{"id":35582,"date":"2024-11-10T10:00:00","date_gmt":"2024-11-10T10:00:00","guid":{"rendered":"https:\/\/new.teeptrak.com\/tout-savoir-sur-la-total-productive-maintenance-tpm\/"},"modified":"2026-11-11T06:05:08","modified_gmt":"2026-11-11T06:05:08","slug":"all-know-how-about-total-productive-maintenance-tpm","status":"publish","type":"post","link":"https:\/\/teeptrak.com\/en\/all-know-how-about-total-productive-maintenance-tpm\/","title":{"rendered":"Everything you need to know about total productive maintenance"},"content":{"rendered":"<p>[et_pb_section fb_built=&#8221;1&#8243; _builder_version=&#8221;4.16&#8243; global_colors_info=&#8221;{}&#8221;][et_pb_row _builder_version=&#8221;4.16&#8243; background_size=&#8221;initial&#8221; background_position=&#8221;top_left&#8221; background_repeat=&#8221;repeat&#8221; custom_margin=&#8221;-39px|auto||auto||&#8221; custom_padding=&#8221;|||0px||&#8221; global_colors_info=&#8221;{}&#8221;][et_pb_column type=&#8221;4_4&#8243; _builder_version=&#8221;4.16&#8243; custom_padding=&#8221;|||&#8221; global_colors_info=&#8221;{}&#8221; custom_padding__hover=&#8221;|||&#8221;][et_pb_text _builder_version=&#8221;4.27.4&#8243; background_size=&#8221;initial&#8221; background_position=&#8221;top_left&#8221; background_repeat=&#8221;repeat&#8221; width=&#8221;100%&#8221; custom_padding=&#8221;|||1px||&#8221; hover_enabled=&#8221;0&#8243; global_colors_info=&#8221;{}&#8221; sticky_enabled=&#8221;0&#8243;]<\/p>\n<p><span style=\"font-weight: 400;\">Total Productive Maintenance (TPM) is a comprehensive approach to maximizing equipment efficiency. Total Productive Maintenance is a comprehensive approach to maximizing equipment efficiency by involving all employees in the maintenance process. By focusing on reducing breakdowns and losses, productive maintenance promotes organizational performance and productivity. It implements rigorous methods that increase quality and extend machine life, while reducing downtime.   <\/span><\/p>\n<h2><span style=\"font-weight: 400; font-size: xx-large;\">What is total productive maintenance?<\/span><\/h2>\n<h3><span style=\"font-weight: 400; font-size: xx-large;\">Definition and basic principles<\/span><\/h3>\n<p><span style=\"font-weight: 400;\">It&#8217;s a proactive maintenance management method, involving all employees, from operators to managers, in the management and maintenance of machines. The main aim is to reduce unplanned downtime and improve equipment performance by maintaining optimum quality levels throughout the production process. This approach eliminates losses due to breakdowns and inefficiencies.  <\/span><\/p>\n<h3><span style=\"font-weight: 400; font-size: xx-large;\">History of total productive maintenance<\/span><\/h3>\n<p><span style=\"font-weight: 400;\">Born in Japanese factories in the 1970s, this method was developed by Nippondenso, a Toyota supplier. Inspired by the concept of preventive maintenance, it rapidly evolved into a global equipment management method. The model then spread throughout the world, becoming an essential pillar of continuous improvement in many companies seeking to optimize their production.  <\/span><\/p>\n<h2><span style=\"font-weight: 400; font-size: xx-large;\">The pillars of total productive maintenance<\/span><\/h2>\n<h3><span style=\"font-weight: 400; font-size: xx-large;\">Case-by-case improvement<\/span><\/h3>\n<p><span style=\"font-weight: 400;\">Case-by-case improvement (Kaizen) is an essential pillar of Total Productive Maintenance. It involves analyzing production process data to identify and eliminate recurring or one-off problems affecting machine performance. Each improvement activity aims to reduce wasted time, breakdowns and inefficiencies, thus contributing to sustainable productivity gains.  <\/span><\/p>\n<h3><span style=\"font-weight: 400; font-size: xx-large;\">Autonomy<\/span><\/h3>\n<p><span style=\"font-weight: 400;\">Employee autonomy is crucial to total productive maintenance. Operators are specifically trained to carry out basic maintenance tasks on the equipment they use on a daily basis. This empowerment enables minor problems to be detected quickly, before they turn into costly breakdowns, while increasing team commitment and machine reliability.  <\/span><\/p>\n<h3><span style=\"font-weight: 400; font-size: xx-large;\">Quality maintenance<\/span><\/h3>\n<p><span style=\"font-weight: 400;\">Quality maintenance focuses on preventing defects by integrating control methods right from the early stages of production. The aim is to maintain a constant level of quality by identifying potential failures before they result in defects or breakdowns. This pillar reduces losses due to production errors and improves equipment reliability.  <\/span><\/p>\n<h3><span style=\"font-weight: 400; font-size: xx-large;\">Planned maintenance<\/span><\/h3>\n<p><span style=\"font-weight: 400;\">Planned maintenance consists in anticipating interventions on machines before they break down. By analyzing data on equipment uptime, companies can plan maintenance shutdowns at strategic times, minimizing production interruptions and guaranteeing business continuity. <\/span><\/p>\n<h3><span style=\"font-weight: 400; font-size: xx-large;\">Preventive equipment maintenance<\/span><\/h3>\n<p><span style=\"font-weight: 400;\">This pillar concerns maintenance actions carried out right from the equipment design stage, in order to reduce future problems. The aim is to integrate maintenance into the machine design phase to guarantee reliability and ease of maintenance. This approach avoids unscheduled downtime and extends the life of equipment right from the start.  <\/span><\/p>\n<h3><span style=\"font-weight: 400; font-size: xx-large;\">Safety, health and environment<\/span><\/h3>\n<p><span style=\"font-weight: 400;\">This pillar aims to ensure that equipment maintenance is carried out in a safe environment for employees. By reducing the risk of injury and guaranteeing safe working conditions, it helps to improve overall workplace safety, while complying with environmental and health standards. This helps prevent accidents and boosts team efficiency.  <\/span><\/p>\n<h2><span style=\"font-weight: 400; font-size: xx-large;\">Why adopt total productive maintenance in your organization?<\/span><\/h2>\n<h3><span style=\"font-weight: 400; font-size: xx-large;\">Objectives and benefits <\/span><\/h3>\n<p><span style=\"font-weight: 400;\">Total Productive Maintenance achieves a number of crucial objectives for any organization: improving equipment performance, reducing breakdowns and production losses, while guaranteeing better product quality. Benefits include reduced downtime, optimized work processes and improved employee commitment. By integrating TPM, the company optimizes machine utilization and improves overall productivity and profitability.  <\/span><\/p>\n<h2><span style=\"font-weight: 400; font-size: xx-large;\">Implementing total productive maintenance<\/span><\/h2>\n<h3><span style=\"font-weight: 400; font-size: xx-large;\">Steps to integration<\/span><\/h3>\n<p><span style=\"font-weight: 400;\">Integrating Total Productive Maintenance (TPM) into an organization involves several stages. First, it&#8217;s essential to train staff, especially operators, to get them involved in the project. Next, equipment data must be analyzed to identify recurring problems. Finally, an improvement plan is implemented with the collaboration of the teams to eliminate breakdowns, reduce production losses, and optimize processes.   <\/span><\/p>\n<h3><span style=\"font-weight: 400; font-size: xx-large;\">Tools and resources required<\/span><\/h3>\n<p><span style=\"font-weight: 400;\">Effective implementation of total productive maintenance requires maintenance management tools, such as equipment tracking software and performance indicators. Dedicated human resources for employee training are also crucial to ensure that every operator can contribute to machine maintenance. In addition to diagnostic tools, it&#8217;s important to have a committed team in place to anticipate and resolve problems before they lead to unplanned downtime.  <\/span><\/p>\n<h3><span style=\"font-weight: 400; font-size: xx-large;\">Practical application examples<\/span><\/h3>\n<p><span style=\"font-weight: 400;\">In an industrial production company, this can take the form of regular training for operators in the day-to-day upkeep of machines. For example, the implementation of planned preventive maintenance helps to reduce production stoppages due to breakdowns. Teams are organized into dedicated workgroups, responsible for the quality of each piece of equipment, which considerably improves overall performance and reduces losses.  <\/span><\/p>\n<h2><span style=\"font-weight: 400; font-size: xx-large;\">The benefits of this method<\/span><\/h2>\n<h3><span style=\"font-weight: 400; font-size: xx-large;\">Reducing Downtime<\/span><\/h3>\n<p><span style=\"font-weight: 400;\">One of the main benefits is the reduction in unplanned production stoppages. By optimizing equipment maintenance, companies reduce frequent breakdowns. This helps to reduce downtime and maintain a continuous flow of production. Better machine management ensures increased availability, enabling the organization to meet production deadlines and customer needs.   <\/span><\/p>\n<h3><span style=\"font-weight: 400; font-size: xx-large;\">Improving overall productivity<\/span><\/h3>\n<p><span style=\"font-weight: 400;\">Total Productive Maintenance leads to a significant improvement in productivity. By implementing efficient maintenance processes and involving every employee, companies can eliminate unnecessary losses. Maintenance teams and operators work together to detect problems before they affect production. This proactive approach helps optimize resources and use equipment more efficiently, improving overall performance.   <\/span><\/p>\n<h3><span style=\"font-weight: 400; font-size: xx-large;\">Impact on customer satisfaction<\/span><\/h3>\n<p><span style=\"font-weight: 400;\">By reducing breakdowns and quality losses in the production process, it has a direct impact on customer satisfaction. Products are delivered on time, with consistent quality, reinforcing customer confidence in the company. Proactive maintenance helps avoid delays, ensuring that production targets are met while meeting customer quality expectations.  <\/span><\/p>\n<h2><span style=\"font-weight: 400; font-size: xx-large;\">Total Productive Maintenance FAQ<\/span><\/h2>\n<h3><span style=\"font-weight: 400; font-size: xx-large;\">What is the TPM method?<\/span><\/h3>\n<p><span style=\"font-weight: 400;\">The TPM (Total Productive Maintenance) method is a management system designed to optimize equipment efficiency by involving all employees in machine maintenance. The aim is to improve production performance and quality by eliminating losses and reducing breakdowns. This process enables the company to maintain a high level of productivity and efficiency.  <\/span><\/p>\n<h3><span style=\"font-weight: 400; font-size: xx-large;\">Who invited him?<\/span><\/h3>\n<p><span style=\"font-weight: 400;\">TPM was developed by Japanese company Nippondenso, a key Toyota supplier, in the 1970s. The project was born of the need to reduce downtime and maximize equipment productivity. Since then, the method has spread throughout the world, becoming a benchmark for many companies seeking to improve their overall performance.  <\/span><\/p>\n<h3><span style=\"font-weight: 400; font-size: xx-large;\">What are the main pillars of this method?<\/span><\/h3>\n<p><span style=\"font-weight: 400;\">TPM is based on several essential pillars, including case-by-case improvement, operator autonomy, planned maintenance and quality maintenance. Other pillars include safety, health and environment, and equipment preventive maintenance. Each pillar contributes to an overall approach to maximizing machine performance and minimizing breakdowns.  <\/span><\/p>\n<h3><span style=\"font-weight: 400; font-size: xx-large;\">What is autonomous maintenance?<\/span><\/h3>\n<p><span style=\"font-weight: 400;\">Autonomous maintenance is one of the pillars of TPM, in which operators are trained to take on basic maintenance tasks on their own machines. This includes activities such as cleaning, inspecting and tightening components. By empowering employees at this level, companies can reduce unplanned downtime and improve equipment reliability, while increasing staff commitment.  <\/span><\/p>\n<p><span style=\"font-weight: 400;\"><\/span><\/p>\n<p>&nbsp;<\/p>\n<p><!-- \/divi:paragraph --><\/p>\n<p><span style=\"font-weight: 400; font-size: xx-large;\">Stay connected:<\/span><\/p>\n<p><span style=\"font-size: x-large;\"><span style=\"font-weight: 400;\"><\/span><\/span><\/p>\n<p><span style=\"font-weight: 400; font-size: large;\">Pour ne rien manquer de l&#8217;actualit\u00e9 de TEEPTRAK et de l\u2019industrie 4.0, suivez nous sur <\/span><span style=\"font-weight: 400; font-size: large;\"><a href=\"https:\/\/www.linkedin.com\/company\/5383287\/admin\/dashboard\/\" style=\"font-family: Roboto, sans-serif; font-size: 18px; color: #eb352b; font-weight: 400;\">LinkedIn<\/a><\/span><span style=\"font-weight: 400; font-size: large;\"> et <\/span><span style=\"color: #eb352b; font-weight: 400;\"><a href=\"https:\/\/www.youtube.com\/@teeptrak\">YouTube<\/a><\/span>.<span style=\"font-weight: 400; font-size: large;\"> Inscrivez-vous \u00e9galement \u00e0 notre newsletter pour recevoir le r\u00e9cap mensuel !<\/span><br \/><span style=\"font-weight: 400; font-size: large;\">Ceci pourrait \u00e9galement vous int\u00e9resser :<\/span><\/p>\n<p>&nbsp;<\/p>\n<ul>\n<li><a href=\"https:\/\/teeptrak.com\/en\/visual-management-improving-communication-and-performance\/\">Visual management: improving communication and performance<\/a><\/li>\n<li><a href=\"https:\/\/teeptrak.com\/en\/maximize-operational-efficiency-with-perftrak-the-power-of-lopc-ua-your-door\/\">Maximise operational efficiency with PerfTrak: The power of OPC UA at your fingertips<\/a><\/li>\n<li><a href=\"https:\/\/teeptrak.com\/en\/comprendre-le-lean-manufacturing-principes-outils-et-applications\/\">Understanding Lean Manufacturing: Principles, Tools and Applications<\/a><\/li>\n<li><a href=\"https:\/\/teeptrak.com\/en\/industrial-quality-principles-tools-and-practices\/\">Industrial Quality: Principles, Tools and Practices<\/a><\/li>\n<\/ul>\n<p>[\/et_pb_text][et_pb_text _builder_version=&#8221;4.27.2&#8243; _module_preset=&#8221;default&#8221; text_font=&#8221;|300|||||||&#8221; text_text_color=&#8221;#000000&#8243; text_font_size=&#8221;16px&#8221; header_2_font_size=&#8221;28px&#8221; locked=&#8221;off&#8221; global_colors_info=&#8221;{}&#8221;]<script type=\"application\/ld+json\">{\"@context\":\"https:\/\/schema.org\",\"@type\":\"FAQPage\",\"mainEntity\":[{\"@type\":\"Question\",\"name\":\"What is Total Productive Maintenance (TPM)?\",\"acceptedAnswer\":{\"@type\":\"Answer\",\"text\":\"TPM is a comprehensive maintenance approach involving all employees in equipment management. It focuses on reducing breakdowns and losses to maximize equipment efficiency, improve quality, and extend machine life while minimizing downtime.\"}},{\"@type\":\"Question\",\"name\":\"What are the main principles of TPM?\",\"acceptedAnswer\":{\"@type\":\"Answer\",\"text\":\"TPM is a proactive method that engages operators and managers in maintenance activities. Its primary aim is reducing unplanned downtime and improving equipment performance by maintaining quality levels throughout production while eliminating losses from breakdowns.\"}},{\"@type\":\"Question\",\"name\":\"Where did Total Productive Maintenance originate?\",\"acceptedAnswer\":{\"@type\":\"Answer\",\"text\":\"TPM was developed in Japanese factories during the 1970s by Nippondenso, a Toyota supplier. Inspired by preventive maintenance concepts, it evolved into a global equipment management method adopted by companies worldwide.\"}}]}<\/script>[\/et_pb_text][\/et_pb_column][\/et_pb_row][\/et_pb_section]<\/p>\n<p>[et_pb_section fb_built=&#8221;1&#8243; _builder_version=&#8221;4.27.4&#8243; _module_preset=&#8221;default&#8221; global_colors_info=&#8221;{}&#8221;][et_pb_row _builder_version=&#8221;4.27.4&#8243; _module_preset=&#8221;default&#8221; global_colors_info=&#8221;{}&#8221;][et_pb_column type=&#8221;4_4&#8243; _builder_version=&#8221;4.27.4&#8243; _module_preset=&#8221;default&#8221; global_colors_info=&#8221;{}&#8221;][et_pb_text _builder_version=&#8221;4.27.4&#8243; _module_preset=&#8221;default&#8221; global_colors_info=&#8221;{}&#8221;]<!-- seo-engine:content:158 --><\/p>\n<h2>Total Productive Maintenance (TPM): The 8 Pillars and Implementation Guide<\/h2>\n<p><strong>Total productive maintenance (TPM) is a plant-wide method that eliminates equipment losses by sharing care of machines between operators, maintenance, engineering and quality. It is organized into 8 pillars on a 5S foundation, and its results are measured with OEE and the six big losses.<\/strong><\/p>\n<p>The sections below go beyond the definition: the exact names and first deliverables of the 8 pillars of TPM, the seven steps of autonomous maintenance, a worked example that turns shift losses into pillar priorities, the five types of preventive maintenance, and a rollout checklist for a first model line.<\/p>\n<div class=\"se-key\">\n<p><strong>Key takeaways<\/strong><\/p>\n<ul>\n<li>TPM rests on 8 pillars and a 5S foundation, led by autonomous and planned maintenance.<\/li>\n<li>Every pillar targets specific losses among the six big losses that OEE measures.<\/li>\n<li>Losses ranked in minutes show which pillar to start with, not the lowest OEE factor.<\/li>\n<li>Preventive maintenance is one tool inside TPM, not a synonym for it.<\/li>\n<li>Starting on one model line with a measured baseline keeps TPM from becoming a cleaning campaign.<\/li>\n<\/ul>\n<\/div>\n<h2>The 8 pillars of TPM: what each one targets and delivers first<\/h2>\n<p>The 8 pillars of TPM, as structured by the Japan Institute of Plant Maintenance (JIPM), rest on a <strong>5S<\/strong> foundation: an organized, clean workplace where abnormalities become visible. The method shares its roots with <a href=\"https:\/\/teeptrak.com\/en\/comprendre-le-lean-manufacturing-principes-outils-et-applications\/\">lean manufacturing<\/a>, but its unit of improvement is the machine and its losses.<\/p>\n<table>\n<thead>\n<tr>\n<th>Pillar<\/th>\n<th>Losses it targets<\/th>\n<th>First deliverable on a pilot line<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td>Autonomous maintenance (Jishu Hozen)<\/td>\n<td>Deterioration caused by missing basic care<\/td>\n<td>Initial cleaning with a tagged list of abnormalities<\/td>\n<\/tr>\n<tr>\n<td>Planned maintenance<\/td>\n<td>Breakdowns and repeat failures<\/td>\n<td>Maintenance calendar built from failure history<\/td>\n<\/tr>\n<tr>\n<td>Focused improvement (Kobetsu Kaizen)<\/td>\n<td>Chronic losses such as setups and minor stops<\/td>\n<td>Loss tree and one improvement project per top loss<\/td>\n<\/tr>\n<tr>\n<td>Quality maintenance (Hinshitsu Hozen)<\/td>\n<td>Defects caused by equipment conditions<\/td>\n<td>Matrix linking each defect to the machine condition that causes it<\/td>\n<\/tr>\n<tr>\n<td>Early equipment management<\/td>\n<td>Problems designed into new machines<\/td>\n<td>Lessons-learned checklist for the next equipment purchase<\/td>\n<\/tr>\n<tr>\n<td>Training and education<\/td>\n<td>Skill gaps in operators and technicians<\/td>\n<td>Skills matrix per machine and per person<\/td>\n<\/tr>\n<tr>\n<td>Safety, health and environment<\/td>\n<td>Accidents and incidents<\/td>\n<td>Risk review of every cleaning and inspection task<\/td>\n<\/tr>\n<tr>\n<td>Office TPM<\/td>\n<td>Administrative delays that stop production<\/td>\n<td>Map of support processes that cause waiting, such as spare parts purchasing<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p>TPM pursues four zeros: zero breakdowns, zero minor stops and slow running, zero defects and zero accidents. These goals are directions, not short-term targets; they explain why each pillar exists.<\/p>\n<h2>Autonomous maintenance in practice: the 7 Jishu Hozen steps<\/h2>\n<p><strong>Autonomous maintenance<\/strong> is the pillar in which operators take over basic care of their own equipment: cleaning, inspection, lubrication and tightening. It is usually the first pillar launched, because it exposes hidden deterioration that no maintenance plan can fix from a desk.<\/p>\n<ol>\n<li><strong>Initial cleaning<\/strong>: cleaning is inspection; every abnormality found gets a tag and an owner.<\/li>\n<li><strong>Countermeasures for contamination sources and hard-to-reach areas<\/strong>: stop dirt at the source and make inspection points accessible.<\/li>\n<li><strong>Tentative cleaning, inspection and lubrication standards<\/strong>: a short visual standard per machine, with time allowed in the shift.<\/li>\n<li><strong>General inspection<\/strong>: operators are trained on machine subsystems, such as pneumatics, hydraulics, drives and fasteners.<\/li>\n<li><strong>Autonomous inspection<\/strong>: operators run the checklists; maintenance reviews them and removes duplicated tasks.<\/li>\n<li><strong>Standardization<\/strong>: workplace organization, changeover and quality standards are fixed and audited.<\/li>\n<li><strong>Full autonomous management<\/strong>: the team uses its own loss data to set improvement goals.<\/li>\n<\/ol>\n<p>The common failure at step 1 is a cleaning campaign with no follow-up of tags. If tags stay open for weeks, operators stop writing them, and the pillar loses credibility before step 3.<\/p>\n<aside class=\"se-magnet\" style=\"margin:32px 0;padding:22px 24px;border:1px solid #EBEBEB;border-left:5px solid #EB352C;border-radius:14px;background:#F5F6F5;display:flex;flex-wrap:wrap;gap:16px;align-items:center;justify-content:space-between\">\n<div style=\"flex:1 1 320px\">\n<div style=\"font-size:12px;letter-spacing:.12em;text-transform:uppercase;color:#EB352C;font-weight:700;margin-bottom:6px\">Free download<\/div>\n<div style=\"font-size:1.1em;font-weight:700;color:#232120\">Free MTBF and MTTR Calculator (Excel)<\/div>\n<\/div>\n<p><a href=\"https:\/\/teeptrak.com\/en\/free-mtbf-mttr-calculator-excel-template\/\" style=\"display:inline-block;background:#EB352C;color:#fff;padding:12px 22px;border-radius:8px;text-decoration:none;font-weight:700;white-space:nowrap\">Get the kit<\/a><\/aside>\n<h2>Measuring TPM with OEE: six big losses and a worked example<\/h2>\n<p>TPM is measured with <a href=\"https:\/\/teeptrak.com\/en\/understanding-the-full-meaning-of-oee-and-ope-to-improve-industrial-performance\/\">OEE<\/a>, because OEE splits time losses into the six big losses that the pillars attack.<\/p>\n<table>\n<thead>\n<tr>\n<th>Big loss<\/th>\n<th>OEE factor<\/th>\n<th>Main pillars<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td>Breakdowns<\/td>\n<td>Availability<\/td>\n<td>Autonomous and planned maintenance<\/td>\n<\/tr>\n<tr>\n<td>Setup and adjustment<\/td>\n<td>Availability<\/td>\n<td>Focused improvement with SMED<\/td>\n<\/tr>\n<tr>\n<td>Minor stops<\/td>\n<td>Performance<\/td>\n<td>Autonomous maintenance, focused improvement<\/td>\n<\/tr>\n<tr>\n<td>Reduced speed<\/td>\n<td>Performance<\/td>\n<td>Focused improvement, planned maintenance<\/td>\n<\/tr>\n<tr>\n<td>Startup rejects<\/td>\n<td>Quality<\/td>\n<td>Quality maintenance, SMED<\/td>\n<\/tr>\n<tr>\n<td>Production defects<\/td>\n<td>Quality<\/td>\n<td>Quality maintenance<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p>Suppose a filling line has 450 minutes of planned production time per shift. It loses 30 minutes to breakdowns, 40 to setups, 20 to minor stops, 25 to reduced speed, 5 to startup rejects and 6 to production defects, with rejects converted to minutes at the ideal cycle time.<\/p>\n<ul>\n<li>Availability: (450 &#8211; 70) \/ 450 = 380 \/ 450 = 0.84<\/li>\n<li>Performance: (380 &#8211; 45) \/ 380 = 335 \/ 380 = 0.88<\/li>\n<li>Quality: (335 &#8211; 11) \/ 335 = 324 \/ 335 = 0.97<\/li>\n<li>OEE: 324 \/ 450 = 0.72<\/li>\n<\/ul>\n<p>The ranking in minutes decides where to start: setups (40) come first, so focused improvement runs a SMED project on changeovers; breakdowns (30) come second, so autonomous maintenance starts on the asset that fails most often. The world-class reference popularized by Seiichi Nakajima within TPM is an OEE of 0.85, built from availability 0.90, performance 0.95 and quality 0.999. It is a target to steer toward, not an industry average to compare against.<\/p>\n<figure class=\"se-fig\" style=\"margin:0\"><svg xmlns=\"http:\/\/www.w3.org\/2000\/svg\" viewBox=\"0 0 1200 300\" width=\"100%\" role=\"img\" aria-label=\"Filling line OEE per shift\" style=\"display:block;max-width:100%;height:auto;margin:28px 0;border-radius:14px;\"><rect width=\"1200\" height=\"300\" rx=\"14\" fill=\"#FFFFFF\" stroke=\"#EBEBEB\"\/><text x=\"24\" y=\"44\" fill=\"#232120\" font-size=\"24\" font-weight=\"700\" font-family='Roboto,Open Sans,Segoe UI,Helvetica,Arial,sans-serif'>Filling line OEE per shift<\/text><g opacity=\"0\"><animate attributeName=\"opacity\" from=\"0\" to=\"1\" begin=\"0s\" dur=\"0.6s\" fill=\"freeze\"\/><rect x=\"24\" y=\"72\" width=\"270\" height=\"196\" rx=\"12\" fill=\"#F5F6F5\" stroke=\"#EBEBEB\"\/><rect x=\"24\" y=\"72\" width=\"270\" height=\"6\" rx=\"3\" fill=\"#EB352C\"\/><text x=\"159\" y=\"166\" text-anchor=\"middle\" fill=\"#EB352C\" font-size=\"52\" font-weight=\"800\" font-family='Roboto,Open Sans,Segoe UI,Helvetica,Arial,sans-serif'>0.84<\/text><text fill=\"#4B4846\" font-size=\"20\" text-anchor=\"middle\" font-family='Roboto,Open Sans,Segoe UI,Helvetica,Arial,sans-serif'><tspan x=\"159\" y=\"214\">Availability<\/tspan><\/text><\/g><g opacity=\"0\"><animate attributeName=\"opacity\" from=\"0\" to=\"1\" begin=\"0.15s\" dur=\"0.6s\" fill=\"freeze\"\/><rect x=\"318\" y=\"72\" width=\"270\" height=\"196\" rx=\"12\" fill=\"#F5F6F5\" stroke=\"#EBEBEB\"\/><rect x=\"318\" y=\"72\" width=\"270\" height=\"6\" rx=\"3\" fill=\"#EB352C\"\/><text x=\"453\" y=\"166\" text-anchor=\"middle\" fill=\"#EB352C\" font-size=\"52\" font-weight=\"800\" font-family='Roboto,Open Sans,Segoe UI,Helvetica,Arial,sans-serif'>0.88<\/text><text fill=\"#4B4846\" font-size=\"20\" text-anchor=\"middle\" font-family='Roboto,Open Sans,Segoe UI,Helvetica,Arial,sans-serif'><tspan x=\"453\" y=\"214\">Performance<\/tspan><\/text><\/g><g opacity=\"0\"><animate attributeName=\"opacity\" from=\"0\" to=\"1\" begin=\"0.3s\" dur=\"0.6s\" fill=\"freeze\"\/><rect x=\"612\" y=\"72\" width=\"270\" height=\"196\" rx=\"12\" fill=\"#F5F6F5\" stroke=\"#EBEBEB\"\/><rect x=\"612\" y=\"72\" width=\"270\" height=\"6\" rx=\"3\" fill=\"#EB352C\"\/><text x=\"747\" y=\"166\" text-anchor=\"middle\" fill=\"#EB352C\" font-size=\"52\" font-weight=\"800\" font-family='Roboto,Open Sans,Segoe UI,Helvetica,Arial,sans-serif'>0.97<\/text><text fill=\"#4B4846\" font-size=\"20\" text-anchor=\"middle\" font-family='Roboto,Open Sans,Segoe UI,Helvetica,Arial,sans-serif'><tspan x=\"747\" y=\"214\">Quality<\/tspan><\/text><\/g><g opacity=\"0\"><animate attributeName=\"opacity\" from=\"0\" to=\"1\" begin=\"0.44999999999999996s\" dur=\"0.6s\" fill=\"freeze\"\/><rect x=\"906\" y=\"72\" width=\"270\" height=\"196\" rx=\"12\" fill=\"#F5F6F5\" stroke=\"#EBEBEB\"\/><rect x=\"906\" y=\"72\" width=\"270\" height=\"6\" rx=\"3\" fill=\"#EB352C\"\/><text x=\"1041\" y=\"166\" text-anchor=\"middle\" fill=\"#EB352C\" font-size=\"52\" font-weight=\"800\" font-family='Roboto,Open Sans,Segoe UI,Helvetica,Arial,sans-serif'>0.72<\/text><text fill=\"#4B4846\" font-size=\"20\" text-anchor=\"middle\" font-family='Roboto,Open Sans,Segoe UI,Helvetica,Arial,sans-serif'><tspan x=\"1041\" y=\"214\">OEE<\/tspan><\/text><\/g><\/svg><\/figure>\n<figure class=\"se-fig\" style=\"margin:0\"><svg xmlns=\"http:\/\/www.w3.org\/2000\/svg\" viewBox=\"0 0 1200 452\" width=\"100%\" role=\"img\" aria-label=\"Six big losses on one shift\" style=\"display:block;max-width:100%;height:auto;margin:28px 0;border-radius:14px;\"><rect width=\"1200\" height=\"452\" rx=\"14\" fill=\"#FFFFFF\" stroke=\"#EBEBEB\"\/><text x=\"24\" y=\"44\" fill=\"#232120\" font-size=\"24\" font-weight=\"700\" font-family='Roboto,Open Sans,Segoe UI,Helvetica,Arial,sans-serif'>Six big losses on one shift<\/text><text x=\"24\" y=\"106\" fill=\"#4B4846\" font-size=\"19\" font-family='Roboto,Open Sans,Segoe UI,Helvetica,Arial,sans-serif'>Setups<\/text><rect x=\"330\" y=\"76\" width=\"720\" height=\"40\" rx=\"8\" fill=\"#F5F6F5\"\/><rect x=\"330\" y=\"76\" width=\"720\" height=\"40\" rx=\"8\" fill=\"#EB352C\"><animate attributeName=\"width\" from=\"0\" to=\"720\" dur=\"1s\" begin=\"0s\" fill=\"freeze\"\/><\/rect><text x=\"1066\" y=\"104\" fill=\"#232120\" font-size=\"20\" font-weight=\"700\" font-family='Roboto,Open Sans,Segoe UI,Helvetica,Arial,sans-serif'>40 min<\/text><text x=\"24\" y=\"164\" fill=\"#4B4846\" font-size=\"19\" font-family='Roboto,Open Sans,Segoe UI,Helvetica,Arial,sans-serif'>Breakdowns<\/text><rect x=\"330\" y=\"134\" width=\"720\" height=\"40\" rx=\"8\" fill=\"#F5F6F5\"\/><rect x=\"330\" y=\"134\" width=\"540\" height=\"40\" rx=\"8\" fill=\"#FF674C\"><animate attributeName=\"width\" from=\"0\" to=\"540\" dur=\"1s\" begin=\"0.1s\" fill=\"freeze\"\/><\/rect><text x=\"1066\" y=\"162\" fill=\"#232120\" font-size=\"20\" font-weight=\"700\" font-family='Roboto,Open Sans,Segoe UI,Helvetica,Arial,sans-serif'>30 min<\/text><text x=\"24\" y=\"222\" fill=\"#4B4846\" font-size=\"19\" font-family='Roboto,Open Sans,Segoe UI,Helvetica,Arial,sans-serif'>Reduced speed<\/text><rect x=\"330\" y=\"192\" width=\"720\" height=\"40\" rx=\"8\" fill=\"#F5F6F5\"\/><rect x=\"330\" y=\"192\" width=\"450\" height=\"40\" rx=\"8\" fill=\"#8B8885\"><animate attributeName=\"width\" from=\"0\" to=\"450\" dur=\"1s\" begin=\"0.2s\" fill=\"freeze\"\/><\/rect><text x=\"1066\" y=\"220\" fill=\"#232120\" font-size=\"20\" font-weight=\"700\" font-family='Roboto,Open Sans,Segoe UI,Helvetica,Arial,sans-serif'>25 min<\/text><text x=\"24\" y=\"280\" fill=\"#4B4846\" font-size=\"19\" font-family='Roboto,Open Sans,Segoe UI,Helvetica,Arial,sans-serif'>Minor stops<\/text><rect x=\"330\" y=\"250\" width=\"720\" height=\"40\" rx=\"8\" fill=\"#F5F6F5\"\/><rect x=\"330\" y=\"250\" width=\"360\" height=\"40\" rx=\"8\" fill=\"#8B8885\"><animate attributeName=\"width\" from=\"0\" to=\"360\" dur=\"1s\" begin=\"0.30000000000000004s\" fill=\"freeze\"\/><\/rect><text x=\"1066\" y=\"278\" fill=\"#232120\" font-size=\"20\" font-weight=\"700\" font-family='Roboto,Open Sans,Segoe UI,Helvetica,Arial,sans-serif'>20 min<\/text><text x=\"24\" y=\"338\" fill=\"#4B4846\" font-size=\"19\" font-family='Roboto,Open Sans,Segoe UI,Helvetica,Arial,sans-serif'>Defects<\/text><rect x=\"330\" y=\"308\" width=\"720\" height=\"40\" rx=\"8\" fill=\"#F5F6F5\"\/><rect x=\"330\" y=\"308\" width=\"108\" height=\"40\" rx=\"8\" fill=\"#8B8885\"><animate attributeName=\"width\" from=\"0\" to=\"108\" dur=\"1s\" begin=\"0.4s\" fill=\"freeze\"\/><\/rect><text x=\"1066\" y=\"336\" fill=\"#232120\" font-size=\"20\" font-weight=\"700\" font-family='Roboto,Open Sans,Segoe UI,Helvetica,Arial,sans-serif'>6 min<\/text><text x=\"24\" y=\"396\" fill=\"#4B4846\" font-size=\"19\" font-family='Roboto,Open Sans,Segoe UI,Helvetica,Arial,sans-serif'>Startup rejects<\/text><rect x=\"330\" y=\"366\" width=\"720\" height=\"40\" rx=\"8\" fill=\"#F5F6F5\"\/><rect x=\"330\" y=\"366\" width=\"90\" height=\"40\" rx=\"8\" fill=\"#8B8885\"><animate attributeName=\"width\" from=\"0\" to=\"90\" dur=\"1s\" begin=\"0.5s\" fill=\"freeze\"\/><\/rect><text x=\"1066\" y=\"394\" fill=\"#232120\" font-size=\"20\" font-weight=\"700\" font-family='Roboto,Open Sans,Segoe UI,Helvetica,Arial,sans-serif'>5 min<\/text><\/svg><\/figure>\n<h2>Preventive maintenance inside TPM: how it works and its 5 types<\/h2>\n<p><strong>Preventive maintenance<\/strong> is maintenance performed before failure, triggered by time, usage or measured condition, to lower the probability of breakdown. In TPM it sits mainly in the planned maintenance pillar, fed by the abnormalities that operators detect in autonomous maintenance. The phrase total preventive maintenance is a frequent mix-up: the method is total productive maintenance, and preventive maintenance is one of its tools.<\/p>\n<table>\n<thead>\n<tr>\n<th>Type<\/th>\n<th>Trigger<\/th>\n<th>Best fit<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td>Time-based<\/td>\n<td>Calendar interval<\/td>\n<td>Wear that follows time, such as seals or filters<\/td>\n<\/tr>\n<tr>\n<td>Usage-based<\/td>\n<td>Running hours or cycle counter<\/td>\n<td>Wear that follows activity, such as tooling and belts<\/td>\n<\/tr>\n<tr>\n<td>Condition-based<\/td>\n<td>A measured value crosses a threshold<\/td>\n<td>Assets with a clear indicator: vibration, temperature, oil<\/td>\n<\/tr>\n<tr>\n<td>Predictive<\/td>\n<td>A forecast of when the threshold will be crossed<\/td>\n<td>Critical rotating assets with a long warning interval before failure<\/td>\n<\/tr>\n<tr>\n<td>Prescriptive<\/td>\n<td>A forecast plus a recommended action<\/td>\n<td>Mature programs with failure history and clean data<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p>The 80\/20 rule in maintenance is the Pareto principle applied to equipment: a few assets and failure modes generate most of the downtime minutes. Ranking downtime by asset and cause each week prevents a preventive plan from spreading effort evenly over machines that rarely fail.<\/p>\n<h2>Rolling out TPM on a first line: plan, pitfalls and checklist<\/h2>\n<ul>\n<li><strong>Pick one model line<\/strong> with visible losses and a motivated team, not the whole plant.<\/li>\n<li><strong>Baseline OEE and the six losses in minutes<\/strong> over several weeks before any change.<\/li>\n<li><strong>Launch autonomous maintenance steps 1 to 3<\/strong> and one focused improvement project on the top loss in parallel.<\/li>\n<li><strong>Review losses weekly<\/strong> at line level, with operators, maintenance and quality in the same meeting.<\/li>\n<li><strong>Add quality maintenance, early equipment management and office TPM<\/strong> once autonomous and planned maintenance are stable.<\/li>\n<\/ul>\n<p>Pitfalls seen on shop floors: TPM run as a maintenance department program only; OEE calculated by hand at the end of the week, too late to act on a shift; all 8 pillars launched at once; and training treated as optional, which stalls Jishu Hozen at step 4.<\/p>\n<p>Reliable loss data is the backbone of every pillar. PerfTrak records downtime and its causes in real time and turns them into OEE and a loss Pareto per line, while MoniTrak puts the same figures on shop-floor screens for the daily meeting. More on the data layer in this guide to <a href=\"https:\/\/teeptrak.com\/en\/what-is-production-monitoring\/\">automated production monitoring<\/a>.<\/p>\n<p>To see how a TPM loss baseline is built on your own lines: <a href=\"https:\/\/teeptrak.com\/en\/request-a-demo\/\">Request a demo<\/a>.<\/p>\n<figure class=\"se-fig\" style=\"margin:0\"><svg xmlns=\"http:\/\/www.w3.org\/2000\/svg\" viewBox=\"0 0 1200 320\" width=\"100%\" role=\"img\" aria-label=\"TPM rollout on a first line\" style=\"display:block;max-width:100%;height:auto;margin:28px 0;border-radius:14px;\"><rect width=\"1200\" height=\"320\" rx=\"14\" fill=\"#FFFFFF\" stroke=\"#EBEBEB\"\/><text x=\"24\" y=\"44\" fill=\"#232120\" font-size=\"24\" font-weight=\"700\" font-family='Roboto,Open Sans,Segoe UI,Helvetica,Arial,sans-serif'>TPM rollout on a first line<\/text><g opacity=\"0\"><animate attributeName=\"opacity\" from=\"0\" to=\"1\" begin=\"0s\" dur=\"0.6s\" fill=\"freeze\"\/><polygon points=\"24,80 218,80 240,170 218,260 24,260 46,170\" fill=\"#EB352C\" stroke=\"#EBEBEB\"\/><text x=\"64\" y=\"122\" fill=\"#FFFFFF\" font-size=\"30\" font-weight=\"800\" font-family='Roboto,Open Sans,Segoe UI,Helvetica,Arial,sans-serif'>1<\/text><text fill=\"#FFFFFF\" font-size=\"19\" font-weight=\"600\" font-family='Roboto,Open Sans,Segoe UI,Helvetica,Arial,sans-serif'><tspan x=\"64\" y=\"160\">Pick one model line<\/tspan><\/text><\/g><g opacity=\"0\"><animate attributeName=\"opacity\" from=\"0\" to=\"1\" begin=\"0.2s\" dur=\"0.6s\" fill=\"freeze\"\/><polygon points=\"258,80 452,80 474,170 452,260 258,260 280,170\" fill=\"#FDEBE9\" stroke=\"#EBEBEB\"\/><text x=\"298\" y=\"122\" fill=\"#C8281F\" font-size=\"30\" font-weight=\"800\" font-family='Roboto,Open Sans,Segoe UI,Helvetica,Arial,sans-serif'>2<\/text><text fill=\"#232120\" font-size=\"19\" font-weight=\"600\" font-family='Roboto,Open Sans,Segoe UI,Helvetica,Arial,sans-serif'><tspan x=\"298\" y=\"160\">Baseline OEE and<\/tspan><tspan x=\"298\" y=\"184\">losses<\/tspan><\/text><\/g><g opacity=\"0\"><animate attributeName=\"opacity\" from=\"0\" to=\"1\" begin=\"0.4s\" dur=\"0.6s\" fill=\"freeze\"\/><polygon points=\"492,80 686,80 708,170 686,260 492,260 514,170\" fill=\"#FDEBE9\" stroke=\"#EBEBEB\"\/><text x=\"532\" y=\"122\" fill=\"#C8281F\" font-size=\"30\" font-weight=\"800\" font-family='Roboto,Open Sans,Segoe UI,Helvetica,Arial,sans-serif'>3<\/text><text fill=\"#232120\" font-size=\"19\" font-weight=\"600\" font-family='Roboto,Open Sans,Segoe UI,Helvetica,Arial,sans-serif'><tspan x=\"532\" y=\"160\">Start autonomous<\/tspan><tspan x=\"532\" y=\"184\">maintenance<\/tspan><\/text><\/g><g opacity=\"0\"><animate attributeName=\"opacity\" from=\"0\" to=\"1\" begin=\"0.6000000000000001s\" dur=\"0.6s\" fill=\"freeze\"\/><polygon points=\"726,80 920,80 942,170 920,260 726,260 748,170\" fill=\"#FDEBE9\" stroke=\"#EBEBEB\"\/><text x=\"766\" y=\"122\" fill=\"#C8281F\" font-size=\"30\" font-weight=\"800\" font-family='Roboto,Open Sans,Segoe UI,Helvetica,Arial,sans-serif'>4<\/text><text fill=\"#232120\" font-size=\"19\" font-weight=\"600\" font-family='Roboto,Open Sans,Segoe UI,Helvetica,Arial,sans-serif'><tspan x=\"766\" y=\"160\">Attack the top loss<\/tspan><\/text><\/g><g opacity=\"0\"><animate attributeName=\"opacity\" from=\"0\" to=\"1\" begin=\"0.8s\" dur=\"0.6s\" fill=\"freeze\"\/><polygon points=\"960,80 1154,80 1176,170 1154,260 960,260 982,170\" fill=\"#FDEBE9\" stroke=\"#EBEBEB\"\/><text x=\"1000\" y=\"122\" fill=\"#C8281F\" font-size=\"30\" font-weight=\"800\" font-family='Roboto,Open Sans,Segoe UI,Helvetica,Arial,sans-serif'>5<\/text><text fill=\"#232120\" font-size=\"19\" font-weight=\"600\" font-family='Roboto,Open Sans,Segoe UI,Helvetica,Arial,sans-serif'><tspan x=\"1000\" y=\"160\">Extend to other<\/tspan><tspan x=\"1000\" y=\"184\">pillars<\/tspan><\/text><\/g><\/svg><\/figure>\n<h2>Frequently asked questions<\/h2>\n<h3>What are the names of the TPM pillars?<\/h3>\n<p>The 8 pillars of TPM are autonomous maintenance, planned maintenance, focused improvement, quality maintenance, early equipment management, training and education, safety health and environment, and office TPM. They rest on a 5S foundation.<\/p>\n<h3>What is the 80\/20 rule in maintenance?<\/h3>\n<p>It is the Pareto principle applied to equipment losses: a few assets or failure modes cause most of the downtime. Ranking downtime minutes by cause shows where maintenance effort pays back first.<\/p>\n<h3>How does preventive maintenance work?<\/h3>\n<p>Preventive maintenance schedules interventions before failure, using a calendar interval, a usage counter or a measured condition as the trigger. Results are checked against breakdown minutes and repeat failures.<\/p>\n<h3>What are the 5 types of preventive maintenance?<\/h3>\n<p>The five types are time-based, usage-based, condition-based, predictive and prescriptive maintenance. They differ by what triggers the intervention, from a fixed calendar to a forecast with a recommended action.<\/p>\n<h3>What does TPM mean in supply chain?<\/h3>\n<p>In manufacturing and logistics operations, TPM means total productive maintenance applied to production and material-handling equipment. In consumer goods sales, the same acronym can also mean trade promotion management, which is unrelated.<\/p>\n<h3>What are the 7 steps of the Jishu Hozen pillar?<\/h3>\n<p>Initial cleaning, countermeasures for contamination sources and hard-to-reach areas, tentative cleaning and lubrication standards, general inspection, autonomous inspection, standardization, and full autonomous management.<\/p>\n<p><script type=\"application\/ld+json\">{\"@context\":\"https:\/\/schema.org\",\"@type\":\"FAQPage\",\"mainEntity\":[{\"@type\":\"Question\",\"name\":\"What are the names of the TPM pillars?\",\"acceptedAnswer\":{\"@type\":\"Answer\",\"text\":\"The 8 pillars of TPM are autonomous maintenance, planned maintenance, focused improvement, quality maintenance, early equipment management, training and education, safety health and environment, and office TPM. They rest on a 5S foundation.\"}},{\"@type\":\"Question\",\"name\":\"What is the 80\/20 rule in maintenance?\",\"acceptedAnswer\":{\"@type\":\"Answer\",\"text\":\"It is the Pareto principle applied to equipment losses: a few assets or failure modes cause most of the downtime. Ranking downtime minutes by cause shows where maintenance effort pays back first.\"}},{\"@type\":\"Question\",\"name\":\"How does preventive maintenance work?\",\"acceptedAnswer\":{\"@type\":\"Answer\",\"text\":\"Preventive maintenance schedules interventions before failure, using a calendar interval, a usage counter or a measured condition as the trigger. Results are checked against breakdown minutes and repeat failures.\"}},{\"@type\":\"Question\",\"name\":\"What are the 5 types of preventive maintenance?\",\"acceptedAnswer\":{\"@type\":\"Answer\",\"text\":\"The five types are time-based, usage-based, condition-based, predictive and prescriptive maintenance. They differ by what triggers the intervention, from a fixed calendar to a forecast with a recommended action.\"}},{\"@type\":\"Question\",\"name\":\"What does TPM mean in supply chain?\",\"acceptedAnswer\":{\"@type\":\"Answer\",\"text\":\"In manufacturing and logistics operations, TPM means total productive maintenance applied to production and material-handling equipment. In consumer goods sales, the same acronym can also mean trade promotion management, which is unrelated.\"}},{\"@type\":\"Question\",\"name\":\"What are the 7 steps of the Jishu Hozen pillar?\",\"acceptedAnswer\":{\"@type\":\"Answer\",\"text\":\"Initial cleaning, countermeasures for contamination sources and hard-to-reach areas, tentative cleaning and lubrication standards, general inspection, autonomous inspection, standardization, and full autonomous management.\"}}]}<\/script><script type=\"application\/ld+json\">{\"@context\":\"https:\/\/schema.org\",\"@type\":\"HowTo\",\"name\":\"TPM rollout on a first line\",\"step\":[{\"@type\":\"HowToStep\",\"position\":1,\"name\":\"Pick one model line\"},{\"@type\":\"HowToStep\",\"position\":2,\"name\":\"Baseline OEE and losses\"},{\"@type\":\"HowToStep\",\"position\":3,\"name\":\"Start autonomous maintenance\"},{\"@type\":\"HowToStep\",\"position\":4,\"name\":\"Attack the top loss\"},{\"@type\":\"HowToStep\",\"position\":5,\"name\":\"Extend to other pillars\"}]}<\/script><\/p>\n<h3>Read next<\/h3>\n<ul>\n<li><a href=\"https:\/\/teeptrak.com\/en\/best-production-monitoring-software\/\">best production monitoring software<\/a><\/li>\n<li><a href=\"https:\/\/teeptrak.com\/en\/best-fabrico-alternatives-2026\/\">best fabrico alternatives 2026<\/a><\/li>\n<li><a href=\"https:\/\/teeptrak.com\/en\/manufacturing-dashboard-design-guide-2026\/\">manufacturing dashboard design guide 2026<\/a><\/li>\n<\/ul>\n<div class=\"se-cta\" style=\"margin:32px 0 8px;padding:22px 24px;border-left:4px solid #EB352C;background:#F5F6F5;\">\n<p style=\"margin:0 0 12px;font-size:1.05em;\"><strong>TEEPTRAK<\/strong>: total productive maintenance<\/p>\n<p><a href=\"https:\/\/teeptrak.com\/en\/request-a-demo\/\" style=\"display:inline-block;background:#EB352C;color:#fff;padding:12px 22px;border-radius:6px;text-decoration:none;font-weight:700;\">Request a demo<\/a><\/div>\n<p><!-- seo-engine:content:158 -->[\/et_pb_text][\/et_pb_column][\/et_pb_row][\/et_pb_section]<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Total Productive Maintenance (TPM) is a comprehensive approach to maximizing equipment efficiency. Total Productive Maintenance is a comprehensive approach to maximizing equipment efficiency by involving all employees in the maintenance process. By focusing on reducing breakdowns and losses, productive maintenance promotes organizational performance and productivity. It implements rigorous methods that increase quality and extend machine [&hellip;]<\/p>\n","protected":false},"author":384731,"featured_media":34602,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_yoast_wpseo_meta-robots-noindex":"","_yoast_wpseo_canonical":"","_et_pb_use_builder":"on","_et_pb_old_content":"","_et_gb_content_width":"","ai_seo_title":"TPM: Optimize Reliability and Performance","ai_meta_description":"Boost performance with Total Productive Maintenance (TPM): fewer breakdowns, greater reliability and optimized efficiency.","ai_focus_keyword":"total productive maintenance","footnotes":""},"categories":[129,128],"tags":[],"class_list":["post-35582","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-industrial-maintenance","category-process-optimization"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.9 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>TPM: Optimize Reliability and Performance<\/title>\n<meta name=\"description\" content=\"Boost performance with Total Productive Maintenance (TPM): fewer breakdowns, greater reliability and optimized efficiency.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/teeptrak.com\/en\/all-know-how-about-total-productive-maintenance-tpm\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"TPM: Optimize Reliability and Performance\" \/>\n<meta property=\"og:description\" content=\"Boost performance with Total Productive Maintenance (TPM): fewer breakdowns, greater reliability and optimized efficiency.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/teeptrak.com\/en\/all-know-how-about-total-productive-maintenance-tpm\/\" \/>\n<meta property=\"og:site_name\" content=\"TEEPTRAK\" \/>\n<meta property=\"article:published_time\" content=\"2024-11-10T10:00:00+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-11-11T06:05:08+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/teeptrak.com\/wp-content\/uploads\/2024\/11\/engineers-working-at-lathe-in-turbine-maintenance-2023-11-27-05-24-04-utc.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1080\" \/>\n\t<meta property=\"og:image:height\" content=\"720\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Ravinder Singh\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:creator\" content=\"@teeptrak\" \/>\n<meta name=\"twitter:site\" content=\"@teeptrak\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Ravinder Singh\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"9 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/teeptrak.com\\\/en\\\/all-know-how-about-total-productive-maintenance-tpm\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/teeptrak.com\\\/en\\\/all-know-how-about-total-productive-maintenance-tpm\\\/\"},\"author\":{\"name\":\"Ravinder Singh\",\"@id\":\"https:\\\/\\\/teeptrak.com\\\/en\\\/#\\\/schema\\\/person\\\/0b04db32d5fc054d4e0bed70b034af08\"},\"headline\":\"Everything you need to know about total productive maintenance\",\"datePublished\":\"2024-11-10T10:00:00+00:00\",\"dateModified\":\"2026-11-11T06:05:08+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/teeptrak.com\\\/en\\\/all-know-how-about-total-productive-maintenance-tpm\\\/\"},\"wordCount\":2860,\"publisher\":{\"@id\":\"https:\\\/\\\/teeptrak.com\\\/en\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/teeptrak.com\\\/en\\\/all-know-how-about-total-productive-maintenance-tpm\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/teeptrak.com\\\/wp-content\\\/uploads\\\/2024\\\/11\\\/engineers-working-at-lathe-in-turbine-maintenance-2023-11-27-05-24-04-utc.jpg\",\"articleSection\":[\"Industrial maintenance\",\"Process Optimization\"],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/teeptrak.com\\\/en\\\/all-know-how-about-total-productive-maintenance-tpm\\\/\",\"url\":\"https:\\\/\\\/teeptrak.com\\\/en\\\/all-know-how-about-total-productive-maintenance-tpm\\\/\",\"name\":\"TPM: Optimize Reliability and Performance\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/teeptrak.com\\\/en\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/teeptrak.com\\\/en\\\/all-know-how-about-total-productive-maintenance-tpm\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/teeptrak.com\\\/en\\\/all-know-how-about-total-productive-maintenance-tpm\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/teeptrak.com\\\/wp-content\\\/uploads\\\/2024\\\/11\\\/engineers-working-at-lathe-in-turbine-maintenance-2023-11-27-05-24-04-utc.jpg\",\"datePublished\":\"2024-11-10T10:00:00+00:00\",\"dateModified\":\"2026-11-11T06:05:08+00:00\",\"description\":\"Boost performance with Total Productive Maintenance (TPM): fewer breakdowns, greater reliability and optimized efficiency.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/teeptrak.com\\\/en\\\/all-know-how-about-total-productive-maintenance-tpm\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/teeptrak.com\\\/en\\\/all-know-how-about-total-productive-maintenance-tpm\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/teeptrak.com\\\/en\\\/all-know-how-about-total-productive-maintenance-tpm\\\/#primaryimage\",\"url\":\"https:\\\/\\\/teeptrak.com\\\/wp-content\\\/uploads\\\/2024\\\/11\\\/engineers-working-at-lathe-in-turbine-maintenance-2023-11-27-05-24-04-utc.jpg\",\"contentUrl\":\"https:\\\/\\\/teeptrak.com\\\/wp-content\\\/uploads\\\/2024\\\/11\\\/engineers-working-at-lathe-in-turbine-maintenance-2023-11-27-05-24-04-utc.jpg\",\"width\":1080,\"height\":720},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/teeptrak.com\\\/en\\\/all-know-how-about-total-productive-maintenance-tpm\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Accueil\",\"item\":\"https:\\\/\\\/teeptrak.com\\\/en\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Everything you need to know about total productive maintenance\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/teeptrak.com\\\/en\\\/#website\",\"url\":\"https:\\\/\\\/teeptrak.com\\\/en\\\/\",\"name\":\"TEEPTRAK\",\"description\":\"Optimisez votre potentiel industriel\",\"publisher\":{\"@id\":\"https:\\\/\\\/teeptrak.com\\\/en\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/teeptrak.com\\\/en\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/teeptrak.com\\\/en\\\/#organization\",\"name\":\"TeepTrak\",\"url\":\"https:\\\/\\\/teeptrak.com\\\/en\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/teeptrak.com\\\/en\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/teeptrak.com\\\/wp-content\\\/uploads\\\/2026\\\/07\\\/TeepTrak_Logo-PNG-1-scaled.png\",\"contentUrl\":\"https:\\\/\\\/teeptrak.com\\\/wp-content\\\/uploads\\\/2026\\\/07\\\/TeepTrak_Logo-PNG-1-scaled.png\",\"width\":2880,\"height\":528,\"caption\":\"TeepTrak\"},\"image\":{\"@id\":\"https:\\\/\\\/teeptrak.com\\\/en\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/x.com\\\/teeptrak\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/teeptrak\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/teeptrakinternational\\\/\",\"https:\\\/\\\/www.youtube.com\\\/@teeptrak\\\/videos\",\"https:\\\/\\\/www.instagram.com\\\/teeptrak\\\/\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/teeptrak.com\\\/en\\\/#\\\/schema\\\/person\\\/0b04db32d5fc054d4e0bed70b034af08\",\"name\":\"Ravinder Singh\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/afa004471ac2dcd20a0bfe626e1cfd4d06876c592f2b766fca708c3d717a3d13?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/afa004471ac2dcd20a0bfe626e1cfd4d06876c592f2b766fca708c3d717a3d13?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/afa004471ac2dcd20a0bfe626e1cfd4d06876c592f2b766fca708c3d717a3d13?s=96&d=mm&r=g\",\"caption\":\"Ravinder Singh\"}}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"TPM: Optimize Reliability and Performance","description":"Boost performance with Total Productive Maintenance (TPM): fewer breakdowns, greater reliability and optimized efficiency.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/teeptrak.com\/en\/all-know-how-about-total-productive-maintenance-tpm\/","og_locale":"en_US","og_type":"article","og_title":"TPM: Optimize Reliability and Performance","og_description":"Boost performance with Total Productive Maintenance (TPM): fewer breakdowns, greater reliability and optimized efficiency.","og_url":"https:\/\/teeptrak.com\/en\/all-know-how-about-total-productive-maintenance-tpm\/","og_site_name":"TEEPTRAK","article_published_time":"2024-11-10T10:00:00+00:00","article_modified_time":"2026-11-11T06:05:08+00:00","og_image":[{"width":1080,"height":720,"url":"https:\/\/teeptrak.com\/wp-content\/uploads\/2024\/11\/engineers-working-at-lathe-in-turbine-maintenance-2023-11-27-05-24-04-utc.jpg","type":"image\/jpeg"}],"author":"Ravinder Singh","twitter_card":"summary_large_image","twitter_creator":"@teeptrak","twitter_site":"@teeptrak","twitter_misc":{"Written by":"Ravinder Singh","Est. reading time":"9 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/teeptrak.com\/en\/all-know-how-about-total-productive-maintenance-tpm\/#article","isPartOf":{"@id":"https:\/\/teeptrak.com\/en\/all-know-how-about-total-productive-maintenance-tpm\/"},"author":{"name":"Ravinder Singh","@id":"https:\/\/teeptrak.com\/en\/#\/schema\/person\/0b04db32d5fc054d4e0bed70b034af08"},"headline":"Everything you need to know about total productive maintenance","datePublished":"2024-11-10T10:00:00+00:00","dateModified":"2026-11-11T06:05:08+00:00","mainEntityOfPage":{"@id":"https:\/\/teeptrak.com\/en\/all-know-how-about-total-productive-maintenance-tpm\/"},"wordCount":2860,"publisher":{"@id":"https:\/\/teeptrak.com\/en\/#organization"},"image":{"@id":"https:\/\/teeptrak.com\/en\/all-know-how-about-total-productive-maintenance-tpm\/#primaryimage"},"thumbnailUrl":"https:\/\/teeptrak.com\/wp-content\/uploads\/2024\/11\/engineers-working-at-lathe-in-turbine-maintenance-2023-11-27-05-24-04-utc.jpg","articleSection":["Industrial maintenance","Process Optimization"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/teeptrak.com\/en\/all-know-how-about-total-productive-maintenance-tpm\/","url":"https:\/\/teeptrak.com\/en\/all-know-how-about-total-productive-maintenance-tpm\/","name":"TPM: Optimize Reliability and Performance","isPartOf":{"@id":"https:\/\/teeptrak.com\/en\/#website"},"primaryImageOfPage":{"@id":"https:\/\/teeptrak.com\/en\/all-know-how-about-total-productive-maintenance-tpm\/#primaryimage"},"image":{"@id":"https:\/\/teeptrak.com\/en\/all-know-how-about-total-productive-maintenance-tpm\/#primaryimage"},"thumbnailUrl":"https:\/\/teeptrak.com\/wp-content\/uploads\/2024\/11\/engineers-working-at-lathe-in-turbine-maintenance-2023-11-27-05-24-04-utc.jpg","datePublished":"2024-11-10T10:00:00+00:00","dateModified":"2026-11-11T06:05:08+00:00","description":"Boost performance with Total Productive Maintenance (TPM): fewer breakdowns, greater reliability and optimized efficiency.","breadcrumb":{"@id":"https:\/\/teeptrak.com\/en\/all-know-how-about-total-productive-maintenance-tpm\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/teeptrak.com\/en\/all-know-how-about-total-productive-maintenance-tpm\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/teeptrak.com\/en\/all-know-how-about-total-productive-maintenance-tpm\/#primaryimage","url":"https:\/\/teeptrak.com\/wp-content\/uploads\/2024\/11\/engineers-working-at-lathe-in-turbine-maintenance-2023-11-27-05-24-04-utc.jpg","contentUrl":"https:\/\/teeptrak.com\/wp-content\/uploads\/2024\/11\/engineers-working-at-lathe-in-turbine-maintenance-2023-11-27-05-24-04-utc.jpg","width":1080,"height":720},{"@type":"BreadcrumbList","@id":"https:\/\/teeptrak.com\/en\/all-know-how-about-total-productive-maintenance-tpm\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Accueil","item":"https:\/\/teeptrak.com\/en\/"},{"@type":"ListItem","position":2,"name":"Everything you need to know about total productive maintenance"}]},{"@type":"WebSite","@id":"https:\/\/teeptrak.com\/en\/#website","url":"https:\/\/teeptrak.com\/en\/","name":"TEEPTRAK","description":"Optimisez votre potentiel industriel","publisher":{"@id":"https:\/\/teeptrak.com\/en\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/teeptrak.com\/en\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/teeptrak.com\/en\/#organization","name":"TeepTrak","url":"https:\/\/teeptrak.com\/en\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/teeptrak.com\/en\/#\/schema\/logo\/image\/","url":"https:\/\/teeptrak.com\/wp-content\/uploads\/2026\/07\/TeepTrak_Logo-PNG-1-scaled.png","contentUrl":"https:\/\/teeptrak.com\/wp-content\/uploads\/2026\/07\/TeepTrak_Logo-PNG-1-scaled.png","width":2880,"height":528,"caption":"TeepTrak"},"image":{"@id":"https:\/\/teeptrak.com\/en\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/x.com\/teeptrak","https:\/\/www.linkedin.com\/company\/teeptrak\/","https:\/\/www.linkedin.com\/company\/teeptrakinternational\/","https:\/\/www.youtube.com\/@teeptrak\/videos","https:\/\/www.instagram.com\/teeptrak\/"]},{"@type":"Person","@id":"https:\/\/teeptrak.com\/en\/#\/schema\/person\/0b04db32d5fc054d4e0bed70b034af08","name":"Ravinder Singh","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/secure.gravatar.com\/avatar\/afa004471ac2dcd20a0bfe626e1cfd4d06876c592f2b766fca708c3d717a3d13?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/afa004471ac2dcd20a0bfe626e1cfd4d06876c592f2b766fca708c3d717a3d13?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/afa004471ac2dcd20a0bfe626e1cfd4d06876c592f2b766fca708c3d717a3d13?s=96&d=mm&r=g","caption":"Ravinder Singh"}}]}},"_links":{"self":[{"href":"https:\/\/teeptrak.com\/en\/wp-json\/wp\/v2\/posts\/35582","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/teeptrak.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/teeptrak.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/teeptrak.com\/en\/wp-json\/wp\/v2\/users\/384731"}],"replies":[{"embeddable":true,"href":"https:\/\/teeptrak.com\/en\/wp-json\/wp\/v2\/comments?post=35582"}],"version-history":[{"count":8,"href":"https:\/\/teeptrak.com\/en\/wp-json\/wp\/v2\/posts\/35582\/revisions"}],"predecessor-version":[{"id":161272,"href":"https:\/\/teeptrak.com\/en\/wp-json\/wp\/v2\/posts\/35582\/revisions\/161272"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/teeptrak.com\/en\/wp-json\/wp\/v2\/media\/34602"}],"wp:attachment":[{"href":"https:\/\/teeptrak.com\/en\/wp-json\/wp\/v2\/media?parent=35582"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/teeptrak.com\/en\/wp-json\/wp\/v2\/categories?post=35582"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/teeptrak.com\/en\/wp-json\/wp\/v2\/tags?post=35582"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}