{"id":50367,"date":"2025-07-09T11:51:52","date_gmt":"2025-07-09T11:51:52","guid":{"rendered":"https:\/\/teeptrak.com\/2025\/07\/09\/hoshin-kanri\/"},"modified":"2025-11-28T12:23:23","modified_gmt":"2025-11-28T12:23:23","slug":"hoshin-kanri","status":"publish","type":"post","link":"https:\/\/teeptrak.com\/en\/hoshin-kanri\/","title":{"rendered":"Hoshin Kanri: Understanding and Applying the Method for a High-Performance Industrial Strategy"},"content":{"rendered":"<p>[et_pb_section fb_built=&#8221;1&#8243; _builder_version=&#8221;4.27.4&#8243; _module_preset=&#8221;default&#8221; global_colors_info=&#8221;{}&#8221; theme_builder_area=&#8221;post_content&#8221;][et_pb_row _builder_version=&#8221;4.27.4&#8243; _module_preset=&#8221;default&#8221; global_colors_info=&#8221;{}&#8221; theme_builder_area=&#8221;post_content&#8221;][et_pb_column type=&#8221;4_4&#8243; _builder_version=&#8221;4.27.4&#8243; _module_preset=&#8221;default&#8221; global_colors_info=&#8221;{}&#8221; theme_builder_area=&#8221;post_content&#8221;][et_pb_text _builder_version=&#8221;4.27.4&#8243; _module_preset=&#8221;default&#8221; hover_enabled=&#8221;0&#8243; global_colors_info=&#8221;{}&#8221; theme_builder_area=&#8221;post_content&#8221; sticky_enabled=&#8221;0&#8243;]<\/p>\n<h2><b>Introduction<\/b><\/h2>\n<h3><b>What is the Hoshin Kanri method?<\/b><\/h3>\n<p>The Hoshin Kanri method, also known as \u201cpolicy deployment\u201d or \u201cmanagement by breakthrough\u201d, is a strategic planning process aimed at aligning a company\u2019s goals with concrete actions carried out on the ground. It is based on a structured approach that translates the long-term vision into annual action plans, involving every level of the organization. <\/p>\n<p>The main objective is to ensure consistency between the overall strategy and the daily work of teams, while promoting cross-functional communication and accountability at all hierarchical levels.<\/p>\n<h3><b>Why is it essential to modern industry?<\/b><\/h3>\n<p>Today, many industrial companies struggle to deploy their strategy effectively, due to compartmentalization between departments, a lack of clear priorities, a failure to monitor results or poor team mobilization.<\/p>\n<p>The primary objective is to ensure alignment between the overall strategy and the daily activities of teams, while fostering cross-functional communication and accountability at all levels of the organization. <\/p>\n<h3><b>Who it&#8217;s for (managers, project managers, consultants) <\/b><\/h3>\n<p>Hoshin Kanri is primarily intended for executives, project managers, and consultants who are eager to transform their organization around a shared vision. It offers a powerful framework to align priorities, structure strategic initiatives, and involve all teams in a collective and continuous improvement effort. <\/p>\n<p><span style=\"font-weight: 400;\">\ud83e\udde9 <\/span><b>Did you know?<\/b><b><br \/><\/b>The Hoshin Kanri method was massively adopted by Toyota as early as the 1960s to synchronize the actions of all its teams with long-term strategic objectives.<\/p>\n<p>[\/et_pb_text][\/et_pb_column][\/et_pb_row][et_pb_row _builder_version=&#8221;4.27.4&#8243; _module_preset=&#8221;default&#8221; global_colors_info=&#8221;{}&#8221; theme_builder_area=&#8221;post_content&#8221;][et_pb_column type=&#8221;4_4&#8243; _builder_version=&#8221;4.27.4&#8243; _module_preset=&#8221;default&#8221; global_colors_info=&#8221;{}&#8221; theme_builder_area=&#8221;post_content&#8221;][et_pb_text _builder_version=&#8221;4.27.4&#8243; _module_preset=&#8221;default&#8221; hover_enabled=&#8221;0&#8243; global_colors_info=&#8221;{}&#8221; theme_builder_area=&#8221;post_content&#8221; sticky_enabled=&#8221;0&#8243;]<\/p>\n<h2><b>Origins and fundamental principles<\/b><\/h2>\n<h3><b>Meaning of &#8220;Hoshin Kanri&#8221; in Japanese<\/b><\/h3>\n<p><span style=\"font-weight: 400;\">The term <\/span><b>Hoshin Kanri<\/b><span style=\"font-weight: 400;\"> is composed of two Japanese words:<\/span><\/p>\n<ul>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><b>&#8220;Hoshin&#8221;<\/b><span style=\"font-weight: 400;\"> (\u65b9\u91dd) means &#8220;direction&#8221; or &#8220;compass&#8221;.<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><b>&#8220;Kanri<\/b><span style=\"font-weight: 400;\"> (\u7ba1\u7406) means &#8220;management&#8221; or &#8220;steering&#8221;.<\/span><\/li>\n<\/ul>\n<p>Together, they can be translated as \u201csteering by direction\u201d or \u201cvision-driven management.\u201d Beyond the literal translation, the strategic meaning of the term refers to an organization\u2019s ability to transform a long-term vision into clear action plans at all hierarchical levels. <\/p>\n<h3><b>The foundations of breakthrough management<\/b><\/h3>\n<p>Unlike continuous improvement (Kaizen), which focuses on incremental gains, Hoshin Kanri introduces the concept of strategic breakthrough. This refers to an ambitious goal\u2014often a break from the organization\u2019s usual practices\u2014that requires collective commitment and genuine transformation. <\/p>\n<p>Example: a company aiming to double its OEE within 3 years will need to rethink its processes, tools, and cross-team collaboration.<\/p>\n<h3><b>Reporting to Lean Management and Continuous Improvement<\/b><\/h3>\n<p>The Hoshin Kanri method was born in a Japanese industrial context influenced by Lean management and the PDCA cycle. It fully integrates Lean principles\u2014waste elimination, empowerment, continuous improvement\u2014while adding a strong strategic layer. This makes it possible to provide clear direction to performance optimization efforts.  <\/p>\n<p><span style=\"font-weight: 400;\">\ud83e\udde9 <\/span><b>Myth vs. reality<\/b><b><br \/><\/b><span style=\"font-weight: 400;\">\u274c Hoshin Kanri is a cumbersome method reserved for large companies.<\/span><span style=\"font-weight: 400;\"><br \/><\/span><span style=\"font-weight: 400;\">\u2705 It is perfectly applicable to SMEs with a clear vision and a desire for strategic structuring.<\/span><\/p>\n<p>[\/et_pb_text][\/et_pb_column][\/et_pb_row][et_pb_row _builder_version=&#8221;4.27.4&#8243; _module_preset=&#8221;default&#8221; global_colors_info=&#8221;{}&#8221; theme_builder_area=&#8221;post_content&#8221;][et_pb_column type=&#8221;4_4&#8243; _builder_version=&#8221;4.27.4&#8243; _module_preset=&#8221;default&#8221; global_colors_info=&#8221;{}&#8221; theme_builder_area=&#8221;post_content&#8221;][et_pb_text _builder_version=&#8221;4.27.4&#8243; _module_preset=&#8221;default&#8221; hover_enabled=&#8221;0&#8243; global_colors_info=&#8221;{}&#8221; theme_builder_area=&#8221;post_content&#8221; sticky_enabled=&#8221;0&#8243;]<\/p>\n<h2><b>Objectives and benefits of the method<\/b><\/h2>\n<h3><b>Aligning strategy and operational execution<\/b><\/h3>\n<p>At the heart of the Hoshin method lies a cascade of objectives: the strategic vision is translated into concrete priorities at every level. This helps prevent the common disconnect between top management\u2019s intentions and the daily work of teams. Everyone knows what needs to be done, why it matters, and what results are expected.  <\/p>\n<h3><b>Creating a Culture of Engagement and Continuous Improvement<\/b><\/h3>\n<p>Hoshin Kanri promotes transparency, communication, and collective ownership of plans. Through mechanisms such as Catchball, exchanges between hierarchical levels strengthen collaboration. A culture of feedback and visual management gradually takes root within the organization.  <\/p>\n<h3><b>Concrete results in the industry<\/b><\/h3>\n<p><span style=\"font-weight: 400;\">Industrial companies that have adopted Hoshin Kanri find :<\/span><\/p>\n<ul>\n<li style=\"font-weight: 400;\" aria-level=\"1\">An increase in TRS (up to +15 pts)<\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\">Reduced processing times<\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\">Improved KPI tracking<\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\">Fewer operational &#8220;irritants&#8221; (stoppages, drifts, oversights)<\/li>\n<\/ul>\n<p><span style=\"font-weight: 400;\">\ud83e\udde9 <\/span><b>Key benefit<\/b><b><br \/><\/b>Hoshin Kanri transforms strategy into a measurable, shared action plan, making it easier to align the whole organization around concrete, realistic objectives.<\/p>\n<p>[\/et_pb_text][\/et_pb_column][\/et_pb_row][et_pb_row _builder_version=&#8221;4.27.4&#8243; _module_preset=&#8221;default&#8221; global_colors_info=&#8221;{}&#8221; theme_builder_area=&#8221;post_content&#8221;][et_pb_column type=&#8221;4_4&#8243; _builder_version=&#8221;4.27.4&#8243; _module_preset=&#8221;default&#8221; global_colors_info=&#8221;{}&#8221; theme_builder_area=&#8221;post_content&#8221;][et_pb_text _builder_version=&#8221;4.27.4&#8243; _module_preset=&#8221;default&#8221; hover_enabled=&#8221;0&#8243; global_colors_info=&#8221;{}&#8221; theme_builder_area=&#8221;post_content&#8221; sticky_enabled=&#8221;0&#8243;]<\/p>\n<h2><b>Implementing Hoshin Kanri in your company<\/b><\/h2>\n<h3><b>Preparing the organization and defining the vision<\/b><\/h3>\n<p>First and foremost, the implementation of Hoshin Kanri begins with a strategic diagnosis: this involves assessing the current state of the organization, identifying the obstacles to performance and clarifying medium- and long-term priorities. This work involves both management and operational staff. <\/p>\n<p>Once this assessment has been made, the company can formalize its vision. This vision must be shared, concrete and meaningful. It must be based on the organization&#8217;s values and mission, and project an ambitious course over several years. It is this vision that will guide every stage of the Hoshin process.   <\/p>\n<p><span style=\"font-weight: 400;\">\ud83e\udde9 <\/span><b>Checklist<\/b><span style=\"font-weight: 400;\"> &#8211; Prerequisites before deploying Hoshin Kanri :<\/span><\/p>\n<ul>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">A clear strategic vision<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Mobilized management<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Committed middle leaders<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Reliable data to manage plans<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Time dedicated to monitoring and coordination<\/span><\/li>\n<\/ul>\n<h3><b>The 7 Key Steps of Hoshin Kanri Deployment<\/b><\/h3>\n<p>The method is based on a structured, sequenced cycle that ensures rigorous alignment of plans and actions:<\/p>\n<ol>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><b>Strategic vision<\/b><b><br \/><\/b><span style=\"font-weight: 400;\"> \u2192 Clarify the company&#8217;s long-term direction<\/span><span style=\"font-weight: 400;\"><\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><b>Long-term objectives<\/b><b><br \/><\/b><span style=\"font-weight: 400;\"> \u2192 Identify priority breakthrough areas over the next 3 to 5 years<\/span><span style=\"font-weight: 400;\"><\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><b>Annual objectives<\/b><b><br \/><\/b><span style=\"font-weight: 400;\"> \u2192 Define measurable targets for the year<\/span><span style=\"font-weight: 400;\"><\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><b>Hierarchical deployment<\/b><b><br \/><\/b><span style=\"font-weight: 400;\"> \u2192 Allocate responsibilities by management level<\/span><span style=\"font-weight: 400;\"><\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><b>Action plans<\/b><b><br \/><\/b><span style=\"font-weight: 400;\"> \u2192 Draw up concrete tasks, with milestones and indicators (KPIs)<\/span><span style=\"font-weight: 400;\"><\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><b>Monthly monitoring<\/b><b><br \/><\/b><span style=\"font-weight: 400;\"> \u2192 Analyze discrepancies, adjust actions, lead teams<\/span><span style=\"font-weight: 400;\"><\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><b>Annual review<\/b><b><br \/><\/b><span style=\"font-weight: 400;\"> \u2192 Assess results, capitalize on learning and restart the cycle<\/span><\/li>\n<\/ol>\n<p><span style=\"font-weight: 400;\">\ud83e\udde9 <\/span><b>Point de vigilance<\/b><b><br \/><\/b>Without a shared vision, the process becomes a mere planning exercise. Hoshin Kanri requires clear, embodied leadership. <\/p>\n<h3><b>How do you involve your teams in the process?<\/b><\/h3>\n<p>The success of Hoshin depends on the active participation of teams at all levels. It&#8217;s not a matter of &#8220;deploying from above&#8221;, but of co-constructing objectives through ongoing dialogue between decision-makers and operational staff. <\/p>\n<p>The use of visual tools (like the X-matrix) and collaborative mechanisms (like Catchball) facilitates ownership and gives visibility to priorities.<\/p>\n<p>Middle management plays a fundamental role here: it must embody the project, lead the steering rituals and circulate information in both directions.<\/p>\n<h3><b>Examples of successful implementation<\/b><\/h3>\n<p>A multi-site industrial company used Hoshin Kanri to structure its digital transformation plan. Thanks to the method, it was able to synchronize its strategic priorities with its technical projects, improve its OEE by +12 points in 18 months, and establish a visible results culture at all levels. <\/p>\n<p>Teams gained greater clarity, monthly reviews enabled rapid action to be taken on discrepancies, and the entire organization refocused on common objectives.<\/p>\n<p>[\/et_pb_text][\/et_pb_column][\/et_pb_row][et_pb_row _builder_version=&#8221;4.27.4&#8243; _module_preset=&#8221;default&#8221; global_colors_info=&#8221;{}&#8221; theme_builder_area=&#8221;post_content&#8221;][et_pb_column type=&#8221;4_4&#8243; _builder_version=&#8221;4.27.4&#8243; _module_preset=&#8221;default&#8221; global_colors_info=&#8221;{}&#8221; theme_builder_area=&#8221;post_content&#8221;][et_pb_text _builder_version=&#8221;4.27.4&#8243; _module_preset=&#8221;default&#8221; hover_enabled=&#8221;0&#8243; global_colors_info=&#8221;{}&#8221; theme_builder_area=&#8221;post_content&#8221; sticky_enabled=&#8221;0&#8243;]<\/p>\n<h2><b>The strategic tools of Hoshin Kanri<\/b><\/h2>\n<h3><b>The X-Matrix<\/b><\/h3>\n<p>The visual heart of the Hoshin system, the X-matrix displays the following on a single page:<\/p>\n<ul>\n<li style=\"font-weight: 400;\" aria-level=\"1\">La vision strat\u00e9gique<\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\">Long-term objectives<\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\">Annual targets<\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\">Key projects<\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\">Steering KPIs<\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\">The people in charge<\/li>\n<\/ul>\n<p>Each axis of the matrix crosses these elements to ensure the coherence and traceability of the strategic plan. It is designed to be shared and commented on as a team. <\/p>\n<p><span style=\"font-weight: 400;\">\ud83e\udde9 <\/span><b>Practical tip<\/b><b><br \/><\/b>Use color codes to link objectives to actions, and highlight sticking points.<\/p>\n<h3><b>Catchball for top-down and bottom-up communication<\/b><\/h3>\n<p>Catchball is a process of dialogue: objectives are &#8220;launched&#8221; by management, discussed and then adjusted with stakeholders. This allows : <\/p>\n<ul>\n<li style=\"font-weight: 400;\" aria-level=\"1\">Involve teams in building plans<\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\">Adjust objectives to suit the terrain<\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\">Unite levels around a common logic<\/li>\n<\/ul>\n<p><span style=\"font-weight: 400;\">\ud83e\udde9 <\/span><b>Expert advice<\/b><b><br \/><\/b><span style=\"font-weight: 400;\">Never launch an action without a Catchball. This will reduce buy-in and block momentum. <\/span><\/p>\n<h3><b>The PDCA cycle and continuous improvement<\/b><\/h3>\n<p>Hoshin is based on the PDCA cycle (Plan, Do, Check, Act). It structures the steps, ensuring that each action is planned, executed, checked and improved. This framework prevents drift and anchors improvement in managerial routine.  <\/p>\n<h3><b>Visual tools: A3 Thinking, visual management<\/b><\/h3>\n<p>A3 Thinking structures problem-solving on a single page. Coupled with visual aids (strategy wall, field indicators), it facilitates understanding of results, communication, and team autonomy in managing actions. <\/p>\n<p>[\/et_pb_text][et_pb_text _builder_version=&#8221;4.27.4&#8243; _module_preset=&#8221;default&#8221; hover_enabled=&#8221;0&#8243; global_colors_info=&#8221;{}&#8221; theme_builder_area=&#8221;post_content&#8221; sticky_enabled=&#8221;0&#8243;]<\/p>\n<h2><b>The strategic tools of Hoshin Kanri<\/b><\/h2>\n<h3><b>The X-Matrix<\/b><\/h3>\n<p>The visual heart of the Hoshin system, the X-matrix displays the following on a single page:<\/p>\n<ul>\n<li style=\"font-weight: 400;\" aria-level=\"1\">La vision strat\u00e9gique<\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\">Long-term objectives<\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\">Annual targets<\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\">Key projects<\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\">Steering KPIs<\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\">The people in charge<\/li>\n<\/ul>\n<p>Each axis of the matrix crosses these elements to ensure the coherence and traceability of the strategic plan. It is designed to be shared and commented on as a team. <\/p>\n<p><span style=\"font-weight: 400;\">\ud83e\udde9 <\/span><b>Practical tip<\/b><b><br \/><\/b>Use color codes to link objectives to actions, and highlight sticking points.<\/p>\n<h3><b>Catchball for top-down and bottom-up communication<\/b><\/h3>\n<p>Catchball is a process of dialogue: objectives are &#8220;launched&#8221; by management, discussed and then adjusted with stakeholders. This allows : <\/p>\n<ul>\n<li style=\"font-weight: 400;\" aria-level=\"1\">Involve teams in building plans<\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\">Adjust objectives to suit the terrain<\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\">Unite levels around a common logic<\/li>\n<\/ul>\n<p><span style=\"font-weight: 400;\">\ud83e\udde9 <\/span><b>Expert advice<\/b><b><br \/><\/b><span style=\"font-weight: 400;\">Never launch an action without a Catchball. This will reduce buy-in and block momentum. <\/span><\/p>\n<h3><b>The PDCA cycle and continuous improvement<\/b><\/h3>\n<p>Hoshin is based on the PDCA cycle (Plan, Do, Check, Act). It structures the steps, ensuring that each action is planned, executed, checked and improved. This framework prevents drift and anchors improvement in managerial routine.  <\/p>\n<h3><b>Visual tools: A3 Thinking, visual management<\/b><\/h3>\n<p>A3 Thinking structures problem-solving on a single page. Coupled with visual aids (strategy wall, field indicators), it facilitates understanding of results, communication, and<span style=\"font-weight: 400;\"> team autonomy in managing actions.<\/span> <\/p>\n<p>[\/et_pb_text][\/et_pb_column][\/et_pb_row][et_pb_row _builder_version=&#8221;4.27.4&#8243; _module_preset=&#8221;default&#8221; global_colors_info=&#8221;{}&#8221; theme_builder_area=&#8221;post_content&#8221;][et_pb_column type=&#8221;4_4&#8243; _builder_version=&#8221;4.27.4&#8243; _module_preset=&#8221;default&#8221; global_colors_info=&#8221;{}&#8221; theme_builder_area=&#8221;post_content&#8221;][et_pb_text _builder_version=&#8221;4.27.4&#8243; _module_preset=&#8221;default&#8221; hover_enabled=&#8221;0&#8243; global_colors_info=&#8221;{}&#8221; theme_builder_area=&#8221;post_content&#8221; sticky_enabled=&#8221;0&#8243;]<\/p>\n<h2><b>Limits, constraints and common errors<\/b><\/h2>\n<h3><b>Besoin d\u2019un fort engagement manag\u00e9rial<\/b><\/h3>\n<p>The Hoshin Kanri method cannot work without a clear commitment from top management. The strategic vision must be actively supported and translated into concrete priorities. An internal sponsor, often a member of the management committee, must guarantee continuity and consistency of deployment.  <\/p>\n<h3><b>Time and resources to anticipate<\/b><\/h3>\n<p>Implementing Hoshin requires a significant initial investment. Training, collaborative workshops, structuring indicators, running meetings: each stage requires time, appropriate tools and a sustained level of coordination, especially in the first year. <\/p>\n<h3><b>Risks of complexity or poorly controlled rigidity<\/b><\/h3>\n<p>Some organizations over-design the method: accumulation of KPIs, excessive control, multiplication of validation levels. This can lead to a loss of meaning, or even rejection of the process by teams. <\/p>\n<h3><b>Examples of failures to avoid<\/b><\/h3>\n<p>Common pitfalls include starting without a clear vision, stopping after a few months for lack of regular management, or entrusting the method to a single department isolated from the rest of the company.<\/p>\n<p><b>\ud83e\udde9 Common mistakes<\/b><b><br \/><\/b>Thinking that Hoshin Kanri is simply a reporting tool.<br \/>\u274c It&#8217;s actually a complete strategic management system, which structures the company&#8217;s actions on several levels, over the long term.<\/p>\n<p>[\/et_pb_text][\/et_pb_column][\/et_pb_row][et_pb_row _builder_version=&#8221;4.27.4&#8243; _module_preset=&#8221;default&#8221; global_colors_info=&#8221;{}&#8221; theme_builder_area=&#8221;post_content&#8221;][et_pb_column type=&#8221;4_4&#8243; _builder_version=&#8221;4.27.4&#8243; _module_preset=&#8221;default&#8221; global_colors_info=&#8221;{}&#8221; theme_builder_area=&#8221;post_content&#8221;][et_pb_text _builder_version=&#8221;4.27.4&#8243; _module_preset=&#8221;default&#8221; hover_enabled=&#8221;0&#8243; global_colors_info=&#8221;{}&#8221; theme_builder_area=&#8221;post_content&#8221; sticky_enabled=&#8221;0&#8243;]<\/p>\n<h2><b>Integrate Hoshin Kanri with TEEPTRAK solutions<\/b><\/h2>\n<h3><b>How do our tools facilitate strategic alignment?<\/b><\/h3>\n<p>At TEEPTRAK, we believe that the Hoshin method is most effective when based on reliable data that is accessible in real time, and easy to interpret. Our solutions connect strategic objectives with operational performance indicators, via visual and customizable dashboards. <\/p>\n<h3><b>Example of OEE monitoring in a Hoshin Kanri logic<\/b><\/h3>\n<p>At a plant in the agri-food sector, the implementation of our PerfTrak system enabled the OEE per line to be linked directly to the annual objectives defined in the Hoshin matrix. The project team was able to monitor deviations day by day, adjust action plans, and engage operators thanks to a clear visualization of progress. <\/p>\n<h3><b>Measurable ROI, real-time management and team involvement<\/b><\/h3>\n<p>Our tools bring strategic management to life: each manager visualizes his or her objectives, monitors KPIs, identifies deviations and acts accordingly. The result: time-saving reporting, improved coordination, and measurable results from the very first months. <\/p>\n<h3><b>Our ready-to-use, field-compatible solutions<\/b><\/h3>\n<p>Our systems are plug &amp; play, deployable in less than an hour, with no disruption to production. Interoperable with any equipment, they can be easily integrated into a Hoshin approach, whatever the organization&#8217;s digital maturity. <\/p>\n<p><span style=\"font-weight: 400;\">\ud83e\udde9 <\/span><b>Key figure<\/b><b><br \/><\/b>+29% increase in production at a customer plant after alignment via PerfTrak.<\/p>\n<p>[\/et_pb_text][\/et_pb_column][\/et_pb_row][et_pb_row _builder_version=&#8221;4.27.4&#8243; _module_preset=&#8221;default&#8221; global_colors_info=&#8221;{}&#8221; theme_builder_area=&#8221;post_content&#8221;][et_pb_column type=&#8221;4_4&#8243; _builder_version=&#8221;4.27.4&#8243; _module_preset=&#8221;default&#8221; global_colors_info=&#8221;{}&#8221; theme_builder_area=&#8221;post_content&#8221;][et_pb_text _builder_version=&#8221;4.27.4&#8243; _module_preset=&#8221;default&#8221; global_colors_info=&#8221;{}&#8221; theme_builder_area=&#8221;post_content&#8221;]<\/p>\n<h2><b>FAQ &#8211; Frequently asked questions about Hoshin Kanri<\/b><\/h2>\n<p>[\/et_pb_text][et_pb_accordion _builder_version=&#8221;4.27.4&#8243; _module_preset=&#8221;default&#8221; global_colors_info=&#8221;{}&#8221; theme_builder_area=&#8221;post_content&#8221;][et_pb_accordion_item title=&#8221;Qu\u2019est-ce que l\u2019outil Hoshin Kanri ?&#8221; open=&#8221;on&#8221; _builder_version=&#8221;4.27.4&#8243; _module_preset=&#8221;default&#8221; global_colors_info=&#8221;{}&#8221; theme_builder_area=&#8221;post_content&#8221;]<\/p>\n<p><span style=\"font-weight: 400;\">It is a <\/span><b>strategic steering framework<\/b><span style=\"font-weight: 400;\"> that helps link the <\/span><b>corporate vision<\/b><span style=\"font-weight: 400;\"> to concrete action. It combines  <\/span><b>visual tools<\/b><span style=\"font-weight: 400;\"> like the X-matrix with a collaborative <\/span><b>collaborative process<\/b><span style=\"font-weight: 400;\"> to ensure consistency between strategy and the day-to-day work of teams.<\/span><\/p>\n<p>[\/et_pb_accordion_item][et_pb_accordion_item title=&#8221;What does Hoshin mean in Japanese?&#8221; _builder_version=&#8221;4.27.4&#8243; _module_preset=&#8221;default&#8221; global_colors_info=&#8221;{}&#8221; theme_builder_area=&#8221;post_content&#8221; open=&#8221;off&#8221;]<\/p>\n<p><span style=\"font-weight: 400;\">&#8220;Hoshin&#8221; translates as <\/span><b>&#8220;directional needle<\/b><span style=\"font-weight: 400;\"> or <\/span><b>&#8220;strategic compass<\/b><span style=\"font-weight: 400;\">. This term expresses the idea of guiding the organization in a specific direction. Combined with &#8220;Kanri&#8221; (management), it becomes a  <\/span><b>management method<\/b><span style=\"font-weight: 400;\"> focused on long-term orientation and collective alignment.<\/span><\/p>\n<p>[\/et_pb_accordion_item][et_pb_accordion_item title=&#8221;What&apos;s the difference between Hoshin Kanri and conventional strategic deployment?&#8221; _builder_version=&#8221;4.27.4&#8243; _module_preset=&#8221;default&#8221; global_colors_info=&#8221;{}&#8221; theme_builder_area=&#8221;post_content&#8221; open=&#8221;off&#8221;]<\/p>\n<p><span style=\"font-weight: 400;\">The Hoshin Kanri focuses on the <\/span><b>co-construction of plans<\/b><span style=\"font-weight: 400;\">continuous <\/span><b>continuous feedback<\/b><span style=\"font-weight: 400;\"> and <\/span><b>team empowerment<\/b><span style=\"font-weight: 400;\">. In contrast to top-down deployment, it relies on adjustment loops and a strong <\/span><b>interaction between hierarchical<\/b><span style=\"font-weight: 400;\"> through the Catchball process.<\/span><\/p>\n<p>[\/et_pb_accordion_item][et_pb_accordion_item title=&#8221;What is breakthrough enhancement?&#8221; _builder_version=&#8221;4.27.4&#8243; _module_preset=&#8221;default&#8221; global_colors_info=&#8221;{}&#8221; theme_builder_area=&#8221;post_content&#8221; open=&#8221;off&#8221;]<\/p>\n<p><span style=\"font-weight: 400;\">Breakthrough enhancement aims for ambitious <\/span><b>ambitious results<\/b><span style=\"font-weight: 400;\">It often breaks with current practices. It is distinguished from incremental progress by its strategic scope and its  <\/span><b>lasting impact<\/b><span style=\"font-weight: 400;\">This is a key factor in the success of any project, provided it is properly implemented, planned and monitored over several annual cycles.<\/span><\/p>\n<p>[\/et_pb_accordion_item][\/et_pb_accordion][\/et_pb_column][\/et_pb_row][et_pb_row _builder_version=&#8221;4.27.4&#8243; _module_preset=&#8221;default&#8221; global_colors_info=&#8221;{}&#8221; theme_builder_area=&#8221;post_content&#8221;][et_pb_column type=&#8221;4_4&#8243; _builder_version=&#8221;4.27.4&#8243; _module_preset=&#8221;default&#8221; global_colors_info=&#8221;{}&#8221; theme_builder_area=&#8221;post_content&#8221;][et_pb_text _builder_version=&#8221;4.27.4&#8243; _module_preset=&#8221;default&#8221; hover_enabled=&#8221;0&#8243; global_colors_info=&#8221;{}&#8221; theme_builder_area=&#8221;post_content&#8221; sticky_enabled=&#8221;0&#8243;]<\/p>\n<h2><b>From strategic direction to concrete action<\/b><\/h2>\n<h3><b>Key Takeaways on Hoshin Kanri<\/b><\/h3>\n<p>Hoshin Kanri is much more than a tool: it&#8217;s a complete strategic management method, enabling vision, priorities and actions to be aligned in a structured way. It promotes coherence, clarity and collective performance. <\/p>\n<h3><b>A powerful method for linking vision and action<\/b><\/h3>\n<p>Accessible, progressive, and applicable to all types of organizations, it is particularly well-suited for industrial companies looking to strengthen their strategic management and engage their teams in a continuous improvement mindset.<\/p>\n<h3><b>We support you in your industrial strategy<\/b><\/h3>\n<p>At TEEPTRAK, we help you to implement this approach through operational tools connected to the field.<span style=\"font-weight: 400;\"><br \/><\/span><span style=\"font-weight: 400;\">\u27a1\ufe0f <\/span><a href=\"https:\/\/teeptrak.com\/en\/contact-teeptrak\/\"><b>Request a demo<\/b><\/a><span style=\"font-weight: 400;\">Discover our <\/span><a href=\"https:\/\/teeptrak.com\/en\/teeptrak-academy\/\"><b>Academy<\/b><\/a><span style=\"font-weight: 400;\"> or talk to our experts to unleash the potential of your strategy.<\/span><\/p>\n<p>\ud83e\udde9 <span style=\"font-weight: 400;\">E<\/span><b>xpert advice<\/b><b><br \/><\/b>Start small: pilot the method on a team or a production line before extending it to the whole company.<\/p>\n<p>[\/et_pb_text][\/et_pb_column][\/et_pb_row][\/et_pb_section]<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Introduction What is the Hoshin Kanri method? The Hoshin Kanri method, also known as \u201cpolicy deployment\u201d or \u201cmanagement by breakthrough\u201d, is a strategic planning process aimed at aligning a company\u2019s goals with concrete actions carried out on the ground. It is based on a structured approach that translates the long-term vision into annual action plans, [&hellip;]<\/p>\n","protected":false},"author":7,"featured_media":50284,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_et_pb_use_builder":"on","_et_pb_old_content":"","_et_gb_content_width":"","ai_seo_title":"","ai_meta_description":"","ai_focus_keyword":"","footnotes":""},"categories":[101,142],"tags":[],"class_list":["post-50367","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-industrial-performance","category-lean-manufacturing-en"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.3 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Hoshin Kanri: Understanding and Applying the Method for a High-Performance Industrial Strategy - TEEPTRAK - Connect to your industrial potential<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/teeptrak.com\/en\/hoshin-kanri\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Hoshin Kanri: Understanding and Applying the Method for a High-Performance Industrial Strategy - TEEPTRAK - Connect to your industrial potential\" \/>\n<meta property=\"og:url\" content=\"https:\/\/teeptrak.com\/en\/hoshin-kanri\/\" \/>\n<meta property=\"og:site_name\" content=\"TEEPTRAK - Connect to your industrial potential\" \/>\n<meta property=\"article:published_time\" content=\"2025-07-09T11:51:52+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2025-11-28T12:23:23+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/teeptrak.com\/wp-content\/uploads\/2025\/07\/adjusting-settings-of-machine-operating-factory-2025-03-18-20-53-52-utc-scaled.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"2560\" \/>\n\t<meta property=\"og:image:height\" content=\"1707\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Agathe Lecomte\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Agathe Lecomte\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"14 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/teeptrak.com\\\/en\\\/hoshin-kanri\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/teeptrak.com\\\/en\\\/hoshin-kanri\\\/\"},\"author\":{\"name\":\"Agathe Lecomte\",\"@id\":\"https:\\\/\\\/teeptrak.com\\\/en\\\/#\\\/schema\\\/person\\\/6b5caaa2cd2cf6b977542390d699e2f7\"},\"headline\":\"Hoshin Kanri: Understanding and Applying the Method for a High-Performance Industrial Strategy\",\"datePublished\":\"2025-07-09T11:51:52+00:00\",\"dateModified\":\"2025-11-28T12:23:23+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/teeptrak.com\\\/en\\\/hoshin-kanri\\\/\"},\"wordCount\":2927,\"publisher\":{\"@id\":\"https:\\\/\\\/teeptrak.com\\\/en\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/teeptrak.com\\\/en\\\/hoshin-kanri\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/teeptrak.com\\\/wp-content\\\/uploads\\\/2025\\\/07\\\/adjusting-settings-of-machine-operating-factory-2025-03-18-20-53-52-utc-scaled.jpg\",\"articleSection\":[\"Industrial Performance\",\"Lean Manufacturing\"],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/teeptrak.com\\\/en\\\/hoshin-kanri\\\/\",\"url\":\"https:\\\/\\\/teeptrak.com\\\/en\\\/hoshin-kanri\\\/\",\"name\":\"Hoshin Kanri: Understanding and Applying the Method for a High-Performance Industrial Strategy - TEEPTRAK - Connect to your industrial potential\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/teeptrak.com\\\/en\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/teeptrak.com\\\/en\\\/hoshin-kanri\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/teeptrak.com\\\/en\\\/hoshin-kanri\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/teeptrak.com\\\/wp-content\\\/uploads\\\/2025\\\/07\\\/adjusting-settings-of-machine-operating-factory-2025-03-18-20-53-52-utc-scaled.jpg\",\"datePublished\":\"2025-07-09T11:51:52+00:00\",\"dateModified\":\"2025-11-28T12:23:23+00:00\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/teeptrak.com\\\/en\\\/hoshin-kanri\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/teeptrak.com\\\/en\\\/hoshin-kanri\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/teeptrak.com\\\/en\\\/hoshin-kanri\\\/#primaryimage\",\"url\":\"https:\\\/\\\/teeptrak.com\\\/wp-content\\\/uploads\\\/2025\\\/07\\\/adjusting-settings-of-machine-operating-factory-2025-03-18-20-53-52-utc-scaled.jpg\",\"contentUrl\":\"https:\\\/\\\/teeptrak.com\\\/wp-content\\\/uploads\\\/2025\\\/07\\\/adjusting-settings-of-machine-operating-factory-2025-03-18-20-53-52-utc-scaled.jpg\",\"width\":2560,\"height\":1707,\"caption\":\"Adjusting settings of machine, operating. Factory worker is indoors with hard hat.\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/teeptrak.com\\\/en\\\/hoshin-kanri\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Accueil\",\"item\":\"https:\\\/\\\/teeptrak.com\\\/en\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Hoshin Kanri: Understanding and Applying the Method for a High-Performance Industrial Strategy\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/teeptrak.com\\\/en\\\/#website\",\"url\":\"https:\\\/\\\/teeptrak.com\\\/en\\\/\",\"name\":\"TEEPTRAK\",\"description\":\"TEEPTRAK official website - OEE\",\"publisher\":{\"@id\":\"https:\\\/\\\/teeptrak.com\\\/en\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/teeptrak.com\\\/en\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/teeptrak.com\\\/en\\\/#organization\",\"name\":\"TEEPTRAK\",\"url\":\"https:\\\/\\\/teeptrak.com\\\/en\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/teeptrak.com\\\/en\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/teeptrak.com\\\/wp-content\\\/uploads\\\/2023\\\/05\\\/cropped-Capture-decran-2023-05-04-112832.png\",\"contentUrl\":\"https:\\\/\\\/teeptrak.com\\\/wp-content\\\/uploads\\\/2023\\\/05\\\/cropped-Capture-decran-2023-05-04-112832.png\",\"width\":512,\"height\":512,\"caption\":\"TEEPTRAK\"},\"image\":{\"@id\":\"https:\\\/\\\/teeptrak.com\\\/en\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.linkedin.com\\\/company\\\/teeptrak\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/teeptrakinternational\\\/\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/teeptrak.com\\\/en\\\/#\\\/schema\\\/person\\\/6b5caaa2cd2cf6b977542390d699e2f7\",\"name\":\"Agathe Lecomte\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/1c84ce7fce1ee169a2554d8d31ef8a5b117809e2b2961709396a1c145b3d23ae?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/1c84ce7fce1ee169a2554d8d31ef8a5b117809e2b2961709396a1c145b3d23ae?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/1c84ce7fce1ee169a2554d8d31ef8a5b117809e2b2961709396a1c145b3d23ae?s=96&d=mm&r=g\",\"caption\":\"Agathe Lecomte\"},\"url\":\"https:\\\/\\\/teeptrak.com\\\/en\\\/author\\\/agathe\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Hoshin Kanri: Understanding and Applying the Method for a High-Performance Industrial Strategy - TEEPTRAK - Connect to your industrial potential","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/teeptrak.com\/en\/hoshin-kanri\/","og_locale":"en_US","og_type":"article","og_title":"Hoshin Kanri: Understanding and Applying the Method for a High-Performance Industrial Strategy - TEEPTRAK - Connect to your industrial potential","og_url":"https:\/\/teeptrak.com\/en\/hoshin-kanri\/","og_site_name":"TEEPTRAK - Connect to your industrial potential","article_published_time":"2025-07-09T11:51:52+00:00","article_modified_time":"2025-11-28T12:23:23+00:00","og_image":[{"width":2560,"height":1707,"url":"https:\/\/teeptrak.com\/wp-content\/uploads\/2025\/07\/adjusting-settings-of-machine-operating-factory-2025-03-18-20-53-52-utc-scaled.jpg","type":"image\/jpeg"}],"author":"Agathe Lecomte","twitter_card":"summary_large_image","twitter_misc":{"Written by":"Agathe Lecomte","Est. reading time":"14 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/teeptrak.com\/en\/hoshin-kanri\/#article","isPartOf":{"@id":"https:\/\/teeptrak.com\/en\/hoshin-kanri\/"},"author":{"name":"Agathe Lecomte","@id":"https:\/\/teeptrak.com\/en\/#\/schema\/person\/6b5caaa2cd2cf6b977542390d699e2f7"},"headline":"Hoshin Kanri: Understanding and Applying the Method for a High-Performance Industrial Strategy","datePublished":"2025-07-09T11:51:52+00:00","dateModified":"2025-11-28T12:23:23+00:00","mainEntityOfPage":{"@id":"https:\/\/teeptrak.com\/en\/hoshin-kanri\/"},"wordCount":2927,"publisher":{"@id":"https:\/\/teeptrak.com\/en\/#organization"},"image":{"@id":"https:\/\/teeptrak.com\/en\/hoshin-kanri\/#primaryimage"},"thumbnailUrl":"https:\/\/teeptrak.com\/wp-content\/uploads\/2025\/07\/adjusting-settings-of-machine-operating-factory-2025-03-18-20-53-52-utc-scaled.jpg","articleSection":["Industrial Performance","Lean Manufacturing"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/teeptrak.com\/en\/hoshin-kanri\/","url":"https:\/\/teeptrak.com\/en\/hoshin-kanri\/","name":"Hoshin Kanri: Understanding and Applying the Method for a High-Performance Industrial Strategy - TEEPTRAK - Connect to your industrial potential","isPartOf":{"@id":"https:\/\/teeptrak.com\/en\/#website"},"primaryImageOfPage":{"@id":"https:\/\/teeptrak.com\/en\/hoshin-kanri\/#primaryimage"},"image":{"@id":"https:\/\/teeptrak.com\/en\/hoshin-kanri\/#primaryimage"},"thumbnailUrl":"https:\/\/teeptrak.com\/wp-content\/uploads\/2025\/07\/adjusting-settings-of-machine-operating-factory-2025-03-18-20-53-52-utc-scaled.jpg","datePublished":"2025-07-09T11:51:52+00:00","dateModified":"2025-11-28T12:23:23+00:00","breadcrumb":{"@id":"https:\/\/teeptrak.com\/en\/hoshin-kanri\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/teeptrak.com\/en\/hoshin-kanri\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/teeptrak.com\/en\/hoshin-kanri\/#primaryimage","url":"https:\/\/teeptrak.com\/wp-content\/uploads\/2025\/07\/adjusting-settings-of-machine-operating-factory-2025-03-18-20-53-52-utc-scaled.jpg","contentUrl":"https:\/\/teeptrak.com\/wp-content\/uploads\/2025\/07\/adjusting-settings-of-machine-operating-factory-2025-03-18-20-53-52-utc-scaled.jpg","width":2560,"height":1707,"caption":"Adjusting settings of machine, operating. Factory worker is indoors with hard hat."},{"@type":"BreadcrumbList","@id":"https:\/\/teeptrak.com\/en\/hoshin-kanri\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Accueil","item":"https:\/\/teeptrak.com\/en\/"},{"@type":"ListItem","position":2,"name":"Hoshin Kanri: Understanding and Applying the Method for a High-Performance Industrial Strategy"}]},{"@type":"WebSite","@id":"https:\/\/teeptrak.com\/en\/#website","url":"https:\/\/teeptrak.com\/en\/","name":"TEEPTRAK","description":"TEEPTRAK official website - OEE","publisher":{"@id":"https:\/\/teeptrak.com\/en\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/teeptrak.com\/en\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/teeptrak.com\/en\/#organization","name":"TEEPTRAK","url":"https:\/\/teeptrak.com\/en\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/teeptrak.com\/en\/#\/schema\/logo\/image\/","url":"https:\/\/teeptrak.com\/wp-content\/uploads\/2023\/05\/cropped-Capture-decran-2023-05-04-112832.png","contentUrl":"https:\/\/teeptrak.com\/wp-content\/uploads\/2023\/05\/cropped-Capture-decran-2023-05-04-112832.png","width":512,"height":512,"caption":"TEEPTRAK"},"image":{"@id":"https:\/\/teeptrak.com\/en\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.linkedin.com\/company\/teeptrak\/","https:\/\/www.linkedin.com\/company\/teeptrakinternational\/"]},{"@type":"Person","@id":"https:\/\/teeptrak.com\/en\/#\/schema\/person\/6b5caaa2cd2cf6b977542390d699e2f7","name":"Agathe Lecomte","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/secure.gravatar.com\/avatar\/1c84ce7fce1ee169a2554d8d31ef8a5b117809e2b2961709396a1c145b3d23ae?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/1c84ce7fce1ee169a2554d8d31ef8a5b117809e2b2961709396a1c145b3d23ae?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/1c84ce7fce1ee169a2554d8d31ef8a5b117809e2b2961709396a1c145b3d23ae?s=96&d=mm&r=g","caption":"Agathe Lecomte"},"url":"https:\/\/teeptrak.com\/en\/author\/agathe\/"}]}},"_links":{"self":[{"href":"https:\/\/teeptrak.com\/en\/wp-json\/wp\/v2\/posts\/50367","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/teeptrak.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/teeptrak.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/teeptrak.com\/en\/wp-json\/wp\/v2\/users\/7"}],"replies":[{"embeddable":true,"href":"https:\/\/teeptrak.com\/en\/wp-json\/wp\/v2\/comments?post=50367"}],"version-history":[{"count":9,"href":"https:\/\/teeptrak.com\/en\/wp-json\/wp\/v2\/posts\/50367\/revisions"}],"predecessor-version":[{"id":61477,"href":"https:\/\/teeptrak.com\/en\/wp-json\/wp\/v2\/posts\/50367\/revisions\/61477"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/teeptrak.com\/en\/wp-json\/wp\/v2\/media\/50284"}],"wp:attachment":[{"href":"https:\/\/teeptrak.com\/en\/wp-json\/wp\/v2\/media?parent=50367"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/teeptrak.com\/en\/wp-json\/wp\/v2\/categories?post=50367"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/teeptrak.com\/en\/wp-json\/wp\/v2\/tags?post=50367"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}