{"id":158484,"date":"2026-11-03T08:50:03","date_gmt":"2026-11-03T08:50:03","guid":{"rendered":"https:\/\/teeptrak.com\/food-beverage-sanitation-changeover-downtime-shift-pattern\/"},"modified":"2026-11-03T08:50:03","modified_gmt":"2026-11-03T08:50:03","slug":"food-beverage-sanitation-changeover-downtime-shift-pattern","status":"publish","type":"post","link":"https:\/\/teeptrak.com\/en\/food-beverage-sanitation-changeover-downtime-shift-pattern\/","title":{"rendered":"Sanitation, changeovers and shift starts in food and beverage plants: how much line time each shift pattern really loses"},"content":{"rendered":"<p>[et_pb_section fb_built=&#8221;1&#8243; _builder_version=&#8221;4.27&#8243;][et_pb_row][et_pb_column type=&#8221;4_4&#8243;][et_pb_text]<\/p>\n<p style=\"font-size:17px;line-height:1.8;color:#232120;margin-bottom:20px;\">This article is for plant managers, production managers, continuous improvement leads and maintenance managers in food and beverage plants who are about to change a shift pattern, or who suspect the current one costs more line time than anyone has written down. Sanitation, product changeovers and the minutes around every shift start are planned on paper, but rarely measured stop by stop. The aim here is simple: show how to measure what each of these events really takes, shift by shift, so that the next schedule decision rests on real data rather than on standard times.<\/p>\n<div style=\"background:#f7f5f3;border-left:4px solid #EB352B;border-radius:6px;padding:20px 24px;margin:24px 0 32px;\">\n<div style=\"font-size:15px;font-weight:bold;color:#232120;margin-bottom:10px;text-transform:uppercase;letter-spacing:1px;\">In short<\/div>\n<ul style=\"font-size:16px;line-height:1.7;color:#232120;margin:0;padding-left:20px;\">\n<li style=\"margin-bottom:6px;\">Sanitation, changeovers and shift starts are planned, but rarely measured.<\/li>\n<li style=\"margin-bottom:6px;\">Capture each stop automatically, with its reason and its shift.<\/li>\n<li style=\"margin-bottom:6px;\">Compare planned and measured durations across shift patterns.<\/li>\n<li style=\"margin-bottom:6px;\">Feed measured times back into the next schedule design.<\/li>\n<\/ul>\n<\/div>\n<h2 style=\"color:#232120;font-size:28px;margin-top:40px;margin-bottom:20px;\">Sanitation is a schedule constraint before it is a cleaning task<\/h2>\n<blockquote style=\"border-left:5px solid #232120;background:#f7f5f3;margin:28px 0;padding:20px 26px;font-size:19px;line-height:1.7;color:#232120;font-style:normal;\"><p>Ethan Franklin, Senior Consultant at Shiftwork Solutions LLC, explains in <a href=\"https:\/\/shift-work.com\/industries\/food-beverage-manufacturing\/\" target=\"_blank\" rel=\"noopener\">Shift Scheduling for Food &amp; Beverage Manufacturing: Unique Challenges and Proven Solutions<\/a> why food and beverage plants cannot schedule shifts the way other manufacturers do. He shows how sanitation, product changeovers, temperature constraints and seasonal demand shape the schedule, and argues that sanitation should be designed into the shift pattern from the start, including by cross-training production operators. His point on capacity is blunt: &#8220;Every extra hour of sanitation is an hour of lost production capacity.&#8221;<\/p><\/blockquote>\n<p style=\"font-size:17px;line-height:1.8;color:#232120;margin-bottom:20px;\">His article covers the design side: how a shift pattern should be built around these constraints. This one covers the measurement side. A schedule built around sanitation still relies on assumptions about how long sanitation, changeovers and start-ups actually take. If those assumptions are off, the pattern loses capacity every week without anyone seeing it on a report. Measuring the real duration of each event, on each line and each shift, is what turns a well designed schedule into one that can be checked and adjusted.<\/p>\n<h2 style=\"color:#232120;font-size:28px;margin-top:40px;margin-bottom:20px;\">Where food and beverage lines lose time around the schedule<\/h2>\n<p style=\"font-size:17px;line-height:1.8;color:#232120;margin-bottom:20px;\">In most food and beverage plants, the line time that disappears around the schedule falls into four families. They are usually lumped together as &#8220;planned downtime&#8221; or &#8220;sanitation&#8221;, which is exactly why they are hard to manage.<\/p>\n<ul style=\"margin:0 0 20px 0;padding-left:24px;\">\n<li style=\"font-size:17px;line-height:1.8;color:#232120;margin-bottom:8px;\"><strong>Sanitation windows.<\/strong> The planned cleaning itself, plus everything that stretches it: waiting for the crew, waiting for inspection or swab results, restarting equipment after wash-down.<\/li>\n<li style=\"font-size:17px;line-height:1.8;color:#232120;margin-bottom:8px;\"><strong>Product changeovers.<\/strong> Flavor, format, allergen or packaging changes. Their duration depends on what ran before, what runs next, and who is available to do the work.<\/li>\n<li style=\"font-size:17px;line-height:1.8;color:#232120;margin-bottom:8px;\"><strong>Shift starts and handovers.<\/strong> The minutes between the official start of a shift and the moment the line reaches its normal rate: briefing, material checks, first-product checks, settings adjustments.<\/li>\n<li style=\"font-size:17px;line-height:1.8;color:#232120;margin-bottom:8px;\"><strong>Restarts after long stops.<\/strong> The ramp-up after a weekend, a full sanitation or a long changeover, when the line runs slowly or stops often before it stabilizes.<\/li>\n<\/ul>\n<p style=\"font-size:17px;line-height:1.8;color:#232120;margin-bottom:20px;\">Each of these is legitimate. The problem is not that they exist, but that their real duration is rarely known. A changeover planned as a fixed block can vary widely from one product pair to another and from one crew to another, and a shift start that is supposed to take a few minutes can quietly take much longer on some shifts than on others.<\/p>\n<figure style=\"margin:32px 0;\"><img decoding=\"async\" src=\"https:\/\/teeptrak.com\/wp-content\/uploads\/2026\/11\/teeptrak-shiftwork-en.png\" alt=\"Four-step method to measure sanitation, changeover and shift start stops by shift pattern in a food and beverage plant\" width=\"1600\" height=\"900\" style=\"width:100%;height:auto;border-radius:8px;\" loading=\"lazy\" \/><\/figure>\n<h2 style=\"color:#232120;font-size:28px;margin-top:40px;margin-bottom:20px;\">Measuring each stop: a step by step method<\/h2>\n<p style=\"font-size:17px;line-height:1.8;color:#232120;margin-bottom:20px;\">The goal is to replace standard times with measured times, event by event, and then compare them across shift patterns. Here is a method that a production or continuous improvement team can run on one line before extending it.<\/p>\n<ol style=\"margin:0 0 20px 0;padding-left:24px;\">\n<li style=\"font-size:17px;line-height:1.8;color:#232120;margin-bottom:8px;\"><strong>Define the events precisely.<\/strong> Write down where each event starts and ends. For example: sanitation starts when the last product leaves the filler and ends when the first good product is produced after restart. Without shared definitions, two shifts will log the same event in two different ways.<\/li>\n<li style=\"font-size:17px;line-height:1.8;color:#232120;margin-bottom:8px;\"><strong>Capture every stop automatically, with its timestamp.<\/strong> Manual logs tend to round durations and miss short stops, especially at shift change, when everyone is busy. Automatic capture of line status gives the exact start and end of each stop, including the short ones.<\/li>\n<li style=\"font-size:17px;line-height:1.8;color:#232120;margin-bottom:8px;\"><strong>Add a simple reason for each stop.<\/strong> Operators qualify stops with a short list of reasons: sanitation, changeover (with the product pair), shift start, waiting for crew, waiting for quality release, restart. Keep the list short enough to be used at every stop.<\/li>\n<li style=\"font-size:17px;line-height:1.8;color:#232120;margin-bottom:8px;\"><strong>Tag each stop with its shift and shift pattern.<\/strong> Every stop must be attached to the shift and crew on duty, and to the pattern in place at the time (for example, a pattern with sanitation at the end of the last shift versus one with a dedicated sanitation window).<\/li>\n<li style=\"font-size:17px;line-height:1.8;color:#232120;margin-bottom:8px;\"><strong>Compare planned versus measured, event by event.<\/strong> For each event type, compare the planned duration in the schedule with the measured duration, then look at the spread between shifts, crews and product pairs.<\/li>\n<li style=\"font-size:17px;line-height:1.8;color:#232120;margin-bottom:8px;\"><strong>Feed the results back into schedule design.<\/strong> Use the measured durations, not the standard ones, when the schedule is reviewed or when a new pattern is tested.<\/li>\n<\/ol>\n<h2 style=\"color:#232120;font-size:28px;margin-top:40px;margin-bottom:20px;\">Reading the results by shift pattern<\/h2>\n<p style=\"font-size:17px;line-height:1.8;color:#232120;margin-bottom:20px;\">Once a few weeks of data are available, the same events can be compared from one shift pattern to another. The table below is an illustration of what such a comparison can look like. The figures are invented for the example and do not describe a real plant.<\/p>\n<table style=\"width:100%;border-collapse:collapse;margin:24px 0;font-size:15px;\">\n<thead>\n<tr>\n<th style=\"background:#232120;color:#fff;padding:10px;text-align:left;border:1px solid #ddd;\">Event (illustrative example)<\/th>\n<th style=\"background:#232120;color:#fff;padding:10px;text-align:left;border:1px solid #ddd;\">Planned in schedule<\/th>\n<th style=\"background:#232120;color:#fff;padding:10px;text-align:left;border:1px solid #ddd;\">Measured, pattern A<\/th>\n<th style=\"background:#232120;color:#fff;padding:10px;text-align:left;border:1px solid #ddd;\">Measured, pattern B<\/th>\n<th style=\"background:#232120;color:#fff;padding:10px;text-align:left;border:1px solid #ddd;\">What to look at<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td style=\"padding:10px;border:1px solid #ddd;vertical-align:top;color:#232120;\">Daily sanitation<\/td>\n<td style=\"padding:10px;border:1px solid #ddd;vertical-align:top;color:#232120;\">4 h<\/td>\n<td style=\"padding:10px;border:1px solid #ddd;vertical-align:top;color:#232120;\">4 h 50<\/td>\n<td style=\"padding:10px;border:1px solid #ddd;vertical-align:top;color:#232120;\">4 h 10<\/td>\n<td style=\"padding:10px;border:1px solid #ddd;vertical-align:top;color:#232120;\">Waiting for crew or inspection before and after cleaning<\/td>\n<\/tr>\n<tr>\n<td style=\"padding:10px;border:1px solid #ddd;vertical-align:top;color:#232120;\">Changeover, same allergen family<\/td>\n<td style=\"padding:10px;border:1px solid #ddd;vertical-align:top;color:#232120;\">45 min<\/td>\n<td style=\"padding:10px;border:1px solid #ddd;vertical-align:top;color:#232120;\">1 h 05<\/td>\n<td style=\"padding:10px;border:1px solid #ddd;vertical-align:top;color:#232120;\">50 min<\/td>\n<td style=\"padding:10px;border:1px solid #ddd;vertical-align:top;color:#232120;\">Which crew, which product pair, which shift<\/td>\n<\/tr>\n<tr>\n<td style=\"padding:10px;border:1px solid #ddd;vertical-align:top;color:#232120;\">Changeover, allergen change<\/td>\n<td style=\"padding:10px;border:1px solid #ddd;vertical-align:top;color:#232120;\">2 h<\/td>\n<td style=\"padding:10px;border:1px solid #ddd;vertical-align:top;color:#232120;\">2 h 40<\/td>\n<td style=\"padding:10px;border:1px solid #ddd;vertical-align:top;color:#232120;\">2 h 15<\/td>\n<td style=\"padding:10px;border:1px solid #ddd;vertical-align:top;color:#232120;\">Cleaning verification and release time<\/td>\n<\/tr>\n<tr>\n<td style=\"padding:10px;border:1px solid #ddd;vertical-align:top;color:#232120;\">Shift start to normal rate<\/td>\n<td style=\"padding:10px;border:1px solid #ddd;vertical-align:top;color:#232120;\">10 min<\/td>\n<td style=\"padding:10px;border:1px solid #ddd;vertical-align:top;color:#232120;\">25 min<\/td>\n<td style=\"padding:10px;border:1px solid #ddd;vertical-align:top;color:#232120;\">15 min<\/td>\n<td style=\"padding:10px;border:1px solid #ddd;vertical-align:top;color:#232120;\">Handover, material availability, first checks<\/td>\n<\/tr>\n<tr>\n<td style=\"padding:10px;border:1px solid #ddd;vertical-align:top;color:#232120;\">Restart after sanitation<\/td>\n<td style=\"padding:10px;border:1px solid #ddd;vertical-align:top;color:#232120;\">15 min<\/td>\n<td style=\"padding:10px;border:1px solid #ddd;vertical-align:top;color:#232120;\">35 min<\/td>\n<td style=\"padding:10px;border:1px solid #ddd;vertical-align:top;color:#232120;\">20 min<\/td>\n<td style=\"padding:10px;border:1px solid #ddd;vertical-align:top;color:#232120;\">Short stops and slow running during ramp-up<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p style=\"font-size:17px;line-height:1.8;color:#232120;margin-bottom:20px;\">In this example, pattern A does not look worse on paper: both patterns plan the same durations. The difference only appears when each event is measured. Three readings are usually the most useful:<\/p>\n<ul style=\"margin:0 0 20px 0;padding-left:24px;\">\n<li style=\"font-size:17px;line-height:1.8;color:#232120;margin-bottom:8px;\"><strong>The gap between planned and measured.<\/strong> A gap that repeats every day is capacity the schedule believes it has but does not.<\/li>\n<li style=\"font-size:17px;line-height:1.8;color:#232120;margin-bottom:8px;\"><strong>The spread between shifts.<\/strong> If the same changeover takes much longer on one shift, the issue is often staffing, sequencing or preparation on that shift, not the changeover itself.<\/li>\n<li style=\"font-size:17px;line-height:1.8;color:#232120;margin-bottom:8px;\"><strong>The time hidden around the event.<\/strong> Waiting for a crew, a quality release or materials before or after sanitation is often larger than the variation of the cleaning itself.<\/li>\n<\/ul>\n<p style=\"font-size:17px;line-height:1.8;color:#232120;margin-bottom:20px;\">These readings give schedule designers what they need: real durations, by event and by shift, that can be built into the next pattern instead of standard times.<\/p>\n<h2 style=\"color:#232120;font-size:28px;margin-top:40px;margin-bottom:20px;\">Turning measured stops into a better schedule<\/h2>\n<p style=\"font-size:17px;line-height:1.8;color:#232120;margin-bottom:20px;\">Measured data does not replace schedule design; it makes it more reliable. A few practical uses come up in most plants once the stops are visible.<\/p>\n<ul style=\"margin:0 0 20px 0;padding-left:24px;\">\n<li style=\"font-size:17px;line-height:1.8;color:#232120;margin-bottom:8px;\"><strong>Sizing the sanitation window.<\/strong> Base the window on measured durations, including restart, rather than on the cleaning procedure alone.<\/li>\n<li style=\"font-size:17px;line-height:1.8;color:#232120;margin-bottom:8px;\"><strong>Sequencing changeovers.<\/strong> Measured times by product pair show which sequences are short and which are long, and which shift handles them best.<\/li>\n<li style=\"font-size:17px;line-height:1.8;color:#232120;margin-bottom:8px;\"><strong>Testing a new pattern.<\/strong> Measure the same events before and after a change of pattern, on the same lines, so the comparison is fair.<\/li>\n<li style=\"font-size:17px;line-height:1.8;color:#232120;margin-bottom:8px;\"><strong>Following the effect of cross-training.<\/strong> If operators take on part of sanitation or changeovers, the measured durations show whether the time actually comes down, and on which shifts.<\/li>\n<li style=\"font-size:17px;line-height:1.8;color:#232120;margin-bottom:8px;\"><strong>Talking in hours, not percentages.<\/strong> Converting the gaps into hours of line time per week makes the discussion concrete for management and for the people who build the schedule.<\/li>\n<\/ul>\n<p style=\"font-size:17px;line-height:1.8;color:#232120;margin-bottom:20px;\">TEEPTRAK measures machine stops and OEE in real time on production lines, including the stops around sanitation, changeovers and shift starts. The hardware is a module wired in the electrical cabinet and a sensor at the line side: installation takes about one hour per machine, with no connection to the PLC, and OEE is available within 48 hours. Operators qualify stops with their own reasons, and every stop is attached to its shift. TEEPTRAK is used in more than 700 plants in more than 30 countries, where it delivers on average 10 to 15 points of OEE and 30% fewer unplanned stops.<\/p>\n<h3 style=\"color:#232120;font-size:22px;margin-top:32px;margin-bottom:14px;\">Further reading<\/h3>\n<ul style=\"margin:0 0 20px 0;padding-left:24px;\">\n<li style=\"font-size:17px;line-height:1.8;color:#232120;margin-bottom:8px;\"><a href=\"https:\/\/shift-work.com\/industries\/food-beverage-manufacturing\/\" target=\"_blank\" rel=\"noopener\">Shift Scheduling for Food &amp; Beverage Manufacturing: Unique Challenges and Proven Solutions<\/a>, Ethan Franklin, Shiftwork Solutions LLC<\/li>\n<li style=\"font-size:17px;line-height:1.8;color:#232120;margin-bottom:8px;\"><a href=\"https:\/\/teeptrak.com\/en\/oee-food-beverage-plants\/\">OEE for Food and Beverage Plants<\/a><\/li>\n<li style=\"font-size:17px;line-height:1.8;color:#232120;margin-bottom:8px;\"><a href=\"https:\/\/teeptrak.com\/en\/downtime-reason-codes\/\">Downtime Reason Codes: The Standard List and How to Use Them<\/a><\/li>\n<\/ul>\n<h2 style=\"color:#232120;font-size:28px;margin-top:40px;margin-bottom:20px;\">FAQ<\/h2>\n<p style=\"font-size:17px;line-height:1.8;color:#232120;margin-bottom:20px;\"><strong>Should sanitation be counted as downtime in OEE?<\/strong> It depends on how the plant defines planned production time. Many food plants treat planned sanitation as planned downtime, outside OEE, but still measure it separately. What matters is to measure the overruns, waits and restarts around it, which are real capacity losses either way.<\/p>\n<p style=\"font-size:17px;line-height:1.8;color:#232120;margin-bottom:20px;\"><strong>How long should we measure before comparing two shift patterns?<\/strong> Long enough to cover the normal product mix and every crew, so that each type of changeover and each shift appears several times. A comparison based on a single week can be distorted by one unusual event.<\/p>\n<p style=\"font-size:17px;line-height:1.8;color:#232120;margin-bottom:20px;\"><strong>Can shift start losses really be measured, since they are so short?<\/strong> Yes, if stops are captured automatically with their exact start and end time. Short stops and slow running at the start of a shift are typically what manual logs miss, which is why they are often underestimated.<\/p>\n<div style=\"background:#232120;color:white;padding:32px;border-radius:8px;margin:32px 0;text-align:center;\">\n<div style=\"font-size:18px;font-weight:bold;margin-bottom:8px;\">Your real OEE within days<\/div>\n<div style=\"font-size:14px;color:#ddd;margin-bottom:20px;\">Module wired in the electrical cabinet, sensor at the edge of the line, about one hour of installation per machine, no MES project and no production stop.<\/div>\n<p><a href=\"https:\/\/teeptrak.com\/fr\/demandez-une-demo\/\" style=\"display:inline-block;background:#EB352C;color:white;padding:14px 28px;text-decoration:none;border-radius:4px;font-weight:bold;\">Request a demo<\/a><\/div>\n<p><script type=\"application\/ld+json\">{\"@context\": \"https:\/\/schema.org\", \"@type\": \"FAQPage\", \"mainEntity\": [{\"@type\": \"Question\", \"name\": \"Should sanitation be counted as downtime in OEE?\", \"acceptedAnswer\": {\"@type\": \"Answer\", \"text\": \"It depends on how the plant defines planned production time. Many food plants treat planned sanitation as planned downtime, outside OEE, but still measure it separately. What matters is to measure the overruns, waits and restarts around it, which are real capacity losses either way.\"}}, {\"@type\": \"Question\", \"name\": \"How long should we measure before comparing two shift patterns?\", \"acceptedAnswer\": {\"@type\": \"Answer\", \"text\": \"Long enough to cover the normal product mix and every crew, so that each type of changeover and each shift appears several times. A comparison based on a single week can be distorted by one unusual event.\"}}, {\"@type\": \"Question\", \"name\": \"Can shift start losses really be measured, since they are so short?\", \"acceptedAnswer\": {\"@type\": \"Answer\", \"text\": \"Yes, if stops are captured automatically with their exact start and end time. Short stops and slow running at the start of a shift are typically what manual logs miss, which is why they are often underestimated.\"}}]}<\/script>[\/et_pb_text][\/et_pb_column][\/et_pb_row][\/et_pb_section]<\/p>\n","protected":false},"excerpt":{"rendered":"<p>[et_pb_section fb_built=&#8221;1&#8243; _builder_version=&#8221;4.27&#8243;][et_pb_row][et_pb_column type=&#8221;4_4&#8243;][et_pb_text] This article is for plant managers, production managers, continuous improvement leads and maintenance managers in food and beverage plants who are about to change a shift pattern, or who suspect the current one costs more line time than anyone has written down. Sanitation, product changeovers and the minutes around every shift [&hellip;]<\/p>\n","protected":false},"author":10,"featured_media":158474,"comment_status":"","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_yoast_wpseo_meta-robots-noindex":"","_yoast_wpseo_canonical":"","_et_pb_use_builder":"","_et_pb_old_content":"","_et_gb_content_width":"","ai_seo_title":"","ai_meta_description":"","ai_focus_keyword":"","footnotes":""},"categories":[101],"tags":[],"class_list":["post-158484","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-industrial-performance"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.8 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Sanitation and Changeover Downtime by Shift Pattern<\/title>\n<meta name=\"description\" content=\"How food and beverage plants can measure the line time lost to sanitation, changeovers and shift starts, stop by stop, to design better shift patterns.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/teeptrak.com\/en\/food-beverage-sanitation-changeover-downtime-shift-pattern\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Sanitation and Changeover Downtime by Shift Pattern\" \/>\n<meta property=\"og:description\" content=\"How food and beverage plants can measure the line time lost to sanitation, changeovers and shift starts, stop by stop, to design better shift patterns.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/teeptrak.com\/en\/food-beverage-sanitation-changeover-downtime-shift-pattern\/\" \/>\n<meta property=\"og:site_name\" content=\"TEEPTRAK\" \/>\n<meta property=\"article:published_time\" content=\"2026-11-03T08:50:03+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/teeptrak.com\/wp-content\/uploads\/2026\/11\/teeptrak-shiftwork-en.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1600\" \/>\n\t<meta property=\"og:image:height\" content=\"900\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"Alyssa Fleurette\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:creator\" content=\"@teeptrak\" \/>\n<meta name=\"twitter:site\" content=\"@teeptrak\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Alyssa Fleurette\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"8 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/teeptrak.com\\\/en\\\/food-beverage-sanitation-changeover-downtime-shift-pattern\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/teeptrak.com\\\/en\\\/food-beverage-sanitation-changeover-downtime-shift-pattern\\\/\"},\"author\":{\"name\":\"Alyssa Fleurette\",\"@id\":\"https:\\\/\\\/teeptrak.com\\\/en\\\/#\\\/schema\\\/person\\\/16457721232fa60fce067cf0a95a95d8\"},\"headline\":\"Sanitation, changeovers and shift starts in food and beverage plants: how much line time each shift pattern really loses\",\"datePublished\":\"2026-11-03T08:50:03+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/teeptrak.com\\\/en\\\/food-beverage-sanitation-changeover-downtime-shift-pattern\\\/\"},\"wordCount\":1623,\"publisher\":{\"@id\":\"https:\\\/\\\/teeptrak.com\\\/en\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/teeptrak.com\\\/en\\\/food-beverage-sanitation-changeover-downtime-shift-pattern\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/teeptrak.com\\\/wp-content\\\/uploads\\\/2026\\\/11\\\/teeptrak-shiftwork-en.png\",\"articleSection\":[\"Industrial Performance\"],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/teeptrak.com\\\/en\\\/food-beverage-sanitation-changeover-downtime-shift-pattern\\\/\",\"url\":\"https:\\\/\\\/teeptrak.com\\\/en\\\/food-beverage-sanitation-changeover-downtime-shift-pattern\\\/\",\"name\":\"Sanitation and Changeover Downtime by Shift Pattern\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/teeptrak.com\\\/en\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/teeptrak.com\\\/en\\\/food-beverage-sanitation-changeover-downtime-shift-pattern\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/teeptrak.com\\\/en\\\/food-beverage-sanitation-changeover-downtime-shift-pattern\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/teeptrak.com\\\/wp-content\\\/uploads\\\/2026\\\/11\\\/teeptrak-shiftwork-en.png\",\"datePublished\":\"2026-11-03T08:50:03+00:00\",\"description\":\"How food and beverage plants can measure the line time lost to sanitation, changeovers and shift starts, stop by stop, to design better shift patterns.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/teeptrak.com\\\/en\\\/food-beverage-sanitation-changeover-downtime-shift-pattern\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/teeptrak.com\\\/en\\\/food-beverage-sanitation-changeover-downtime-shift-pattern\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/teeptrak.com\\\/en\\\/food-beverage-sanitation-changeover-downtime-shift-pattern\\\/#primaryimage\",\"url\":\"https:\\\/\\\/teeptrak.com\\\/wp-content\\\/uploads\\\/2026\\\/11\\\/teeptrak-shiftwork-en.png\",\"contentUrl\":\"https:\\\/\\\/teeptrak.com\\\/wp-content\\\/uploads\\\/2026\\\/11\\\/teeptrak-shiftwork-en.png\",\"width\":1600,\"height\":900,\"caption\":\"Four-step method to measure sanitation, changeover and shift start stops by shift pattern in a food and beverage plant\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/teeptrak.com\\\/en\\\/food-beverage-sanitation-changeover-downtime-shift-pattern\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Accueil\",\"item\":\"https:\\\/\\\/teeptrak.com\\\/en\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Sanitation, changeovers and shift starts in food and beverage plants: how much line time each shift pattern really loses\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/teeptrak.com\\\/en\\\/#website\",\"url\":\"https:\\\/\\\/teeptrak.com\\\/en\\\/\",\"name\":\"TEEPTRAK\",\"description\":\"Optimisez votre potentiel industriel\",\"publisher\":{\"@id\":\"https:\\\/\\\/teeptrak.com\\\/en\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/teeptrak.com\\\/en\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/teeptrak.com\\\/en\\\/#organization\",\"name\":\"TeepTrak\",\"url\":\"https:\\\/\\\/teeptrak.com\\\/en\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/teeptrak.com\\\/en\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/teeptrak.com\\\/wp-content\\\/uploads\\\/2026\\\/07\\\/TeepTrak_Logo-PNG-1-scaled.png\",\"contentUrl\":\"https:\\\/\\\/teeptrak.com\\\/wp-content\\\/uploads\\\/2026\\\/07\\\/TeepTrak_Logo-PNG-1-scaled.png\",\"width\":2880,\"height\":528,\"caption\":\"TeepTrak\"},\"image\":{\"@id\":\"https:\\\/\\\/teeptrak.com\\\/en\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/x.com\\\/teeptrak\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/teeptrak\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/teeptrakinternational\\\/\",\"https:\\\/\\\/www.youtube.com\\\/@teeptrak\\\/videos\",\"https:\\\/\\\/www.instagram.com\\\/teeptrak\\\/\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/teeptrak.com\\\/en\\\/#\\\/schema\\\/person\\\/16457721232fa60fce067cf0a95a95d8\",\"name\":\"Alyssa Fleurette\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/ac9dbd3bd4dd1699205324f9604e5cfe3ba1c748b1b7c2b2c06326350e48e966?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/ac9dbd3bd4dd1699205324f9604e5cfe3ba1c748b1b7c2b2c06326350e48e966?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/ac9dbd3bd4dd1699205324f9604e5cfe3ba1c748b1b7c2b2c06326350e48e966?s=96&d=mm&r=g\",\"caption\":\"Alyssa Fleurette\"}}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Sanitation and Changeover Downtime by Shift Pattern","description":"How food and beverage plants can measure the line time lost to sanitation, changeovers and shift starts, stop by stop, to design better shift patterns.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/teeptrak.com\/en\/food-beverage-sanitation-changeover-downtime-shift-pattern\/","og_locale":"en_US","og_type":"article","og_title":"Sanitation and Changeover Downtime by Shift Pattern","og_description":"How food and beverage plants can measure the line time lost to sanitation, changeovers and shift starts, stop by stop, to design better shift patterns.","og_url":"https:\/\/teeptrak.com\/en\/food-beverage-sanitation-changeover-downtime-shift-pattern\/","og_site_name":"TEEPTRAK","article_published_time":"2026-11-03T08:50:03+00:00","og_image":[{"width":1600,"height":900,"url":"https:\/\/teeptrak.com\/wp-content\/uploads\/2026\/11\/teeptrak-shiftwork-en.png","type":"image\/png"}],"author":"Alyssa Fleurette","twitter_card":"summary_large_image","twitter_creator":"@teeptrak","twitter_site":"@teeptrak","twitter_misc":{"Written by":"Alyssa Fleurette","Est. reading time":"8 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/teeptrak.com\/en\/food-beverage-sanitation-changeover-downtime-shift-pattern\/#article","isPartOf":{"@id":"https:\/\/teeptrak.com\/en\/food-beverage-sanitation-changeover-downtime-shift-pattern\/"},"author":{"name":"Alyssa Fleurette","@id":"https:\/\/teeptrak.com\/en\/#\/schema\/person\/16457721232fa60fce067cf0a95a95d8"},"headline":"Sanitation, changeovers and shift starts in food and beverage plants: how much line time each shift pattern really loses","datePublished":"2026-11-03T08:50:03+00:00","mainEntityOfPage":{"@id":"https:\/\/teeptrak.com\/en\/food-beverage-sanitation-changeover-downtime-shift-pattern\/"},"wordCount":1623,"publisher":{"@id":"https:\/\/teeptrak.com\/en\/#organization"},"image":{"@id":"https:\/\/teeptrak.com\/en\/food-beverage-sanitation-changeover-downtime-shift-pattern\/#primaryimage"},"thumbnailUrl":"https:\/\/teeptrak.com\/wp-content\/uploads\/2026\/11\/teeptrak-shiftwork-en.png","articleSection":["Industrial Performance"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/teeptrak.com\/en\/food-beverage-sanitation-changeover-downtime-shift-pattern\/","url":"https:\/\/teeptrak.com\/en\/food-beverage-sanitation-changeover-downtime-shift-pattern\/","name":"Sanitation and Changeover Downtime by Shift Pattern","isPartOf":{"@id":"https:\/\/teeptrak.com\/en\/#website"},"primaryImageOfPage":{"@id":"https:\/\/teeptrak.com\/en\/food-beverage-sanitation-changeover-downtime-shift-pattern\/#primaryimage"},"image":{"@id":"https:\/\/teeptrak.com\/en\/food-beverage-sanitation-changeover-downtime-shift-pattern\/#primaryimage"},"thumbnailUrl":"https:\/\/teeptrak.com\/wp-content\/uploads\/2026\/11\/teeptrak-shiftwork-en.png","datePublished":"2026-11-03T08:50:03+00:00","description":"How food and beverage plants can measure the line time lost to sanitation, changeovers and shift starts, stop by stop, to design better shift patterns.","breadcrumb":{"@id":"https:\/\/teeptrak.com\/en\/food-beverage-sanitation-changeover-downtime-shift-pattern\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/teeptrak.com\/en\/food-beverage-sanitation-changeover-downtime-shift-pattern\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/teeptrak.com\/en\/food-beverage-sanitation-changeover-downtime-shift-pattern\/#primaryimage","url":"https:\/\/teeptrak.com\/wp-content\/uploads\/2026\/11\/teeptrak-shiftwork-en.png","contentUrl":"https:\/\/teeptrak.com\/wp-content\/uploads\/2026\/11\/teeptrak-shiftwork-en.png","width":1600,"height":900,"caption":"Four-step method to measure sanitation, changeover and shift start stops by shift pattern in a food and beverage plant"},{"@type":"BreadcrumbList","@id":"https:\/\/teeptrak.com\/en\/food-beverage-sanitation-changeover-downtime-shift-pattern\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Accueil","item":"https:\/\/teeptrak.com\/en\/"},{"@type":"ListItem","position":2,"name":"Sanitation, changeovers and shift starts in food and beverage plants: how much line time each shift pattern really loses"}]},{"@type":"WebSite","@id":"https:\/\/teeptrak.com\/en\/#website","url":"https:\/\/teeptrak.com\/en\/","name":"TEEPTRAK","description":"Optimisez votre potentiel industriel","publisher":{"@id":"https:\/\/teeptrak.com\/en\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/teeptrak.com\/en\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/teeptrak.com\/en\/#organization","name":"TeepTrak","url":"https:\/\/teeptrak.com\/en\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/teeptrak.com\/en\/#\/schema\/logo\/image\/","url":"https:\/\/teeptrak.com\/wp-content\/uploads\/2026\/07\/TeepTrak_Logo-PNG-1-scaled.png","contentUrl":"https:\/\/teeptrak.com\/wp-content\/uploads\/2026\/07\/TeepTrak_Logo-PNG-1-scaled.png","width":2880,"height":528,"caption":"TeepTrak"},"image":{"@id":"https:\/\/teeptrak.com\/en\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/x.com\/teeptrak","https:\/\/www.linkedin.com\/company\/teeptrak\/","https:\/\/www.linkedin.com\/company\/teeptrakinternational\/","https:\/\/www.youtube.com\/@teeptrak\/videos","https:\/\/www.instagram.com\/teeptrak\/"]},{"@type":"Person","@id":"https:\/\/teeptrak.com\/en\/#\/schema\/person\/16457721232fa60fce067cf0a95a95d8","name":"Alyssa Fleurette","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/secure.gravatar.com\/avatar\/ac9dbd3bd4dd1699205324f9604e5cfe3ba1c748b1b7c2b2c06326350e48e966?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/ac9dbd3bd4dd1699205324f9604e5cfe3ba1c748b1b7c2b2c06326350e48e966?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/ac9dbd3bd4dd1699205324f9604e5cfe3ba1c748b1b7c2b2c06326350e48e966?s=96&d=mm&r=g","caption":"Alyssa Fleurette"}}]}},"_links":{"self":[{"href":"https:\/\/teeptrak.com\/en\/wp-json\/wp\/v2\/posts\/158484","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/teeptrak.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/teeptrak.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/teeptrak.com\/en\/wp-json\/wp\/v2\/users\/10"}],"replies":[{"embeddable":true,"href":"https:\/\/teeptrak.com\/en\/wp-json\/wp\/v2\/comments?post=158484"}],"version-history":[{"count":0,"href":"https:\/\/teeptrak.com\/en\/wp-json\/wp\/v2\/posts\/158484\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/teeptrak.com\/en\/wp-json\/wp\/v2\/media\/158474"}],"wp:attachment":[{"href":"https:\/\/teeptrak.com\/en\/wp-json\/wp\/v2\/media?parent=158484"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/teeptrak.com\/en\/wp-json\/wp\/v2\/categories?post=158484"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/teeptrak.com\/en\/wp-json\/wp\/v2\/tags?post=158484"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}