucial for staying competitive and maximizing equipment performance in manufacturing.\"}},{\"@type\":\"Question\",\"name\":\"What causes low OEE in manufacturing plants?\",\"acceptedAnswer\":{\"@type\":\"Answer\",\"text\":\"Low OEE results from unplanned stoppages, waiting times, quality defects, and speeds below theoretical capacity. These losses directly impact yield and generate additional production costs.\"}},{\"@type\":\"Question\",\"name\":\"How can real-time monitoring improve OEE?\",\"acceptedAnswer\":{\"@type\":\"Answer\",\"text\":\"Real-time monitoring solutions like TEEPTRAK provide visibility into equipment performance, enabling identification of bottlenecks and informed decision-making. This facilitates continuous improvement and can increase OEE significantly.\"}},{\"@type\":\"Question\",\"name\":\"What strategies help improve OEE?\",\"acceptedAnswer\":{\"@type\":\"Answer\",\"text\":\"Effective strategies include systematic analysis of loss causes, continuous improvement techniques like Lean Manufacturing and Total Productive Maintenance (TPM), and digital shop floor solutions for real-time data monitoring.\"}}]}<\/script><br \/>\n<!-- seo-engine:content:235 --><\/p>\n<h2>OEE Meaning &amp; Implementation: Overall Equipment Effectiveness Explained<\/h2>\n<p>OEE (overall equipment effectiveness) is the ratio of fully productive time to planned production time on a machine or line: good parts, made at ideal speed, with no stops. OEE is calculated as Availability \u00d7 Performance \u00d7 Quality, so an OEE of 0.76 means the equipment delivered 76 minutes of fully productive time for every 100 minutes it was planned to run.<\/p>\n<p>The sections below give the exact formula, a worked shift example, the six big losses behind each factor, the difference between TEEP and OEE, and a step-by-step OEE implementation plan a plant team can start on its next shift.<\/p>\n<div class=\"se-key\">\n<p><strong>Key takeaways<\/strong><\/p>\n<ul>\n<li>OEE equals Availability \u00d7 Performance \u00d7 Quality, and the simple cross-check is good count \u00d7 ideal cycle time \/ planned time.<\/li>\n<li>Each of the six big losses belongs to one OEE factor and points to one owner.<\/li>\n<li>Short stops and reduced speed are often as large as breakdowns but invisible without automatic capture.<\/li>\n<li>TEEP adds utilization and answers capacity questions that OEE does not.<\/li>\n<\/ul>\n<\/div>\n<h2>What does OEE mean and how is it calculated?<\/h2>\n<p>Overall equipment effectiveness is a measure of how much of the planned production time a machine actually converts into good output. It was popularised by Seiichi Nakajima as the core metric of Total Productive Maintenance (TPM), and ISO 22400 lists it among the key performance indicators for manufacturing operations management.<\/p>\n<ul>\n<li><strong>Availability<\/strong> is run time divided by planned production time. It captures stops.<\/li>\n<li><strong>Performance<\/strong> is (ideal cycle time \u00d7 total count) divided by run time. It captures slow cycles and short stops.<\/li>\n<li><strong>Quality<\/strong> is good count divided by total count. It captures scrap and rework.<\/li>\n<\/ul>\n<p>A useful cross-check is the simple form: OEE = (good count \u00d7 ideal cycle time) \/ planned production time. Both forms must give the same result; if they do not, one of the inputs is wrong. The <a href=\"https:\/\/teeptrak.com\/en\/understanding-the-full-meaning-of-oee-and-ope-to-improve-industrial-performance\/\">full meaning of OEE and OPE<\/a> explains how the time categories are split when a plant also tracks operating performance.<\/p>\n<h2>What is OEE in manufacturing, with an example?<\/h2>\n<p>Suppose a packaging machine works an 8-hour shift (480 minutes) with a 30-minute planned break. Planned production time is 450 minutes. During the shift it loses 30 minutes to a breakdown and 30 minutes to a format changeover, so run time is 390 minutes. The ideal cycle time is 0.5 minutes per part, the machine produces 702 parts and 688 of them are good.<\/p>\n<table>\n<thead>\n<tr>\n<th>Factor<\/th>\n<th>Calculation<\/th>\n<th>Result<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td>Availability<\/td>\n<td>390 \/ 450<\/td>\n<td>0.867<\/td>\n<\/tr>\n<tr>\n<td>Performance<\/td>\n<td>(702 \u00d7 0.5) \/ 390 = 351 \/ 390<\/td>\n<td>0.90<\/td>\n<\/tr>\n<tr>\n<td>Quality<\/td>\n<td>688 \/ 702<\/td>\n<td>0.98<\/td>\n<\/tr>\n<tr>\n<td>OEE<\/td>\n<td>0.867 \u00d7 0.90 \u00d7 0.98<\/td>\n<td>0.76<\/td>\n<\/tr>\n<tr>\n<td>Cross-check<\/td>\n<td>(688 \u00d7 0.5) \/ 450 = 344 \/ 450<\/td>\n<td>0.76<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p>The shift therefore produced 344 minutes of fully productive time out of 450 planned, and lost 106 minutes. The world-class reference popularised by Nakajima is an OEE of 0.85, built from Availability 0.90, Performance 0.95 and Quality 0.999. It is a long-term target, not an average to compare against on day one: the useful baseline is the same machine, on the same product, over the previous weeks.<\/p>\n<figure class=\"se-fig\" style=\"margin:0\"><svg xmlns=\"http:\/\/www.w3.org\/2000\/svg\" viewBox=\"0 0 1200 250\" width=\"100%\" role=\"img\" aria-label=\"OEE of the example shift\" style=\"display:block;max-width:100%;height:auto;margin:28px 0;border-radius:14px;\"><rect width=\"1200\" height=\"250\" rx=\"14\" fill=\"#232120\"\/><rect x=\"0\" y=\"0\" width=\"12\" height=\"250\" fill=\"#EB352C\"\/><text x=\"48\" y=\"56\" fill=\"#CBD5E1\" fill-opacity=\"0.85\" font-size=\"20\" letter-spacing=\"2\" font-family='Roboto,Open Sans,Segoe UI,Helvetica,Arial,sans-serif'>OEE OF THE EXAMPLE SHIFT<\/text><text x=\"48\" y=\"140\" fill=\"#FFFFFF\" font-size=\"48\" font-weight=\"800\" font-family='Roboto,Open Sans,Segoe UI,Helvetica,Arial,sans-serif'>OEE = A \u00d7 P \u00d7 Q<\/text><text x=\"48\" y=\"200\" fill=\"#FF674C\" font-size=\"26\" font-weight=\"600\" font-family='Roboto,Open Sans,Segoe UI,Helvetica,Arial,sans-serif'><tspan opacity=\"0\">0.867 \u00d7 0.90 \u00d7 0.98 = 0.76<animate attributeName=\"opacity\" from=\"0\" to=\"1\" begin=\"0.5s\" dur=\"0.8s\" fill=\"freeze\"\/><\/tspan><\/text><\/svg><\/figure>\n<aside class=\"se-magnet\" style=\"margin:32px 0;padding:22px 24px;border:1px solid #EBEBEB;border-left:5px solid #EB352C;border-radius:14px;background:#F5F6F5;display:flex;flex-wrap:wrap;gap:16px;align-items:center;justify-content:space-between\">\n<div style=\"flex:1 1 320px\">\n<div style=\"font-size:12px;letter-spacing:.12em;text-transform:uppercase;color:#EB352C;font-weight:700;margin-bottom:6px\">Free download<\/div>\n<div style=\"font-size:1.1em;font-weight:700;color:#232120\">Free OEE Calculator Excel Template (5 sheets)<\/div>\n<\/div>\n<p><a href=\"https:\/\/teeptrak.com\/en\/free-oee-calculator-excel-template\/\" style=\"display:inline-block;background:#EB352C;color:#fff;padding:12px 22px;border-radius:8px;text-decoration:none;font-weight:700;white-space:nowrap\">Get the kit<\/a><\/aside>\n<h2>What are the six big losses in OEE?<\/h2>\n<p>The six big losses are the TPM classification of everything that separates real output from fully productive time. Each loss belongs to exactly one OEE factor, which tells a team who owns the countermeasure. Applied to the example shift, the 106 lost minutes break down as follows.<\/p>\n<table>\n<thead>\n<tr>\n<th>OEE factor<\/th>\n<th>Big loss<\/th>\n<th>Minutes in the example<\/th>\n<th>Typical countermeasure<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td>Availability<\/td>\n<td>Equipment failure<\/td>\n<td>30<\/td>\n<td>Root cause analysis, preventive maintenance, MTTR reduction<\/td>\n<\/tr>\n<tr>\n<td>Availability<\/td>\n<td>Setup and adjustment<\/td>\n<td>30<\/td>\n<td>SMED, standard changeover kits<\/td>\n<\/tr>\n<tr>\n<td>Performance<\/td>\n<td>Idling and minor stops<\/td>\n<td>25<\/td>\n<td>Automatic capture of short stops, jam elimination<\/td>\n<\/tr>\n<tr>\n<td>Performance<\/td>\n<td>Reduced speed<\/td>\n<td>14<\/td>\n<td>Restore ideal speed, fix the cause of slowdowns<\/td>\n<\/tr>\n<tr>\n<td>Quality<\/td>\n<td>Process defects and startup rejects<\/td>\n<td>7<\/td>\n<td>Parameter standards, first-part checks<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p>The quality minutes are the 14 rejected parts multiplied by the 0.5-minute ideal cycle. Notice that the 39 performance minutes almost match the breakdown and changeover losses combined, yet they never appear on a manual shift log. That is why <a href=\"https:\/\/teeptrak.com\/en\/what-is-production-monitoring\/\">production monitoring<\/a> with automatic stop detection usually changes the loss ranking within the first weeks.<\/p>\n<figure class=\"se-fig\" style=\"margin:0\"><svg xmlns=\"http:\/\/www.w3.org\/2000\/svg\" viewBox=\"0 0 1200 394\" width=\"100%\" role=\"img\" aria-label=\"Lost minutes by big loss\" style=\"display:block;max-width:100%;height:auto;margin:28px 0;border-radius:14px;\"><rect width=\"1200\" height=\"394\" rx=\"14\" fill=\"#FFFFFF\" stroke=\"#EBEBEB\"\/><text x=\"24\" y=\"44\" fill=\"#232120\" font-size=\"24\" font-weight=\"700\" font-family='Roboto,Open Sans,Segoe UI,Helvetica,Arial,sans-serif'>Lost minutes by big loss<\/text><text x=\"24\" y=\"106\" fill=\"#4B4846\" font-size=\"19\" font-family='Roboto,Open Sans,Segoe UI,Helvetica,Arial,sans-serif'>Breakdown<\/text><rect x=\"330\" y=\"76\" width=\"720\" height=\"40\" rx=\"8\" fill=\"#F5F6F5\"\/><rect x=\"330\" y=\"76\" width=\"720\" height=\"40\" rx=\"8\" fill=\"#EB352C\"><animate attributeName=\"width\" from=\"0\" to=\"720\" dur=\"1s\" begin=\"0s\" fill=\"freeze\"\/><\/rect><text x=\"1066\" y=\"104\" fill=\"#232120\" font-size=\"20\" font-weight=\"700\" font-family='Roboto,Open Sans,Segoe UI,Helvetica,Arial,sans-serif'>30 min<\/text><text x=\"24\" y=\"164\" fill=\"#4B4846\" font-size=\"19\" font-family='Roboto,Open Sans,Segoe UI,Helvetica,Arial,sans-serif'>Changeover<\/text><rect x=\"330\" y=\"134\" width=\"720\" height=\"40\" rx=\"8\" fill=\"#F5F6F5\"\/><rect x=\"330\" y=\"134\" width=\"720\" height=\"40\" rx=\"8\" fill=\"#FF674C\"><animate attributeName=\"width\" from=\"0\" to=\"720\" dur=\"1s\" begin=\"0.1s\" fill=\"freeze\"\/><\/rect><text x=\"1066\" y=\"162\" fill=\"#232120\" font-size=\"20\" font-weight=\"700\" font-family='Roboto,Open Sans,Segoe UI,Helvetica,Arial,sans-serif'>30 min<\/text><text x=\"24\" y=\"222\" fill=\"#4B4846\" font-size=\"19\" font-family='Roboto,Open Sans,Segoe UI,Helvetica,Arial,sans-serif'>Minor stops<\/text><rect x=\"330\" y=\"192\" width=\"720\" height=\"40\" rx=\"8\" fill=\"#F5F6F5\"\/><rect x=\"330\" y=\"192\" width=\"600\" height=\"40\" rx=\"8\" fill=\"#8B8885\"><animate attributeName=\"width\" from=\"0\" to=\"600\" dur=\"1s\" begin=\"0.2s\" fill=\"freeze\"\/><\/rect><text x=\"1066\" y=\"220\" fill=\"#232120\" font-size=\"20\" font-weight=\"700\" font-family='Roboto,Open Sans,Segoe UI,Helvetica,Arial,sans-serif'>25 min<\/text><text x=\"24\" y=\"280\" fill=\"#4B4846\" font-size=\"19\" font-family='Roboto,Open Sans,Segoe UI,Helvetica,Arial,sans-serif'>Reduced speed<\/text><rect x=\"330\" y=\"250\" width=\"720\" height=\"40\" rx=\"8\" fill=\"#F5F6F5\"\/><rect x=\"330\" y=\"250\" width=\"336\" height=\"40\" rx=\"8\" fill=\"#8B8885\"><animate attributeName=\"width\" from=\"0\" to=\"336\" dur=\"1s\" begin=\"0.30000000000000004s\" fill=\"freeze\"\/><\/rect><text x=\"1066\" y=\"278\" fill=\"#232120\" font-size=\"20\" font-weight=\"700\" font-family='Roboto,Open Sans,Segoe UI,Helvetica,Arial,sans-serif'>14 min<\/text><text x=\"24\" y=\"338\" fill=\"#4B4846\" font-size=\"19\" font-family='Roboto,Open Sans,Segoe UI,Helvetica,Arial,sans-serif'>Defects<\/text><rect x=\"330\" y=\"308\" width=\"720\" height=\"40\" rx=\"8\" fill=\"#F5F6F5\"\/><rect x=\"330\" y=\"308\" width=\"168\" height=\"40\" rx=\"8\" fill=\"#8B8885\"><animate attributeName=\"width\" from=\"0\" to=\"168\" dur=\"1s\" begin=\"0.4s\" fill=\"freeze\"\/><\/rect><text x=\"1066\" y=\"336\" fill=\"#232120\" font-size=\"20\" font-weight=\"700\" font-family='Roboto,Open Sans,Segoe UI,Helvetica,Arial,sans-serif'>7 min<\/text><\/svg><\/figure>\n<h2>TEEP vs OEE: what is the difference?<\/h2>\n<p>TEEP (total effective equipment performance) is OEE multiplied by utilization, where utilization is planned production time divided by all calendar time. OEE answers how well the equipment runs when it is scheduled; TEEP answers how much of the total capacity of the asset is turned into good output.<\/p>\n<p>In the example, the machine works one 450-minute shift per day out of 1,440 calendar minutes. Utilization is 450 \/ 1,440 = 0.31 and TEEP is 0.76 \u00d7 0.31 = 0.24. The decision rule is straightforward: use OEE to improve how a line runs, and use TEEP when the question is whether to add shifts or buy another machine. A low TEEP with a solid OEE means capacity exists in the calendar, not in the equipment.<\/p>\n<figure class=\"se-fig\" style=\"margin:0\"><svg xmlns=\"http:\/\/www.w3.org\/2000\/svg\" viewBox=\"0 0 1200 300\" width=\"100%\" role=\"img\" aria-label=\"OEE vs TEEP for the example\" style=\"display:block;max-width:100%;height:auto;margin:28px 0;border-radius:14px;\"><rect width=\"1200\" height=\"300\" rx=\"14\" fill=\"#FFFFFF\" stroke=\"#EBEBEB\"\/><text x=\"24\" y=\"44\" fill=\"#232120\" font-size=\"24\" font-weight=\"700\" font-family='Roboto,Open Sans,Segoe UI,Helvetica,Arial,sans-serif'>OEE vs TEEP for the example<\/text><g opacity=\"0\"><animate attributeName=\"opacity\" from=\"0\" to=\"1\" begin=\"0s\" dur=\"0.6s\" fill=\"freeze\"\/><rect x=\"24\" y=\"72\" width=\"270\" height=\"196\" rx=\"12\" fill=\"#F5F6F5\" stroke=\"#EBEBEB\"\/><rect x=\"24\" y=\"72\" width=\"270\" height=\"6\" rx=\"3\" fill=\"#EB352C\"\/><text x=\"159\" y=\"166\" text-anchor=\"middle\" fill=\"#EB352C\" font-size=\"52\" font-weight=\"800\" font-family='Roboto,Open Sans,Segoe UI,Helvetica,Arial,sans-serif'>450 min<\/text><text fill=\"#4B4846\" font-size=\"20\" text-anchor=\"middle\" font-family='Roboto,Open Sans,Segoe UI,Helvetica,Arial,sans-serif'><tspan x=\"159\" y=\"214\">Planned time<\/tspan><\/text><\/g><g opacity=\"0\"><animate attributeName=\"opacity\" from=\"0\" to=\"1\" begin=\"0.15s\" dur=\"0.6s\" fill=\"freeze\"\/><rect x=\"318\" y=\"72\" width=\"270\" height=\"196\" rx=\"12\" fill=\"#F5F6F5\" stroke=\"#EBEBEB\"\/><rect x=\"318\" y=\"72\" width=\"270\" height=\"6\" rx=\"3\" fill=\"#EB352C\"\/><text x=\"453\" y=\"166\" text-anchor=\"middle\" fill=\"#EB352C\" font-size=\"52\" font-weight=\"800\" font-family='Roboto,Open Sans,Segoe UI,Helvetica,Arial,sans-serif'>0.76<\/text><text fill=\"#4B4846\" font-size=\"20\" text-anchor=\"middle\" font-family='Roboto,Open Sans,Segoe UI,Helvetica,Arial,sans-serif'><tspan x=\"453\" y=\"214\">OEE<\/tspan><\/text><\/g><g opacity=\"0\"><animate attributeName=\"opacity\" from=\"0\" to=\"1\" begin=\"0.3s\" dur=\"0.6s\" fill=\"freeze\"\/><rect x=\"612\" y=\"72\" width=\"270\" height=\"196\" rx=\"12\" fill=\"#F5F6F5\" stroke=\"#EBEBEB\"\/><rect x=\"612\" y=\"72\" width=\"270\" height=\"6\" rx=\"3\" fill=\"#EB352C\"\/><text x=\"747\" y=\"166\" text-anchor=\"middle\" fill=\"#EB352C\" font-size=\"52\" font-weight=\"800\" font-family='Roboto,Open Sans,Segoe UI,Helvetica,Arial,sans-serif'>0.31<\/text><text fill=\"#4B4846\" font-size=\"20\" text-anchor=\"middle\" font-family='Roboto,Open Sans,Segoe UI,Helvetica,Arial,sans-serif'><tspan x=\"747\" y=\"214\">Utilization<\/tspan><\/text><\/g><g opacity=\"0\"><animate attributeName=\"opacity\" from=\"0\" to=\"1\" begin=\"0.44999999999999996s\" dur=\"0.6s\" fill=\"freeze\"\/><rect x=\"906\" y=\"72\" width=\"270\" height=\"196\" rx=\"12\" fill=\"#F5F6F5\" stroke=\"#EBEBEB\"\/><rect x=\"906\" y=\"72\" width=\"270\" height=\"6\" rx=\"3\" fill=\"#EB352C\"\/><text x=\"1041\" y=\"166\" text-anchor=\"middle\" fill=\"#EB352C\" font-size=\"52\" font-weight=\"800\" font-family='Roboto,Open Sans,Segoe UI,Helvetica,Arial,sans-serif'>0.24<\/text><text fill=\"#4B4846\" font-size=\"20\" text-anchor=\"middle\" font-family='Roboto,Open Sans,Segoe UI,Helvetica,Arial,sans-serif'><tspan x=\"1041\" y=\"214\">TEEP<\/tspan><\/text><\/g><\/svg><\/figure>\n<h2>How do you implement OEE on a production line?<\/h2>\n<p>An OEE implementation fails more often on definitions than on software. The following procedure keeps the numbers credible for both production and maintenance.<\/p>\n<ol>\n<li><strong>Start on the bottleneck.<\/strong> Pick one line, ideally the constraint, so every minute recovered becomes extra output.<\/li>\n<li><strong>Write the time rules.<\/strong> Define what counts as planned production time: breaks, meetings and no-order periods are excluded, changeovers and cleaning are included.<\/li>\n<li><strong>Fix the ideal cycle time per product.<\/strong> Use the nameplate rate or the best demonstrated rate, never the average. If Performance comes out above 1.0, the ideal cycle time is wrong.<\/li>\n<li><strong>Build a short stop reason list.<\/strong> For example, 10 to 15 reasons per machine type, each mapped to one of the six big losses.<\/li>\n<li><strong>Automate the capture.<\/strong> Count parts and stops from the machine signal so short stops are not lost to manual logging.<\/li>\n<li><strong>Set a review routine.<\/strong> For example, any loss above 30 minutes per shift gets a named owner and a countermeasure at the next daily meeting.<\/li>\n<li><strong>Display it on the shop floor.<\/strong> Operators act on the current shift, not on last month&#8217;s average.<\/li>\n<\/ol>\n<p>Common pitfalls: excluding changeovers from planned time to make Availability look better, averaging OEE across machines of different speeds, and comparing lines that make different products. A <a href=\"https:\/\/teeptrak.com\/en\/best-oee-software-2026\/\">comparison of OEE software<\/a> helps when choosing a tool for step 5. TEEPTRAK runs PerfTrak for real-time OEE and downtime and MoniTrak for shop-floor screens in more than 700 factories across 30+ countries, and offers a 90-day guided pilot on one line. To see the method on a line like yours: <a href=\"https:\/\/teeptrak.com\/en\/request-a-demo\/\">Request a demo<\/a>.<\/p>\n<h2>Frequently asked questions<\/h2>\n<h3>What does OEE stand for in manufacturing?<\/h3>\n<p>OEE stands for overall equipment effectiveness. It measures the share of planned production time in which a machine makes good parts at ideal speed, as Availability \u00d7 Performance \u00d7 Quality.<\/p>\n<h3>What are the six big losses in OEE?<\/h3>\n<p>Equipment failure and setup or adjustment reduce Availability, idling or minor stops and reduced speed reduce Performance, and process defects and startup rejects reduce Quality. Each loss maps to one OEE factor and one type of countermeasure.<\/p>\n<h3>Can OEE be greater than 1?<\/h3>\n<p>No, a correctly calculated OEE cannot exceed 1. A result above 1 almost always means the ideal cycle time is set slower than the machine can really run.<\/p>\n<h3>What is a good OEE score?<\/h3>\n<p>The world-class reference popularised by Seiichi Nakajima is an OEE of 0.85. In practice, the most useful comparison is the same machine and product against its own recent baseline.<\/p>\n<h3>What is the difference between TEEP and OEE?<\/h3>\n<p>OEE measures effectiveness during planned production time, while TEEP multiplies OEE by utilization of all calendar time. OEE guides line improvement; TEEP guides capacity decisions such as adding shifts.<\/p>\n<p><script type=\"application\/ld+json\">{\"@context\":\"https:\/\/schema.org\",\"@type\":\"FAQPage\",\"mainEntity\":[{\"@type\":\"Question\",\"name\":\"What does OEE stand for in manufacturing?\",\"acceptedAnswer\":{\"@type\":\"Answer\",\"text\":\"OEE stands for overall equipment effectiveness. It measures the share of planned production time in which a machine makes good parts at ideal speed, as Availability \u00d7 Performance \u00d7 Quality.\"}},{\"@type\":\"Question\",\"name\":\"What are the six big losses in OEE?\",\"acceptedAnswer\":{\"@type\":\"Answer\",\"text\":\"Equipment failure and setup or adjustment reduce Availability, idling or minor stops and reduced speed reduce Performance, and process defects and startup rejects reduce Quality. Each loss maps to one OEE factor and one type of countermeasure.\"}},{\"@type\":\"Question\",\"name\":\"Can OEE be greater than 1?\",\"acceptedAnswer\":{\"@type\":\"Answer\",\"text\":\"No, a correctly calculated OEE cannot exceed 1. A result above 1 almost always means the ideal cycle time is set slower than the machine can really run.\"}},{\"@type\":\"Question\",\"name\":\"What is a good OEE score?\",\"acceptedAnswer\":{\"@type\":\"Answer\",\"text\":\"The world-class reference popularised by Seiichi Nakajima is an OEE of 0.85. In practice, the most useful comparison is the same machine and product against its own recent baseline.\"}},{\"@type\":\"Question\",\"name\":\"What is the difference between TEEP and OEE?\",\"acceptedAnswer\":{\"@type\":\"Answer\",\"text\":\"OEE measures effectiveness during planned production time, while TEEP multiplies OEE by utilization of all calendar time. OEE guides line improvement; TEEP guides capacity decisions such as adding shifts.\"}}]}<\/script><\/p>\n<h3>Read next<\/h3>\n<ul>\n<li><a href=\"https:\/\/teeptrak.com\/en\/best-fabrico-alternatives-2026\/\">best fabrico alternatives 2026<\/a><\/li>\n<li><a href=\"https:\/\/teeptrak.com\/en\/manufacturing-dashboard-design-guide-2026\/\">manufacturing dashboard design guide 2026<\/a><\/li>\n<li><a href=\"https:\/\/teeptrak.com\/en\/tractian-alternative-oee-software\/\">tractian alternative oee software<\/a><\/li>\n<\/ul>\n<div class=\"se-cta\" style=\"margin:32px 0 8px;padding:22px 24px;border-left:4px solid #EB352C;background:#F5F6F5;\">\n<p style=\"margin:0 0 12px;font-size:1.05em;\"><strong>TEEPTRAK<\/strong>: oee overall equipment effectiveness<\/p>\n<p><a href=\"https:\/\/teeptrak.com\/en\/request-a-demo\/\" style=\"display:inline-block;background:#EB352C;color:#fff;padding:12px 22px;border-radius:6px;text-decoration:none;font-weight:700;\">Request a demo<\/a><\/div>\n<p><!-- seo-engine:content:235 --><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Find out how OEE can boost your plant&#8217;s performance with real-time monitoring and analysis solutions.<\/p>\n","protected":false},"author":384731,"featured_media":59302,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_yoast_wpseo_meta-robots-noindex":"","_yoast_wpseo_canonical":"","_et_pb_use_builder":"","_et_pb_old_content":"","_et_gb_content_width":"","ai_seo_title":"Understanding OEE: Overall Equipment Effectiveness - TEEPTRAK Guide","ai_meta_description":"Improve your plant's efficiency with OEE. Discover TEEPTRAK's OEE guide to boost your performance.","ai_focus_keyword":"oee overall equipment effectiveness","footnotes":""},"categories":[101],"tags":[],"class_list":["post-59624","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-industrial-performance"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.9 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Understanding OEE: Overall Equipment Effectiveness - TEEPTRAK Guide<\/title>\n<meta name=\"description\" content=\"Improve your plant&#039;s efficiency with OEE. Discover TEEPTRAK&#039;s OEE guide to boost your performance.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/teeptrak.com\/en\/comprendre-le-oee-efficacite-globale-equipements\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Understanding OEE: Overall Equipment Effectiveness - TEEPTRAK Guide\" \/>\n<meta property=\"og:description\" content=\"Improve your plant&#039;s efficiency with OEE. Discover TEEPTRAK&#039;s OEE guide to boost your performance.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/teeptrak.com\/en\/comprendre-le-oee-efficacite-globale-equipements\/\" \/>\n<meta property=\"og:site_name\" content=\"TEEPTRAK\" \/>\n<meta property=\"article:published_time\" content=\"2025-11-28T02:10:40+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-11-18T10:15:08+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/teeptrak.com\/wp-content\/uploads\/2025\/11\/tmp62mpf4sl.jpeg.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1150\" \/>\n\t<meta property=\"og:image:height\" content=\"657\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Ravinder Singh\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:creator\" content=\"@teeptrak\" \/>\n<meta name=\"twitter:site\" content=\"@teeptrak\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Ravinder Singh\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"8 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/teeptrak.com\\\/en\\\/comprendre-le-oee-efficacite-globale-equipements\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/teeptrak.com\\\/en\\\/comprendre-le-oee-efficacite-globale-equipements\\\/\"},\"author\":{\"name\":\"Ravinder Singh\",\"@id\":\"https:\\\/\\\/teeptrak.com\\\/en\\\/#\\\/schema\\\/person\\\/5484ebe4069fad865d1c25e65eee6d5e\"},\"headline\":\"Understanding OEE: Overall Equipment Efficiency to improve performance\",\"datePublished\":\"2025-11-28T02:10:40+00:00\",\"dateModified\":\"2026-11-18T10:15:08+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/teeptrak.com\\\/en\\\/comprendre-le-oee-efficacite-globale-equipements\\\/\"},\"wordCount\":1628,\"publisher\":{\"@id\":\"https:\\\/\\\/teeptrak.com\\\/en\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/teeptrak.com\\\/en\\\/comprendre-le-oee-efficacite-globale-equipements\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/teeptrak.com\\\/wp-content\\\/uploads\\\/2025\\\/11\\\/tmp62mpf4sl.jpeg.jpg\",\"articleSection\":[\"Industrial Performance\"],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/teeptrak.com\\\/en\\\/comprendre-le-oee-efficacite-globale-equipements\\\/\",\"url\":\"https:\\\/\\\/teeptrak.com\\\/en\\\/comprendre-le-oee-efficacite-globale-equipements\\\/\",\"name\":\"Understanding OEE: Overall Equipment Effectiveness - TEEPTRAK Guide\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/teeptrak.com\\\/en\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/teeptrak.com\\\/en\\\/comprendre-le-oee-efficacite-globale-equipements\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/teeptrak.com\\\/en\\\/comprendre-le-oee-efficacite-globale-equipements\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/teeptrak.com\\\/wp-content\\\/uploads\\\/2025\\\/11\\\/tmp62mpf4sl.jpeg.jpg\",\"datePublished\":\"2025-11-28T02:10:40+00:00\",\"dateModified\":\"2026-11-18T10:15:08+00:00\",\"description\":\"Improve your plant's efficiency with OEE. Discover TEEPTRAK's OEE guide to boost your performance.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/teeptrak.com\\\/en\\\/comprendre-le-oee-efficacite-globale-equipements\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/teeptrak.com\\\/en\\\/comprendre-le-oee-efficacite-globale-equipements\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/teeptrak.com\\\/en\\\/comprendre-le-oee-efficacite-globale-equipements\\\/#primaryimage\",\"url\":\"https:\\\/\\\/teeptrak.com\\\/wp-content\\\/uploads\\\/2025\\\/11\\\/tmp62mpf4sl.jpeg.jpg\",\"contentUrl\":\"https:\\\/\\\/teeptrak.com\\\/wp-content\\\/uploads\\\/2025\\\/11\\\/tmp62mpf4sl.jpeg.jpg\",\"width\":1150,\"height\":657},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/teeptrak.com\\\/en\\\/comprendre-le-oee-efficacite-globale-equipements\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Accueil\",\"item\":\"https:\\\/\\\/teeptrak.com\\\/en\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Understanding OEE: Overall Equipment Efficiency to improve performance\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/teeptrak.com\\\/en\\\/#website\",\"url\":\"https:\\\/\\\/teeptrak.com\\\/en\\\/\",\"name\":\"TEEPTRAK\",\"description\":\"Optimisez votre potentiel industriel\",\"publisher\":{\"@id\":\"https:\\\/\\\/teeptrak.com\\\/en\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/teeptrak.com\\\/en\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/teeptrak.com\\\/en\\\/#organization\",\"name\":\"TeepTrak\",\"url\":\"https:\\\/\\\/teeptrak.com\\\/en\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/teeptrak.com\\\/en\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/teeptrak.com\\\/wp-content\\\/uploads\\\/2026\\\/07\\\/TeepTrak_Logo-PNG-1-scaled.png\",\"contentUrl\":\"https:\\\/\\\/teeptrak.com\\\/wp-content\\\/uploads\\\/2026\\\/07\\\/TeepTrak_Logo-PNG-1-scaled.png\",\"width\":2880,\"height\":528,\"caption\":\"TeepTrak\"},\"image\":{\"@id\":\"https:\\\/\\\/teeptrak.com\\\/en\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/x.com\\\/teeptrak\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/teeptrak\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/teeptrakinternational\\\/\",\"https:\\\/\\\/www.youtube.com\\\/@teeptrak\\\/videos\",\"https:\\\/\\\/www.instagram.com\\\/teeptrak\\\/\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/teeptrak.com\\\/en\\\/#\\\/schema\\\/person\\\/5484ebe4069fad865d1c25e65eee6d5e\",\"name\":\"Ravinder Singh\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/afa004471ac2dcd20a0bfe626e1cfd4d06876c592f2b766fca708c3d717a3d13?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/afa004471ac2dcd20a0bfe626e1cfd4d06876c592f2b766fca708c3d717a3d13?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/afa004471ac2dcd20a0bfe626e1cfd4d06876c592f2b766fca708c3d717a3d13?s=96&d=mm&r=g\",\"caption\":\"Ravinder Singh\"}}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Understanding OEE: Overall Equipment Effectiveness - TEEPTRAK Guide","description":"Improve your plant's efficiency with OEE. Discover TEEPTRAK's OEE guide to boost your performance.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/teeptrak.com\/en\/comprendre-le-oee-efficacite-globale-equipements\/","og_locale":"en_US","og_type":"article","og_title":"Understanding OEE: Overall Equipment Effectiveness - TEEPTRAK Guide","og_description":"Improve your plant's efficiency with OEE. Discover TEEPTRAK's OEE guide to boost your performance.","og_url":"https:\/\/teeptrak.com\/en\/comprendre-le-oee-efficacite-globale-equipements\/","og_site_name":"TEEPTRAK","article_published_time":"2025-11-28T02:10:40+00:00","article_modified_time":"2026-11-18T10:15:08+00:00","og_image":[{"width":1150,"height":657,"url":"https:\/\/teeptrak.com\/wp-content\/uploads\/2025\/11\/tmp62mpf4sl.jpeg.jpg","type":"image\/jpeg"}],"author":"Ravinder Singh","twitter_card":"summary_large_image","twitter_creator":"@teeptrak","twitter_site":"@teeptrak","twitter_misc":{"Written by":"Ravinder Singh","Est. reading time":"8 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/teeptrak.com\/en\/comprendre-le-oee-efficacite-globale-equipements\/#article","isPartOf":{"@id":"https:\/\/teeptrak.com\/en\/comprendre-le-oee-efficacite-globale-equipements\/"},"author":{"name":"Ravinder Singh","@id":"https:\/\/teeptrak.com\/en\/#\/schema\/person\/5484ebe4069fad865d1c25e65eee6d5e"},"headline":"Understanding OEE: Overall Equipment Efficiency to improve performance","datePublished":"2025-11-28T02:10:40+00:00","dateModified":"2026-11-18T10:15:08+00:00","mainEntityOfPage":{"@id":"https:\/\/teeptrak.com\/en\/comprendre-le-oee-efficacite-globale-equipements\/"},"wordCount":1628,"publisher":{"@id":"https:\/\/teeptrak.com\/en\/#organization"},"image":{"@id":"https:\/\/teeptrak.com\/en\/comprendre-le-oee-efficacite-globale-equipements\/#primaryimage"},"thumbnailUrl":"https:\/\/teeptrak.com\/wp-content\/uploads\/2025\/11\/tmp62mpf4sl.jpeg.jpg","articleSection":["Industrial Performance"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/teeptrak.com\/en\/comprendre-le-oee-efficacite-globale-equipements\/","url":"https:\/\/teeptrak.com\/en\/comprendre-le-oee-efficacite-globale-equipements\/","name":"Understanding OEE: Overall Equipment Effectiveness - TEEPTRAK Guide","isPartOf":{"@id":"https:\/\/teeptrak.com\/en\/#website"},"primaryImageOfPage":{"@id":"https:\/\/teeptrak.com\/en\/comprendre-le-oee-efficacite-globale-equipements\/#primaryimage"},"image":{"@id":"https:\/\/teeptrak.com\/en\/comprendre-le-oee-efficacite-globale-equipements\/#primaryimage"},"thumbnailUrl":"https:\/\/teeptrak.com\/wp-content\/uploads\/2025\/11\/tmp62mpf4sl.jpeg.jpg","datePublished":"2025-11-28T02:10:40+00:00","dateModified":"2026-11-18T10:15:08+00:00","description":"Improve your plant's efficiency with OEE. Discover TEEPTRAK's OEE guide to boost your performance.","breadcrumb":{"@id":"https:\/\/teeptrak.com\/en\/comprendre-le-oee-efficacite-globale-equipements\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/teeptrak.com\/en\/comprendre-le-oee-efficacite-globale-equipements\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/teeptrak.com\/en\/comprendre-le-oee-efficacite-globale-equipements\/#primaryimage","url":"https:\/\/teeptrak.com\/wp-content\/uploads\/2025\/11\/tmp62mpf4sl.jpeg.jpg","contentUrl":"https:\/\/teeptrak.com\/wp-content\/uploads\/2025\/11\/tmp62mpf4sl.jpeg.jpg","width":1150,"height":657},{"@type":"BreadcrumbList","@id":"https:\/\/teeptrak.com\/en\/comprendre-le-oee-efficacite-globale-equipements\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Accueil","item":"https:\/\/teeptrak.com\/en\/"},{"@type":"ListItem","position":2,"name":"Understanding OEE: Overall Equipment Efficiency to improve performance"}]},{"@type":"WebSite","@id":"https:\/\/teeptrak.com\/en\/#website","url":"https:\/\/teeptrak.com\/en\/","name":"TEEPTRAK","description":"Optimisez votre potentiel industriel","publisher":{"@id":"https:\/\/teeptrak.com\/en\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/teeptrak.com\/en\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/teeptrak.com\/en\/#organization","name":"TeepTrak","url":"https:\/\/teeptrak.com\/en\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/teeptrak.com\/en\/#\/schema\/logo\/image\/","url":"https:\/\/teeptrak.com\/wp-content\/uploads\/2026\/07\/TeepTrak_Logo-PNG-1-scaled.png","contentUrl":"https:\/\/teeptrak.com\/wp-content\/uploads\/2026\/07\/TeepTrak_Logo-PNG-1-scaled.png","width":2880,"height":528,"caption":"TeepTrak"},"image":{"@id":"https:\/\/teeptrak.com\/en\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/x.com\/teeptrak","https:\/\/www.linkedin.com\/company\/teeptrak\/","https:\/\/www.linkedin.com\/company\/teeptrakinternational\/","https:\/\/www.youtube.com\/@teeptrak\/videos","https:\/\/www.instagram.com\/teeptrak\/"]},{"@type":"Person","@id":"https:\/\/teeptrak.com\/en\/#\/schema\/person\/5484ebe4069fad865d1c25e65eee6d5e","name":"Ravinder Singh","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/secure.gravatar.com\/avatar\/afa004471ac2dcd20a0bfe626e1cfd4d06876c592f2b766fca708c3d717a3d13?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/afa004471ac2dcd20a0bfe626e1cfd4d06876c592f2b766fca708c3d717a3d13?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/afa004471ac2dcd20a0bfe626e1cfd4d06876c592f2b766fca708c3d717a3d13?s=96&d=mm&r=g","caption":"Ravinder Singh"}}]}},"_links":{"self":[{"href":"https:\/\/teeptrak.com\/en\/wp-json\/wp\/v2\/posts\/59624","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/teeptrak.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/teeptrak.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/teeptrak.com\/en\/wp-json\/wp\/v2\/users\/384731"}],"replies":[{"embeddable":true,"href":"https:\/\/teeptrak.com\/en\/wp-json\/wp\/v2\/comments?post=59624"}],"version-history":[{"count":3,"href":"https:\/\/teeptrak.com\/en\/wp-json\/wp\/v2\/posts\/59624\/revisions"}],"predecessor-version":[{"id":162494,"href":"https:\/\/teeptrak.com\/en\/wp-json\/wp\/v2\/posts\/59624\/revisions\/162494"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/teeptrak.com\/en\/wp-json\/wp\/v2\/media\/59302"}],"wp:attachment":[{"href":"https:\/\/teeptrak.com\/en\/wp-json\/wp\/v2\/media?parent=59624"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/teeptrak.com\/en\/wp-json\/wp\/v2\/categories?post=59624"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/teeptrak.com\/en\/wp-json\/wp\/v2\/tags?post=59624"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}