{"id":166082,"date":"2026-11-25T08:44:11","date_gmt":"2026-11-25T08:44:11","guid":{"rendered":"https:\/\/teeptrak.com\/preventive-corrective-ratio-downtime-minutes\/"},"modified":"2026-11-25T08:44:11","modified_gmt":"2026-11-25T08:44:11","slug":"preventive-corrective-ratio-downtime-minutes","status":"publish","type":"post","link":"https:\/\/teeptrak.com\/en\/preventive-corrective-ratio-downtime-minutes\/","title":{"rendered":"Preventive-corrective ratio: reading it in minutes of production downtime too"},"content":{"rendered":"<p>[et_pb_section fb_built=&#8221;1&#8243; _builder_version=&#8221;4.27&#8243;][et_pb_row][et_pb_column type=&#8221;4_4&#8243;][et_pb_text]<\/p>\n<p style=\"font-size:17px;line-height:1.8;color:#232120;margin-bottom:20px;\">This article is for maintenance managers, plant managers and production managers who track a preventive-to-corrective maintenance ratio in their CMMS and wonder what that figure really says about production. It does not go back over the definition or the formulas. It adds another reading of the ratio, in minutes of production downtime, to show what each corrective intervention actually cost the line.<\/p>\n<div style=\"background:#f7f5f3;border-left:4px solid #EB352B;border-radius:6px;padding:20px 24px;margin:24px 0 32px;\">\n<div style=\"font-size:15px;font-weight:bold;color:#232120;margin-bottom:10px;text-transform:uppercase;letter-spacing:1px;\">In short<\/div>\n<ul style=\"font-size:16px;line-height:1.7;color:#232120;margin:0;padding-left:20px;\">\n<li style=\"margin-bottom:6px;\">The preventive-corrective ratio counts interventions, costs or labour hours.<\/li>\n<li style=\"margin-bottom:6px;\">None of these readings measures lost production time.<\/li>\n<li style=\"margin-bottom:6px;\">Linking each repair to its measured stop gives its downtime minutes.<\/li>\n<li style=\"margin-bottom:6px;\">The CMMS manages repairs, measurement gives the time the line lost.<\/li>\n<\/ul>\n<\/div>\n<h2 style=\"color:#232120;font-size:28px;margin-top:40px;margin-bottom:20px;\">What Altair explains about calculating and tracking the preventive-corrective ratio<\/h2>\n<blockquote style=\"border-left:5px solid #232120;background:#f7f5f3;margin:28px 0;padding:20px 26px;font-size:19px;line-height:1.7;color:#232120;font-style:normal;\"><p>In the French article <a href=\"https:\/\/altair-enterprise.fr\/fonctionnalites\/gmao\/ratio-preventif-correctif\/\" target=\"_blank\" rel=\"noopener\">Ratio pr\u00e9ventif-correctif : calcul, suivi et optimisation<\/a> (Preventive-corrective ratio: calculation, tracking and optimisation), Altair, the publisher of a CMMS software, presents the ratio as an indicator of maintenance maturity, details several ways of calculating it and sets out a three-phase approach for increasing the share of preventive work. The article also warns that the indicator should not be read in isolation: &#8220;Le ratio pr\u00e9ventif-correctif ne fonctionne pas seul&#8221; (&#8220;the preventive-corrective ratio does not work on its own&#8221;); it is combined with other indicators such as MTBF or availability.<\/p><\/blockquote>\n<p style=\"font-size:17px;line-height:1.8;color:#232120;margin-bottom:20px;\">Altair calculates the ratio in three ways: by number of interventions (preventive interventions over total interventions), by cost (preventive costs over total maintenance costs) and by labour hours (preventive hours over total hours). The article advises choosing the reading according to the goal, whether that is task split, financial weight or team workload, and ideally combining them. For interpretation, Altair places below 30% a state of permanent emergency and above 70% a state of equipment mastery, and points out that there is no universal threshold. For the formulas, the calculator and the three transformation phases, read the Altair article. Here we add a complementary question from the production side: how many minutes of downtime did each corrective intervention cost the line?<\/p>\n<h2 style=\"color:#232120;font-size:28px;margin-top:40px;margin-bottom:20px;\">What the three readings of the ratio do not show<\/h2>\n<p style=\"font-size:17px;line-height:1.8;color:#232120;margin-bottom:20px;\">All three methods measure maintenance activity: how many interventions, how much maintenance spending, how many technician hours. None of them directly measures the time during which the machine did not produce. Yet that duration is what production suffers, and it is what weighs on deliveries.<\/p>\n<p style=\"font-size:17px;line-height:1.8;color:#232120;margin-bottom:20px;\">The gap between a corrective intervention and the stop it caused can be large. The stop starts when the machine stops, not when the work order is opened. It includes the wait before maintenance is called, the time for the technician to arrive, the search for the spare part, the repair itself, then the restart and adjustments. For example, an intervention logged as 40 minutes of labour may correspond to two hours of line downtime. Conversely, short breakdowns fixed by the operator never get a work order: they weigh on production without ever appearing in the ratio.<\/p>\n<table style=\"width:100%;border-collapse:collapse;margin:24px 0;font-size:15px;\">\n<thead>\n<tr>\n<th style=\"background:#232120;color:#fff;padding:10px;text-align:left;border:1px solid #ddd;\">Reading of the ratio<\/th>\n<th style=\"background:#232120;color:#fff;padding:10px;text-align:left;border:1px solid #ddd;\">What it measures<\/th>\n<th style=\"background:#232120;color:#fff;padding:10px;text-align:left;border:1px solid #ddd;\">Data source<\/th>\n<th style=\"background:#232120;color:#fff;padding:10px;text-align:left;border:1px solid #ddd;\">What it does not show<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td style=\"padding:10px;border:1px solid #ddd;vertical-align:top;color:#232120;\">Number of interventions<\/td>\n<td style=\"padding:10px;border:1px solid #ddd;vertical-align:top;color:#232120;\">Split of tasks between preventive and corrective<\/td>\n<td style=\"padding:10px;border:1px solid #ddd;vertical-align:top;color:#232120;\">CMMS (work orders)<\/td>\n<td style=\"padding:10px;border:1px solid #ddd;vertical-align:top;color:#232120;\">How long production was actually stopped<\/td>\n<\/tr>\n<tr>\n<td style=\"padding:10px;border:1px solid #ddd;vertical-align:top;color:#232120;\">Cost<\/td>\n<td style=\"padding:10px;border:1px solid #ddd;vertical-align:top;color:#232120;\">Financial weight of corrective work in the maintenance budget<\/td>\n<td style=\"padding:10px;border:1px solid #ddd;vertical-align:top;color:#232120;\">CMMS, accounting<\/td>\n<td style=\"padding:10px;border:1px solid #ddd;vertical-align:top;color:#232120;\">Output lost during the stop<\/td>\n<\/tr>\n<tr>\n<td style=\"padding:10px;border:1px solid #ddd;vertical-align:top;color:#232120;\">Labour hours<\/td>\n<td style=\"padding:10px;border:1px solid #ddd;vertical-align:top;color:#232120;\">Maintenance team workload<\/td>\n<td style=\"padding:10px;border:1px solid #ddd;vertical-align:top;color:#232120;\">CMMS (logged time)<\/td>\n<td style=\"padding:10px;border:1px solid #ddd;vertical-align:top;color:#232120;\">The wait before the repair and the restart<\/td>\n<\/tr>\n<tr>\n<td style=\"padding:10px;border:1px solid #ddd;vertical-align:top;color:#232120;\">Minutes of production downtime<\/td>\n<td style=\"padding:10px;border:1px solid #ddd;vertical-align:top;color:#232120;\">Time the machine did not produce, by type of intervention<\/td>\n<td style=\"padding:10px;border:1px solid #ddd;vertical-align:top;color:#232120;\">Automatic downtime measurement at the machine<\/td>\n<td style=\"padding:10px;border:1px solid #ddd;vertical-align:top;color:#232120;\">Technical detail of the repair, which stays in the CMMS<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<figure style=\"margin:32px 0;\"><img decoding=\"async\" src=\"https:\/\/teeptrak.com\/wp-content\/uploads\/2026\/11\/teeptrak-altair-en.png\" alt=\"Four-step method for reading the preventive-corrective ratio in downtime minutes: export interventions, measure stops, match the two, count the minutes\" width=\"1600\" height=\"900\" style=\"width:100%;height:auto;border-radius:8px;\" loading=\"lazy\" \/><\/figure>\n<h2 style=\"color:#232120;font-size:28px;margin-top:40px;margin-bottom:20px;\">Reading the ratio in downtime minutes: a six-step method<\/h2>\n<p style=\"font-size:17px;line-height:1.8;color:#232120;margin-bottom:20px;\">The principle: link each CMMS intervention to the corresponding machine stop, then count minutes of production downtime alongside the number of interventions.<\/p>\n<ol style=\"margin:0 0 20px 0;padding-left:24px;\">\n<li style=\"font-size:17px;line-height:1.8;color:#232120;margin-bottom:8px;\"><strong>Export the month&#8217;s interventions.<\/strong> For each work order: machine, type (preventive or corrective), date, start and end time.<\/li>\n<li style=\"font-size:17px;line-height:1.8;color:#232120;margin-bottom:8px;\"><strong>Retrieve the timestamped machine stops.<\/strong> Start, end and cause of every stop over the same period, measured at the machine, short stops included.<\/li>\n<li style=\"font-size:17px;line-height:1.8;color:#232120;margin-bottom:8px;\"><strong>Match interventions and stops.<\/strong> Link each corrective intervention to the stop that triggered it. List breakdown stops with no work order and work orders with no stop.<\/li>\n<li style=\"font-size:17px;line-height:1.8;color:#232120;margin-bottom:8px;\"><strong>Separate planned stops from unplanned ones.<\/strong> A preventive intervention carried out during a stop that was already planned (shutdown, weekend, changeover) costs no production minutes; a preventive intervention that stops a running machine does.<\/li>\n<li style=\"font-size:17px;line-height:1.8;color:#232120;margin-bottom:8px;\"><strong>Calculate downtime minutes by type.<\/strong> Machine by machine: production downtime minutes caused by preventive work, minutes caused by corrective work, and downtime minutes per corrective intervention.<\/li>\n<li style=\"font-size:17px;line-height:1.8;color:#232120;margin-bottom:8px;\"><strong>Compare with the ratio by number of interventions.<\/strong> Put both readings side by side for each machine and look for the gaps.<\/li>\n<\/ol>\n<h2 style=\"color:#232120;font-size:28px;margin-top:40px;margin-bottom:20px;\">Same ratio, different reality: an example<\/h2>\n<p style=\"font-size:17px;line-height:1.8;color:#232120;margin-bottom:20px;\">An example to make this concrete, with no real data: two machines show the same 70% ratio by number of interventions over the month, with 7 preventive and 3 corrective interventions each.<\/p>\n<table style=\"width:100%;border-collapse:collapse;margin:24px 0;font-size:15px;\">\n<thead>\n<tr>\n<th style=\"background:#232120;color:#fff;padding:10px;text-align:left;border:1px solid #ddd;\">Indicator<\/th>\n<th style=\"background:#232120;color:#fff;padding:10px;text-align:left;border:1px solid #ddd;\">Machine A<\/th>\n<th style=\"background:#232120;color:#fff;padding:10px;text-align:left;border:1px solid #ddd;\">Machine B<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td style=\"padding:10px;border:1px solid #ddd;vertical-align:top;color:#232120;\">Preventive \/ corrective interventions<\/td>\n<td style=\"padding:10px;border:1px solid #ddd;vertical-align:top;color:#232120;\">7 \/ 3<\/td>\n<td style=\"padding:10px;border:1px solid #ddd;vertical-align:top;color:#232120;\">7 \/ 3<\/td>\n<\/tr>\n<tr>\n<td style=\"padding:10px;border:1px solid #ddd;vertical-align:top;color:#232120;\">Ratio by number of interventions<\/td>\n<td style=\"padding:10px;border:1px solid #ddd;vertical-align:top;color:#232120;\">70%<\/td>\n<td style=\"padding:10px;border:1px solid #ddd;vertical-align:top;color:#232120;\">70%<\/td>\n<\/tr>\n<tr>\n<td style=\"padding:10px;border:1px solid #ddd;vertical-align:top;color:#232120;\">Production downtime minutes from preventive work<\/td>\n<td style=\"padding:10px;border:1px solid #ddd;vertical-align:top;color:#232120;\">0 (done during planned stops)<\/td>\n<td style=\"padding:10px;border:1px solid #ddd;vertical-align:top;color:#232120;\">120 (done during production)<\/td>\n<\/tr>\n<tr>\n<td style=\"padding:10px;border:1px solid #ddd;vertical-align:top;color:#232120;\">Production downtime minutes from corrective work<\/td>\n<td style=\"padding:10px;border:1px solid #ddd;vertical-align:top;color:#232120;\">45<\/td>\n<td style=\"padding:10px;border:1px solid #ddd;vertical-align:top;color:#232120;\">540<\/td>\n<\/tr>\n<tr>\n<td style=\"padding:10px;border:1px solid #ddd;vertical-align:top;color:#232120;\">Downtime minutes per corrective intervention<\/td>\n<td style=\"padding:10px;border:1px solid #ddd;vertical-align:top;color:#232120;\">15<\/td>\n<td style=\"padding:10px;border:1px solid #ddd;vertical-align:top;color:#232120;\">180<\/td>\n<\/tr>\n<tr>\n<td style=\"padding:10px;border:1px solid #ddd;vertical-align:top;color:#232120;\">Total production minutes lost to maintenance<\/td>\n<td style=\"padding:10px;border:1px solid #ddd;vertical-align:top;color:#232120;\">45<\/td>\n<td style=\"padding:10px;border:1px solid #ddd;vertical-align:top;color:#232120;\">660<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p style=\"font-size:17px;line-height:1.8;color:#232120;margin-bottom:20px;\">The ratio by interventions is identical, yet the production loss is almost fifteen times higher on machine B. On A, preventive work is scheduled during stops that were already planned and corrective repairs are short. On B, every corrective repair stops the line for three hours and preventive work itself interrupts production. The priorities are not the same. On B, first understand why corrective repairs take so long (waiting for the technician, missing part, long restart), then move preventive work out of production hours, or use stops that have already happened to bring some tasks forward, as described in <a href=\"https:\/\/teeptrak.com\/en\/opportunistic-maintenance-unplanned-stops\/\">Opportunistic maintenance: bringing preventive work forward during unplanned stops<\/a>.<\/p>\n<h2 style=\"color:#232120;font-size:28px;margin-top:40px;margin-bottom:20px;\">From downtime minutes to the real cost for the line<\/h2>\n<p style=\"font-size:17px;line-height:1.8;color:#232120;margin-bottom:20px;\">Once the minutes are known, converting them into cost is straightforward: downtime minutes multiplied by the hourly cost of the line, as defined by your finance team (lost margin, overtime to catch up, late delivery penalties). This cost comes on top of the maintenance costs counted in the cost-based ratio; it does not replace them. To build this calculation on measured durations and frequencies, see <a href=\"https:\/\/teeptrak.com\/en\/measure-downtime-duration-frequency-cost\/\">Measure downtime duration and frequency before you calculate downtime cost<\/a>.<\/p>\n<p style=\"font-size:17px;line-height:1.8;color:#232120;margin-bottom:20px;\">This reading also helps you check the effect of the preventive plan over time. If the share of preventive work goes up but corrective downtime minutes do not go down on a machine, the plan is not targeting the right failures. The machine by machine method is described in <a href=\"https:\/\/teeptrak.com\/en\/preventive-maintenance-effectiveness-unplanned-stops\/\">Preventive maintenance effectiveness: checking machine by machine whether breakdowns really go down<\/a>.<\/p>\n<h2 style=\"color:#232120;font-size:28px;margin-top:40px;margin-bottom:20px;\">The role of TEEPTRAK<\/h2>\n<p style=\"font-size:17px;line-height:1.8;color:#232120;margin-bottom:20px;\">The CMMS manages interventions: planning, work orders, spare parts, technical history. TEEPTRAK measures machine stops: a module wired into the electrical cabinet and a sensor at the line, about one hour of installation per machine, no connection to the PLC, and a first OEE within 48 hours. Every stop is timestamped automatically, short stops included, and the operator enters the cause at the workstation. The two sources complement each other: the intervention comes from the CMMS, the downtime suffered by the line comes from the measurement. TEEPTRAK is not an MES and does not replace the CMMS. It is used in more than 700 plants in more than 30 countries.<\/p>\n<h3 style=\"color:#232120;font-size:22px;margin-top:32px;margin-bottom:14px;\">Further reading<\/h3>\n<ul style=\"margin:0 0 20px 0;padding-left:24px;\">\n<li style=\"font-size:17px;line-height:1.8;color:#232120;margin-bottom:8px;\"><a href=\"https:\/\/altair-enterprise.fr\/fonctionnalites\/gmao\/ratio-preventif-correctif\/\" target=\"_blank\" rel=\"noopener\">Ratio pr\u00e9ventif-correctif : calcul, suivi et optimisation<\/a> (Altair, in French)<\/li>\n<li style=\"font-size:17px;line-height:1.8;color:#232120;margin-bottom:8px;\"><a href=\"https:\/\/teeptrak.com\/en\/preventive-maintenance-effectiveness-unplanned-stops\/\">Preventive maintenance effectiveness: checking machine by machine whether breakdowns really go down<\/a><\/li>\n<li style=\"font-size:17px;line-height:1.8;color:#232120;margin-bottom:8px;\"><a href=\"https:\/\/teeptrak.com\/en\/opportunistic-maintenance-unplanned-stops\/\">Opportunistic maintenance: bringing preventive work forward during unplanned stops<\/a><\/li>\n<\/ul>\n<h2 style=\"color:#232120;font-size:28px;margin-top:40px;margin-bottom:20px;\">FAQ<\/h2>\n<p style=\"font-size:17px;line-height:1.8;color:#232120;margin-bottom:20px;\"><strong>Should preventive work done during a planned stop be counted?<\/strong> Yes in the ratio by interventions, since the intervention took place. In production downtime minutes it counts as zero: the machine was not scheduled to produce. That is exactly what separates well-placed preventive work from preventive work that stops the line.<\/p>\n<p style=\"font-size:17px;line-height:1.8;color:#232120;margin-bottom:20px;\"><strong>Doesn&#8217;t the CMMS already give the duration of corrective interventions?<\/strong> It gives the duration of the repair, as logged by the technician. The stop suffered by production is often longer: it starts when the machine stops and ends when it produces again. Short breakdowns fixed by the operator, with no work order, are not in it at all.<\/p>\n<p style=\"font-size:17px;line-height:1.8;color:#232120;margin-bottom:20px;\"><strong>What target should we set for downtime minutes per corrective intervention?<\/strong> There is no universal target, any more than for the ratio itself, as Altair points out. Compare your machines with one another, follow the trend month after month and deal first with the machines where each corrective repair stops the line the longest.<\/p>\n<div style=\"background:#232120;color:white;padding:32px;border-radius:8px;margin:32px 0;text-align:center;\">\n<div style=\"font-size:18px;font-weight:bold;margin-bottom:8px;\">Your real OEE within days<\/div>\n<div style=\"font-size:14px;color:#ddd;margin-bottom:20px;\">Module wired in the electrical cabinet, sensor at the edge of the line, about one hour of installation per machine, no MES project and no production stop.<\/div>\n<p><a href=\"https:\/\/teeptrak.com\/fr\/demandez-une-demo\/\" style=\"display:inline-block;background:#EB352C;color:white;padding:14px 28px;text-decoration:none;border-radius:4px;font-weight:bold;\">Request a demo<\/a><\/div>\n<p><script type=\"application\/ld+json\">{\"@context\": \"https:\/\/schema.org\", \"@type\": \"FAQPage\", \"mainEntity\": [{\"@type\": \"Question\", \"name\": \"Should preventive work done during a planned stop be counted?\", \"acceptedAnswer\": {\"@type\": \"Answer\", \"text\": \"Yes in the ratio by interventions, since the intervention took place. In production downtime minutes it counts as zero: the machine was not scheduled to produce. That is exactly what separates well-placed preventive work from preventive work that stops the line.\"}}, {\"@type\": \"Question\", \"name\": \"Doesn't the CMMS already give the duration of corrective interventions?\", \"acceptedAnswer\": {\"@type\": \"Answer\", \"text\": \"It gives the duration of the repair, as logged by the technician. The stop suffered by production is often longer: it starts when the machine stops and ends when it produces again. Short breakdowns fixed by the operator, with no work order, are not in it at all.\"}}, {\"@type\": \"Question\", \"name\": \"What target should we set for downtime minutes per corrective intervention?\", \"acceptedAnswer\": {\"@type\": \"Answer\", \"text\": \"There is no universal target, any more than for the ratio itself, as Altair points out. Compare your machines with one another, follow the trend month after month and deal first with the machines where each corrective repair stops the line the longest.\"}}]}<\/script>[\/et_pb_text][\/et_pb_column][\/et_pb_row][\/et_pb_section]<\/p>\n","protected":false},"excerpt":{"rendered":"<p>[et_pb_section fb_built=&#8221;1&#8243; _builder_version=&#8221;4.27&#8243;][et_pb_row][et_pb_column type=&#8221;4_4&#8243;][et_pb_text] This article is for maintenance managers, plant managers and production managers who track a preventive-to-corrective maintenance ratio in their CMMS and wonder what that figure really says about production. It does not go back over the definition or the formulas. It adds another reading of the ratio, in minutes of production [&hellip;]<\/p>\n","protected":false},"author":10,"featured_media":161932,"comment_status":"","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_yoast_wpseo_meta-robots-noindex":"","_yoast_wpseo_canonical":"","_et_pb_use_builder":"","_et_pb_old_content":"","_et_gb_content_width":"","ai_seo_title":"","ai_meta_description":"","ai_focus_keyword":"","footnotes":""},"categories":[129],"tags":[],"class_list":["post-166082","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-industrial-maintenance"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.9 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Preventive-corrective ratio in downtime minutes<\/title>\n<meta name=\"description\" content=\"The preventive-corrective ratio counts interventions, costs or hours. Read in downtime minutes, it shows what each repair really cost the line.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/teeptrak.com\/en\/preventive-corrective-ratio-downtime-minutes\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Preventive-corrective ratio in downtime minutes\" \/>\n<meta property=\"og:description\" content=\"The preventive-corrective ratio counts interventions, costs or hours. Read in downtime minutes, it shows what each repair really cost the line.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/teeptrak.com\/en\/preventive-corrective-ratio-downtime-minutes\/\" \/>\n<meta property=\"og:site_name\" content=\"TEEPTRAK\" \/>\n<meta property=\"article:published_time\" content=\"2026-11-25T08:44:11+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/teeptrak.com\/wp-content\/uploads\/2026\/11\/teeptrak-altair-en.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1600\" \/>\n\t<meta property=\"og:image:height\" content=\"900\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"Alyssa Fleurette\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:creator\" content=\"@teeptrak\" \/>\n<meta name=\"twitter:site\" content=\"@teeptrak\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Alyssa Fleurette\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"7 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/teeptrak.com\\\/en\\\/preventive-corrective-ratio-downtime-minutes\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/teeptrak.com\\\/en\\\/preventive-corrective-ratio-downtime-minutes\\\/\"},\"author\":{\"name\":\"Alyssa Fleurette\",\"@id\":\"https:\\\/\\\/teeptrak.com\\\/en\\\/#\\\/schema\\\/person\\\/c8f4c4c2953d0ad42f08de085e63529f\"},\"headline\":\"Preventive-corrective ratio: reading it in minutes of production downtime too\",\"datePublished\":\"2026-11-25T08:44:11+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/teeptrak.com\\\/en\\\/preventive-corrective-ratio-downtime-minutes\\\/\"},\"wordCount\":1469,\"publisher\":{\"@id\":\"https:\\\/\\\/teeptrak.com\\\/en\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/teeptrak.com\\\/en\\\/preventive-corrective-ratio-downtime-minutes\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/teeptrak.com\\\/wp-content\\\/uploads\\\/2026\\\/11\\\/ttp-cover2-pareto-light.png\",\"articleSection\":[\"Industrial maintenance\"],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/teeptrak.com\\\/en\\\/preventive-corrective-ratio-downtime-minutes\\\/\",\"url\":\"https:\\\/\\\/teeptrak.com\\\/en\\\/preventive-corrective-ratio-downtime-minutes\\\/\",\"name\":\"Preventive-corrective ratio in downtime minutes\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/teeptrak.com\\\/en\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/teeptrak.com\\\/en\\\/preventive-corrective-ratio-downtime-minutes\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/teeptrak.com\\\/en\\\/preventive-corrective-ratio-downtime-minutes\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/teeptrak.com\\\/wp-content\\\/uploads\\\/2026\\\/11\\\/ttp-cover2-pareto-light.png\",\"datePublished\":\"2026-11-25T08:44:11+00:00\",\"description\":\"The preventive-corrective ratio counts interventions, costs or hours. Read in downtime minutes, it shows what each repair really cost the line.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/teeptrak.com\\\/en\\\/preventive-corrective-ratio-downtime-minutes\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/teeptrak.com\\\/en\\\/preventive-corrective-ratio-downtime-minutes\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/teeptrak.com\\\/en\\\/preventive-corrective-ratio-downtime-minutes\\\/#primaryimage\",\"url\":\"https:\\\/\\\/teeptrak.com\\\/wp-content\\\/uploads\\\/2026\\\/11\\\/ttp-cover2-pareto-light.png\",\"contentUrl\":\"https:\\\/\\\/teeptrak.com\\\/wp-content\\\/uploads\\\/2026\\\/11\\\/ttp-cover2-pareto-light.png\",\"width\":1600,\"height\":900,\"caption\":\"TEEPTRAK illustration\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/teeptrak.com\\\/en\\\/preventive-corrective-ratio-downtime-minutes\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Accueil\",\"item\":\"https:\\\/\\\/teeptrak.com\\\/en\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Preventive-corrective ratio: reading it in minutes of production downtime too\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/teeptrak.com\\\/en\\\/#website\",\"url\":\"https:\\\/\\\/teeptrak.com\\\/en\\\/\",\"name\":\"TEEPTRAK\",\"description\":\"Optimisez votre potentiel industriel\",\"publisher\":{\"@id\":\"https:\\\/\\\/teeptrak.com\\\/en\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/teeptrak.com\\\/en\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/teeptrak.com\\\/en\\\/#organization\",\"name\":\"TeepTrak\",\"url\":\"https:\\\/\\\/teeptrak.com\\\/en\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/teeptrak.com\\\/en\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/teeptrak.com\\\/wp-content\\\/uploads\\\/2026\\\/07\\\/TeepTrak_Logo-PNG-1-scaled.png\",\"contentUrl\":\"https:\\\/\\\/teeptrak.com\\\/wp-content\\\/uploads\\\/2026\\\/07\\\/TeepTrak_Logo-PNG-1-scaled.png\",\"width\":2880,\"height\":528,\"caption\":\"TeepTrak\"},\"image\":{\"@id\":\"https:\\\/\\\/teeptrak.com\\\/en\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/x.com\\\/teeptrak\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/teeptrak\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/teeptrakinternational\\\/\",\"https:\\\/\\\/www.youtube.com\\\/@teeptrak\\\/videos\",\"https:\\\/\\\/www.instagram.com\\\/teeptrak\\\/\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/teeptrak.com\\\/en\\\/#\\\/schema\\\/person\\\/c8f4c4c2953d0ad42f08de085e63529f\",\"name\":\"Alyssa Fleurette\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/ac9dbd3bd4dd1699205324f9604e5cfe3ba1c748b1b7c2b2c06326350e48e966?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/ac9dbd3bd4dd1699205324f9604e5cfe3ba1c748b1b7c2b2c06326350e48e966?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/ac9dbd3bd4dd1699205324f9604e5cfe3ba1c748b1b7c2b2c06326350e48e966?s=96&d=mm&r=g\",\"caption\":\"Alyssa Fleurette\"}}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Preventive-corrective ratio in downtime minutes","description":"The preventive-corrective ratio counts interventions, costs or hours. Read in downtime minutes, it shows what each repair really cost the line.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/teeptrak.com\/en\/preventive-corrective-ratio-downtime-minutes\/","og_locale":"en_US","og_type":"article","og_title":"Preventive-corrective ratio in downtime minutes","og_description":"The preventive-corrective ratio counts interventions, costs or hours. Read in downtime minutes, it shows what each repair really cost the line.","og_url":"https:\/\/teeptrak.com\/en\/preventive-corrective-ratio-downtime-minutes\/","og_site_name":"TEEPTRAK","article_published_time":"2026-11-25T08:44:11+00:00","og_image":[{"width":1600,"height":900,"url":"https:\/\/teeptrak.com\/wp-content\/uploads\/2026\/11\/teeptrak-altair-en.png","type":"image\/png"}],"author":"Alyssa Fleurette","twitter_card":"summary_large_image","twitter_creator":"@teeptrak","twitter_site":"@teeptrak","twitter_misc":{"Written by":"Alyssa Fleurette","Est. reading time":"7 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/teeptrak.com\/en\/preventive-corrective-ratio-downtime-minutes\/#article","isPartOf":{"@id":"https:\/\/teeptrak.com\/en\/preventive-corrective-ratio-downtime-minutes\/"},"author":{"name":"Alyssa Fleurette","@id":"https:\/\/teeptrak.com\/en\/#\/schema\/person\/c8f4c4c2953d0ad42f08de085e63529f"},"headline":"Preventive-corrective ratio: reading it in minutes of production downtime too","datePublished":"2026-11-25T08:44:11+00:00","mainEntityOfPage":{"@id":"https:\/\/teeptrak.com\/en\/preventive-corrective-ratio-downtime-minutes\/"},"wordCount":1469,"publisher":{"@id":"https:\/\/teeptrak.com\/en\/#organization"},"image":{"@id":"https:\/\/teeptrak.com\/en\/preventive-corrective-ratio-downtime-minutes\/#primaryimage"},"thumbnailUrl":"https:\/\/teeptrak.com\/wp-content\/uploads\/2026\/11\/ttp-cover2-pareto-light.png","articleSection":["Industrial maintenance"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/teeptrak.com\/en\/preventive-corrective-ratio-downtime-minutes\/","url":"https:\/\/teeptrak.com\/en\/preventive-corrective-ratio-downtime-minutes\/","name":"Preventive-corrective ratio in downtime minutes","isPartOf":{"@id":"https:\/\/teeptrak.com\/en\/#website"},"primaryImageOfPage":{"@id":"https:\/\/teeptrak.com\/en\/preventive-corrective-ratio-downtime-minutes\/#primaryimage"},"image":{"@id":"https:\/\/teeptrak.com\/en\/preventive-corrective-ratio-downtime-minutes\/#primaryimage"},"thumbnailUrl":"https:\/\/teeptrak.com\/wp-content\/uploads\/2026\/11\/ttp-cover2-pareto-light.png","datePublished":"2026-11-25T08:44:11+00:00","description":"The preventive-corrective ratio counts interventions, costs or hours. Read in downtime minutes, it shows what each repair really cost the line.","breadcrumb":{"@id":"https:\/\/teeptrak.com\/en\/preventive-corrective-ratio-downtime-minutes\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/teeptrak.com\/en\/preventive-corrective-ratio-downtime-minutes\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/teeptrak.com\/en\/preventive-corrective-ratio-downtime-minutes\/#primaryimage","url":"https:\/\/teeptrak.com\/wp-content\/uploads\/2026\/11\/ttp-cover2-pareto-light.png","contentUrl":"https:\/\/teeptrak.com\/wp-content\/uploads\/2026\/11\/ttp-cover2-pareto-light.png","width":1600,"height":900,"caption":"TEEPTRAK illustration"},{"@type":"BreadcrumbList","@id":"https:\/\/teeptrak.com\/en\/preventive-corrective-ratio-downtime-minutes\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Accueil","item":"https:\/\/teeptrak.com\/en\/"},{"@type":"ListItem","position":2,"name":"Preventive-corrective ratio: reading it in minutes of production downtime too"}]},{"@type":"WebSite","@id":"https:\/\/teeptrak.com\/en\/#website","url":"https:\/\/teeptrak.com\/en\/","name":"TEEPTRAK","description":"Optimisez votre potentiel industriel","publisher":{"@id":"https:\/\/teeptrak.com\/en\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/teeptrak.com\/en\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/teeptrak.com\/en\/#organization","name":"TeepTrak","url":"https:\/\/teeptrak.com\/en\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/teeptrak.com\/en\/#\/schema\/logo\/image\/","url":"https:\/\/teeptrak.com\/wp-content\/uploads\/2026\/07\/TeepTrak_Logo-PNG-1-scaled.png","contentUrl":"https:\/\/teeptrak.com\/wp-content\/uploads\/2026\/07\/TeepTrak_Logo-PNG-1-scaled.png","width":2880,"height":528,"caption":"TeepTrak"},"image":{"@id":"https:\/\/teeptrak.com\/en\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/x.com\/teeptrak","https:\/\/www.linkedin.com\/company\/teeptrak\/","https:\/\/www.linkedin.com\/company\/teeptrakinternational\/","https:\/\/www.youtube.com\/@teeptrak\/videos","https:\/\/www.instagram.com\/teeptrak\/"]},{"@type":"Person","@id":"https:\/\/teeptrak.com\/en\/#\/schema\/person\/c8f4c4c2953d0ad42f08de085e63529f","name":"Alyssa Fleurette","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/secure.gravatar.com\/avatar\/ac9dbd3bd4dd1699205324f9604e5cfe3ba1c748b1b7c2b2c06326350e48e966?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/ac9dbd3bd4dd1699205324f9604e5cfe3ba1c748b1b7c2b2c06326350e48e966?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/ac9dbd3bd4dd1699205324f9604e5cfe3ba1c748b1b7c2b2c06326350e48e966?s=96&d=mm&r=g","caption":"Alyssa Fleurette"}}]}},"_links":{"self":[{"href":"https:\/\/teeptrak.com\/en\/wp-json\/wp\/v2\/posts\/166082","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/teeptrak.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/teeptrak.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/teeptrak.com\/en\/wp-json\/wp\/v2\/users\/10"}],"replies":[{"embeddable":true,"href":"https:\/\/teeptrak.com\/en\/wp-json\/wp\/v2\/comments?post=166082"}],"version-history":[{"count":0,"href":"https:\/\/teeptrak.com\/en\/wp-json\/wp\/v2\/posts\/166082\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/teeptrak.com\/en\/wp-json\/wp\/v2\/media\/161932"}],"wp:attachment":[{"href":"https:\/\/teeptrak.com\/en\/wp-json\/wp\/v2\/media?parent=166082"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/teeptrak.com\/en\/wp-json\/wp\/v2\/categories?post=166082"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/teeptrak.com\/en\/wp-json\/wp\/v2\/tags?post=166082"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}