{"id":156646,"date":"2026-11-02T09:41:42","date_gmt":"2026-11-02T09:41:42","guid":{"rendered":"https:\/\/teeptrak.com\/sustaining-smed-gains-changeover-tracking\/"},"modified":"2026-11-02T09:41:42","modified_gmt":"2026-11-02T09:41:42","slug":"sustaining-smed-gains-changeover-tracking","status":"publish","type":"post","link":"https:\/\/teeptrak.com\/en\/sustaining-smed-gains-changeover-tracking\/","title":{"rendered":"Sustaining SMED gains: measure every changeover after the project"},"content":{"rendered":"<p>[et_pb_section fb_built=&#8221;1&#8243; _builder_version=&#8221;4.27&#8243;][et_pb_row][et_pb_column type=&#8221;4_4&#8243;][et_pb_text]<\/p>\n<p style=\"font-size:17px;line-height:1.8;color:#232120;margin-bottom:20px;\">This article is for production managers, manufacturing engineers, continuous improvement leads and plant managers who have run a SMED project and want the changeover time they gained to still be there six months later. The project itself is well documented. What comes after is not: how to check, machine by machine, that changeovers stay short once the project team has moved on, and what to do when they start to creep back up.<\/p>\n<div style=\"background:#f7f5f3;border-left:4px solid #EB352B;border-radius:6px;padding:20px 24px;margin:24px 0 32px;\">\n<div style=\"font-size:15px;font-weight:bold;color:#232120;margin-bottom:10px;text-transform:uppercase;letter-spacing:1px;\">In short<\/div>\n<ul style=\"font-size:16px;line-height:1.7;color:#232120;margin:0;padding-left:20px;\">\n<li style=\"margin-bottom:6px;\">SMED gains often erode within a few months, without anyone noticing.<\/li>\n<li style=\"margin-bottom:6px;\">Track every changeover, by machine and by shift, with the rules used in the project.<\/li>\n<li style=\"margin-bottom:6px;\">Reviews at 3 and 6 months decide: validate the standard or relaunch a targeted workshop.<\/li>\n<li style=\"margin-bottom:6px;\">A posted standard, newcomer training and short routines keep the gain over time.<\/li>\n<\/ul>\n<\/div>\n<h2 style=\"color:#232120;font-size:28px;margin-top:40px;margin-bottom:20px;\">What the SMED method says about the follow-up<\/h2>\n<blockquote style=\"border-left:5px solid #232120;background:#f7f5f3;margin:28px 0;padding:20px 26px;font-size:19px;line-height:1.7;color:#232120;font-style:normal;\"><p>GH Training, a French training provider specialising in lean management and Lean Six Sigma, published <a href=\"https:\/\/www.ghtraining.com\/blog\/lean-management\/la-methode-smed-tout-comprendre\/\" target=\"_blank\" rel=\"noopener\">La m\u00e9thode SMED : Tout comprendre<\/a> (in French). The article recalls the origin of the method (created by Shigeo Shingo, an engineer at Toyota) and its goal, bringing a changeover from several hours down to under 10 minutes, then describes its four steps: measure the current state, move as many internal operations as possible to external, reduce the time of internal tasks and, finally, continuous improvement. On that last step, the wording is clear: &#8220;Le but est de continuer \u00e0 am\u00e9liorer les temps de changement de s\u00e9rie en pilotant un indicateur associ\u00e9 [\u2026]&#8221; (in other words: the aim is to keep improving changeover times by tracking an associated indicator).<\/p><\/blockquote>\n<p style=\"font-size:17px;line-height:1.8;color:#232120;margin-bottom:20px;\">Their article provides the method. This one focuses on the indicator in step 4: how to build it so that it shows, changeover by changeover, whether the project gain is holding, and when it starts to slip. For how data supports the SMED project itself, see our article <a href=\"https:\/\/teeptrak.com\/en\/smed-changeover-time-reduction-oee\/\">SMED: How to Reduce Changeover Time and Improve OEE with Data<\/a>. Here we assume the changeover definition is already set: from the last good part of the outgoing run to the first good part at nominal speed.<\/p>\n<h2 style=\"color:#232120;font-size:28px;margin-top:40px;margin-bottom:20px;\">Why the time you gained comes back<\/h2>\n<p style=\"font-size:17px;line-height:1.8;color:#232120;margin-bottom:20px;\">Shop floor teams know the pattern. On the day of the project review, the timed changeover is impressive. Three months later, nobody has timed it again, and the general feeling is that &#8220;it is more or less holding&#8221;. The causes of drift are rarely dramatic:<\/p>\n<ul style=\"margin:0 0 20px 0;padding-left:24px;\">\n<li style=\"font-size:17px;line-height:1.8;color:#232120;margin-bottom:8px;\"><strong>Not every shift follows the standard.<\/strong> The team that took part in the project uses the new sequence; the night shift, or the temp who arrived after the training, goes back to old habits.<\/li>\n<li style=\"font-size:17px;line-height:1.8;color:#232120;margin-bottom:8px;\"><strong>External operations become internal again.<\/strong> The tooling cart is no longer prepared before the stop, the next tool is not preheated, the wrench is not in its place: each slip adds minutes of machine downtime.<\/li>\n<li style=\"font-size:17px;line-height:1.8;color:#232120;margin-bottom:8px;\"><strong>Adjustment quietly gets longer.<\/strong> Trial runs and tweaks after restart creep up, ramp-up stretches out, and a stopwatch that only times the stop does not see it.<\/li>\n<li style=\"font-size:17px;line-height:1.8;color:#232120;margin-bottom:8px;\"><strong>Nobody looks at the indicator at the right level.<\/strong> Changeover time is tracked as a monthly average for the whole shop. One drifting machine disappears among the others.<\/li>\n<\/ul>\n<p style=\"font-size:17px;line-height:1.8;color:#232120;margin-bottom:20px;\">In every case, the problem is not the method. It is the lack of a measurement fine enough to see the drift before it settles in.<\/p>\n<figure style=\"margin:32px 0;\"><img decoding=\"async\" src=\"https:\/\/teeptrak.com\/wp-content\/uploads\/2026\/11\/teeptrak-smed-durabilite-en.png\" alt=\"Four-step method to sustain SMED gains: lock the reference, measure every changeover, review at 3 months, decide at 6 months\" width=\"1600\" height=\"900\" style=\"width:100%;height:auto;border-radius:8px;\" loading=\"lazy\" \/><\/figure>\n<h2 style=\"color:#232120;font-size:28px;margin-top:40px;margin-bottom:20px;\">Measure every changeover, machine by machine<\/h2>\n<p style=\"font-size:17px;line-height:1.8;color:#232120;margin-bottom:20px;\">To sustain a SMED gain, the indicator must be calculated for every changeover, on every machine involved, with the same rules used during the project. A monthly shop average is not enough: it smooths out exactly what you are trying to see. The table below sums up what to track after the project.<\/p>\n<table style=\"width:100%;border-collapse:collapse;margin:24px 0;font-size:15px;\">\n<thead>\n<tr>\n<th style=\"background:#232120;color:#fff;padding:10px;text-align:left;border:1px solid #ddd;\">What you track<\/th>\n<th style=\"background:#232120;color:#fff;padding:10px;text-align:left;border:1px solid #ddd;\">What it reveals<\/th>\n<th style=\"background:#232120;color:#fff;padding:10px;text-align:left;border:1px solid #ddd;\">Review<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td style=\"padding:10px;border:1px solid #ddd;vertical-align:top;color:#232120;\">Duration of each changeover, from last good part to first good part at nominal speed<\/td>\n<td style=\"padding:10px;border:1px solid #ddd;vertical-align:top;color:#232120;\">The actual level, compared with the target set at the end of the project<\/td>\n<td style=\"padding:10px;border:1px solid #ddd;vertical-align:top;color:#232120;\">Weekly<\/td>\n<\/tr>\n<tr>\n<td style=\"padding:10px;border:1px solid #ddd;vertical-align:top;color:#232120;\">Gap between shifts on the same type of changeover<\/td>\n<td style=\"padding:10px;border:1px solid #ddd;vertical-align:top;color:#232120;\">A standard that only some shifts apply<\/td>\n<td style=\"padding:10px;border:1px solid #ddd;vertical-align:top;color:#232120;\">Weekly<\/td>\n<\/tr>\n<tr>\n<td style=\"padding:10px;border:1px solid #ddd;vertical-align:top;color:#232120;\">Spread: shortest and longest changeover of the period<\/td>\n<td style=\"padding:10px;border:1px solid #ddd;vertical-align:top;color:#232120;\">An unstable standard, even when the average looks fine<\/td>\n<td style=\"padding:10px;border:1px solid #ddd;vertical-align:top;color:#232120;\">Monthly<\/td>\n<\/tr>\n<tr>\n<td style=\"padding:10px;border:1px solid #ddd;vertical-align:top;color:#232120;\">Number of changeovers per machine<\/td>\n<td style=\"padding:10px;border:1px solid #ddd;vertical-align:top;color:#232120;\">The real weight of the unit gain, which depends on frequency<\/td>\n<td style=\"padding:10px;border:1px solid #ddd;vertical-align:top;color:#232120;\">Monthly<\/td>\n<\/tr>\n<tr>\n<td style=\"padding:10px;border:1px solid #ddd;vertical-align:top;color:#232120;\">Total changeover time per machine<\/td>\n<td style=\"padding:10px;border:1px solid #ddd;vertical-align:top;color:#232120;\">The share of changeovers in availability losses and in OEE<\/td>\n<td style=\"padding:10px;border:1px solid #ddd;vertical-align:top;color:#232120;\">At the 3-month and 6-month reviews<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p style=\"font-size:17px;line-height:1.8;color:#232120;margin-bottom:20px;\">Two rules prevent pointless debates. First, keep the same definition of the start and end of a changeover as during the project: if the baseline included ramp-up, tracking must include it too. Second, compare like with like: a changeover between two similar part numbers does not take as long as a change of product family. A changeover matrix (from product, to product) keeps the comparison fair.<\/p>\n<h2 style=\"color:#232120;font-size:28px;margin-top:40px;margin-bottom:20px;\">The 3-month and 6-month reviews<\/h2>\n<p style=\"font-size:17px;line-height:1.8;color:#232120;margin-bottom:20px;\">A SMED gain is judged over time, not on the day of the project review. A formal review at 3 months and again at 6 months, prepared with data from every changeover, settles the question without argument. A simple five-step method:<\/p>\n<ol style=\"margin:0 0 20px 0;padding-left:24px;\">\n<li style=\"font-size:17px;line-height:1.8;color:#232120;margin-bottom:8px;\"><strong>Lock the reference at the end of the project.<\/strong> Target duration per changeover type, start and end definition, list of machines. These rules do not change during tracking.<\/li>\n<li style=\"font-size:17px;line-height:1.8;color:#232120;margin-bottom:8px;\"><strong>Set an alert threshold between reviews.<\/strong> For example, if a changeover type brought down to 25 minutes goes back above 30 minutes two weeks in a row, the gap is dealt with immediately, without waiting for the 3-month review.<\/li>\n<li style=\"font-size:17px;line-height:1.8;color:#232120;margin-bottom:8px;\"><strong>At 3 months, compare by machine and by shift.<\/strong> Median duration, spread, gaps between shifts. A drifting machine is a machine where the standard is no longer applied: go to the gemba and find out why.<\/li>\n<li style=\"font-size:17px;line-height:1.8;color:#232120;margin-bottom:8px;\"><strong>At 6 months, decide.<\/strong> If the gain is holding, the standard is validated and the project can be replicated on another machine. If it has eroded, launch a short targeted workshop on the operations that slipped, rather than starting over.<\/li>\n<li style=\"font-size:17px;line-height:1.8;color:#232120;margin-bottom:8px;\"><strong>Name an owner for the follow-up.<\/strong> A name, not a job title: the person who presents the figures at each review and triggers the targeted workshop when needed.<\/li>\n<\/ol>\n<h2 style=\"color:#232120;font-size:28px;margin-top:40px;margin-bottom:20px;\">Standards and routines: what keeps the gain<\/h2>\n<p style=\"font-size:17px;line-height:1.8;color:#232120;margin-bottom:20px;\">Measurement shows the drift; standards and routines prevent it. A few practices that make the difference on the shop floor:<\/p>\n<ul style=\"margin:0 0 20px 0;padding-left:24px;\">\n<li style=\"font-size:17px;line-height:1.8;color:#232120;margin-bottom:8px;\"><strong>A changeover standard posted at the workstation<\/strong>, with the sequence, the split between external and internal operations, and the target duration. It is updated after each improvement, otherwise it describes a changeover that no longer exists.<\/li>\n<li style=\"font-size:17px;line-height:1.8;color:#232120;margin-bottom:8px;\"><strong>Training every newcomer on the standard<\/strong>, temps and night shifts included.<\/li>\n<li style=\"font-size:17px;line-height:1.8;color:#232120;margin-bottom:8px;\"><strong>Five minutes in the start-of-shift meeting<\/strong> on the previous day&#8217;s changeovers: which ones exceeded the target, and why.<\/li>\n<li style=\"font-size:17px;line-height:1.8;color:#232120;margin-bottom:8px;\"><strong>A monthly review of overruns<\/strong> with manufacturing engineering and maintenance, to turn recurring causes into actions.<\/li>\n<li style=\"font-size:17px;line-height:1.8;color:#232120;margin-bottom:8px;\"><strong>Collecting operators&#8217; ideas<\/strong>, as the continuous improvement step described by GH Training recommends: the people who do changeovers every day see the minutes to be gained.<\/li>\n<\/ul>\n<p style=\"font-size:17px;line-height:1.8;color:#232120;margin-bottom:20px;\">Without data for each changeover, these routines run on opinions. With it, every meeting starts from a fact (yesterday&#8217;s changeover on a given machine took this long) and the team focuses on the gap to target.<\/p>\n<p style=\"font-size:17px;line-height:1.8;color:#232120;margin-bottom:20px;\">This is where TEEPTRAK comes in. It measures OEE, downtime and micro-stops in real time: a module wired into the electrical cabinet and a sensor at the line, about one hour of installation per machine, no PLC connection, and OEE available within 48 hours. Every stop, changeovers included, is time-stamped and its duration recorded automatically, which gives SMED tracking the same data from one week to the next, with no stopwatch and no manual entry. TEEPTRAK does not replace the SMED method or team training: it provides the measurement that shows whether the gain is holding. More than 700 plants in over 30 countries use it.<\/p>\n<h3 style=\"color:#232120;font-size:22px;margin-top:32px;margin-bottom:14px;\">Further reading<\/h3>\n<ul style=\"margin:0 0 20px 0;padding-left:24px;\">\n<li style=\"font-size:17px;line-height:1.8;color:#232120;margin-bottom:8px;\"><a href=\"https:\/\/www.ghtraining.com\/blog\/lean-management\/la-methode-smed-tout-comprendre\/\" target=\"_blank\" rel=\"noopener\">La m\u00e9thode SMED : Tout comprendre<\/a> (GH Training, in French)<\/li>\n<li style=\"font-size:17px;line-height:1.8;color:#232120;margin-bottom:8px;\"><a href=\"https:\/\/teeptrak.com\/en\/smed-changeover-time-reduction-oee\/\">SMED: How to Reduce Changeover Time and Improve OEE with Data<\/a><\/li>\n<li style=\"font-size:17px;line-height:1.8;color:#232120;margin-bottom:8px;\"><a href=\"https:\/\/teeptrak.com\/en\/eliminate-micro-stops-pareto-smed\/\">Eliminating Micro-Stops: Pareto, Top 3 Root Causes, and Targeted SMED Project<\/a><\/li>\n<\/ul>\n<h2 style=\"color:#232120;font-size:28px;margin-top:40px;margin-bottom:20px;\">FAQ<\/h2>\n<p style=\"font-size:17px;line-height:1.8;color:#232120;margin-bottom:20px;\"><strong>How long should a SMED project be tracked after the review?<\/strong> At least six months formally, with one review at 3 months and another at 6 months. After that, changeover time joins the routine indicators, tracked machine by machine like the rest of OEE.<\/p>\n<p style=\"font-size:17px;line-height:1.8;color:#232120;margin-bottom:20px;\"><strong>Is a one-off stopwatch check enough to confirm the gain is holding?<\/strong> It gives a snapshot of one changeover, often done by the best-trained shift on the day someone is watching. Drift shows up in the series of all changeovers, across all shifts, which a one-off check cannot capture.<\/p>\n<p style=\"font-size:17px;line-height:1.8;color:#232120;margin-bottom:20px;\"><strong>What should you do if changeover time creeps back up after a few months?<\/strong> First find out where: which machine, which changeover type, which shift. Then go and see which operations have become internal again or have slipped. A short targeted workshop on those operations, followed by an update of the standard, is often enough.<\/p>\n<div style=\"background:#232120;color:white;padding:32px;border-radius:8px;margin:32px 0;text-align:center;\">\n<div style=\"font-size:18px;font-weight:bold;margin-bottom:8px;\">Your real OEE within days<\/div>\n<div style=\"font-size:14px;color:#ddd;margin-bottom:20px;\">Module wired in the electrical cabinet, sensor at the edge of the line, about one hour of installation per machine, no MES project and no production stop.<\/div>\n<p><a href=\"https:\/\/teeptrak.com\/fr\/demandez-une-demo\/\" style=\"display:inline-block;background:#EB352C;color:white;padding:14px 28px;text-decoration:none;border-radius:4px;font-weight:bold;\">Request a demo<\/a><\/div>\n<p><script type=\"application\/ld+json\">{\"@context\": \"https:\/\/schema.org\", \"@type\": \"FAQPage\", \"mainEntity\": [{\"@type\": \"Question\", \"name\": \"How long should a SMED project be tracked after the review?\", \"acceptedAnswer\": {\"@type\": \"Answer\", \"text\": \"At least six months formally, with one review at 3 months and another at 6 months. After that, changeover time joins the routine indicators, tracked machine by machine like the rest of OEE.\"}}, {\"@type\": \"Question\", \"name\": \"Is a one-off stopwatch check enough to confirm the gain is holding?\", \"acceptedAnswer\": {\"@type\": \"Answer\", \"text\": \"It gives a snapshot of one changeover, often done by the best-trained shift on the day someone is watching. Drift shows up in the series of all changeovers, across all shifts, which a one-off check cannot capture.\"}}, {\"@type\": \"Question\", \"name\": \"What should you do if changeover time creeps back up after a few months?\", \"acceptedAnswer\": {\"@type\": \"Answer\", \"text\": \"First find out where: which machine, which changeover type, which shift. Then go and see which operations have become internal again or have slipped. A short targeted workshop on those operations, followed by an update of the standard, is often enough.\"}}]}<\/script>[\/et_pb_text][\/et_pb_column][\/et_pb_row][\/et_pb_section]<\/p>\n","protected":false},"excerpt":{"rendered":"<p>[et_pb_section fb_built=&#8221;1&#8243; _builder_version=&#8221;4.27&#8243;][et_pb_row][et_pb_column type=&#8221;4_4&#8243;][et_pb_text] This article is for production managers, manufacturing engineers, continuous improvement leads and plant managers who have run a SMED project and want the changeover time they gained to still be there six months later. The project itself is well documented. What comes after is not: how to check, machine by machine, [&hellip;]<\/p>\n","protected":false},"author":10,"featured_media":156636,"comment_status":"","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_yoast_wpseo_meta-robots-noindex":"","_yoast_wpseo_canonical":"","_et_pb_use_builder":"","_et_pb_old_content":"","_et_gb_content_width":"","ai_seo_title":"","ai_meta_description":"","ai_focus_keyword":"","footnotes":""},"categories":[142],"tags":[],"class_list":["post-156646","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-lean-manufacturing-en"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.8 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Sustaining SMED gains after the project<\/title>\n<meta name=\"description\" content=\"After a SMED project, changeover time often drifts back. How to track it machine by machine, with reviews at 3 and 6 months.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/teeptrak.com\/en\/sustaining-smed-gains-changeover-tracking\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Sustaining SMED gains after the project\" \/>\n<meta property=\"og:description\" content=\"After a SMED project, changeover time often drifts back. How to track it machine by machine, with reviews at 3 and 6 months.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/teeptrak.com\/en\/sustaining-smed-gains-changeover-tracking\/\" \/>\n<meta property=\"og:site_name\" content=\"TEEPTRAK\" \/>\n<meta property=\"article:published_time\" content=\"2026-11-02T09:41:42+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/teeptrak.com\/wp-content\/uploads\/2026\/11\/teeptrak-smed-durabilite-en.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1600\" \/>\n\t<meta property=\"og:image:height\" content=\"900\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"Alyssa Fleurette\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:creator\" content=\"@teeptrak\" \/>\n<meta name=\"twitter:site\" content=\"@teeptrak\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Alyssa Fleurette\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"7 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/teeptrak.com\\\/en\\\/sustaining-smed-gains-changeover-tracking\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/teeptrak.com\\\/en\\\/sustaining-smed-gains-changeover-tracking\\\/\"},\"author\":{\"name\":\"Alyssa Fleurette\",\"@id\":\"https:\\\/\\\/teeptrak.com\\\/en\\\/#\\\/schema\\\/person\\\/16457721232fa60fce067cf0a95a95d8\"},\"headline\":\"Sustaining SMED gains: measure every changeover after the project\",\"datePublished\":\"2026-11-02T09:41:42+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/teeptrak.com\\\/en\\\/sustaining-smed-gains-changeover-tracking\\\/\"},\"wordCount\":1518,\"publisher\":{\"@id\":\"https:\\\/\\\/teeptrak.com\\\/en\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/teeptrak.com\\\/en\\\/sustaining-smed-gains-changeover-tracking\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/teeptrak.com\\\/wp-content\\\/uploads\\\/2026\\\/11\\\/teeptrak-smed-durabilite-en.png\",\"articleSection\":[\"Lean Manufacturing\"],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/teeptrak.com\\\/en\\\/sustaining-smed-gains-changeover-tracking\\\/\",\"url\":\"https:\\\/\\\/teeptrak.com\\\/en\\\/sustaining-smed-gains-changeover-tracking\\\/\",\"name\":\"Sustaining SMED gains after the project\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/teeptrak.com\\\/en\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/teeptrak.com\\\/en\\\/sustaining-smed-gains-changeover-tracking\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/teeptrak.com\\\/en\\\/sustaining-smed-gains-changeover-tracking\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/teeptrak.com\\\/wp-content\\\/uploads\\\/2026\\\/11\\\/teeptrak-smed-durabilite-en.png\",\"datePublished\":\"2026-11-02T09:41:42+00:00\",\"description\":\"After a SMED project, changeover time often drifts back. How to track it machine by machine, with reviews at 3 and 6 months.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/teeptrak.com\\\/en\\\/sustaining-smed-gains-changeover-tracking\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/teeptrak.com\\\/en\\\/sustaining-smed-gains-changeover-tracking\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/teeptrak.com\\\/en\\\/sustaining-smed-gains-changeover-tracking\\\/#primaryimage\",\"url\":\"https:\\\/\\\/teeptrak.com\\\/wp-content\\\/uploads\\\/2026\\\/11\\\/teeptrak-smed-durabilite-en.png\",\"contentUrl\":\"https:\\\/\\\/teeptrak.com\\\/wp-content\\\/uploads\\\/2026\\\/11\\\/teeptrak-smed-durabilite-en.png\",\"width\":1600,\"height\":900,\"caption\":\"Four-step method to sustain SMED gains: lock the reference, measure every changeover, review at 3 months, decide at 6 months\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/teeptrak.com\\\/en\\\/sustaining-smed-gains-changeover-tracking\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Accueil\",\"item\":\"https:\\\/\\\/teeptrak.com\\\/en\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Sustaining SMED gains: measure every changeover after the project\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/teeptrak.com\\\/en\\\/#website\",\"url\":\"https:\\\/\\\/teeptrak.com\\\/en\\\/\",\"name\":\"TEEPTRAK\",\"description\":\"Optimisez votre potentiel industriel\",\"publisher\":{\"@id\":\"https:\\\/\\\/teeptrak.com\\\/en\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/teeptrak.com\\\/en\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/teeptrak.com\\\/en\\\/#organization\",\"name\":\"TeepTrak\",\"url\":\"https:\\\/\\\/teeptrak.com\\\/en\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/teeptrak.com\\\/en\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/teeptrak.com\\\/wp-content\\\/uploads\\\/2026\\\/07\\\/TeepTrak_Logo-PNG-1-scaled.png\",\"contentUrl\":\"https:\\\/\\\/teeptrak.com\\\/wp-content\\\/uploads\\\/2026\\\/07\\\/TeepTrak_Logo-PNG-1-scaled.png\",\"width\":2880,\"height\":528,\"caption\":\"TeepTrak\"},\"image\":{\"@id\":\"https:\\\/\\\/teeptrak.com\\\/en\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/x.com\\\/teeptrak\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/teeptrak\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/teeptrakinternational\\\/\",\"https:\\\/\\\/www.youtube.com\\\/@teeptrak\\\/videos\",\"https:\\\/\\\/www.instagram.com\\\/teeptrak\\\/\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/teeptrak.com\\\/en\\\/#\\\/schema\\\/person\\\/16457721232fa60fce067cf0a95a95d8\",\"name\":\"Alyssa Fleurette\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/ac9dbd3bd4dd1699205324f9604e5cfe3ba1c748b1b7c2b2c06326350e48e966?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/ac9dbd3bd4dd1699205324f9604e5cfe3ba1c748b1b7c2b2c06326350e48e966?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/ac9dbd3bd4dd1699205324f9604e5cfe3ba1c748b1b7c2b2c06326350e48e966?s=96&d=mm&r=g\",\"caption\":\"Alyssa Fleurette\"}}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Sustaining SMED gains after the project","description":"After a SMED project, changeover time often drifts back. How to track it machine by machine, with reviews at 3 and 6 months.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/teeptrak.com\/en\/sustaining-smed-gains-changeover-tracking\/","og_locale":"en_US","og_type":"article","og_title":"Sustaining SMED gains after the project","og_description":"After a SMED project, changeover time often drifts back. How to track it machine by machine, with reviews at 3 and 6 months.","og_url":"https:\/\/teeptrak.com\/en\/sustaining-smed-gains-changeover-tracking\/","og_site_name":"TEEPTRAK","article_published_time":"2026-11-02T09:41:42+00:00","og_image":[{"width":1600,"height":900,"url":"https:\/\/teeptrak.com\/wp-content\/uploads\/2026\/11\/teeptrak-smed-durabilite-en.png","type":"image\/png"}],"author":"Alyssa Fleurette","twitter_card":"summary_large_image","twitter_creator":"@teeptrak","twitter_site":"@teeptrak","twitter_misc":{"Written by":"Alyssa Fleurette","Est. reading time":"7 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/teeptrak.com\/en\/sustaining-smed-gains-changeover-tracking\/#article","isPartOf":{"@id":"https:\/\/teeptrak.com\/en\/sustaining-smed-gains-changeover-tracking\/"},"author":{"name":"Alyssa Fleurette","@id":"https:\/\/teeptrak.com\/en\/#\/schema\/person\/16457721232fa60fce067cf0a95a95d8"},"headline":"Sustaining SMED gains: measure every changeover after the project","datePublished":"2026-11-02T09:41:42+00:00","mainEntityOfPage":{"@id":"https:\/\/teeptrak.com\/en\/sustaining-smed-gains-changeover-tracking\/"},"wordCount":1518,"publisher":{"@id":"https:\/\/teeptrak.com\/en\/#organization"},"image":{"@id":"https:\/\/teeptrak.com\/en\/sustaining-smed-gains-changeover-tracking\/#primaryimage"},"thumbnailUrl":"https:\/\/teeptrak.com\/wp-content\/uploads\/2026\/11\/teeptrak-smed-durabilite-en.png","articleSection":["Lean Manufacturing"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/teeptrak.com\/en\/sustaining-smed-gains-changeover-tracking\/","url":"https:\/\/teeptrak.com\/en\/sustaining-smed-gains-changeover-tracking\/","name":"Sustaining SMED gains after the project","isPartOf":{"@id":"https:\/\/teeptrak.com\/en\/#website"},"primaryImageOfPage":{"@id":"https:\/\/teeptrak.com\/en\/sustaining-smed-gains-changeover-tracking\/#primaryimage"},"image":{"@id":"https:\/\/teeptrak.com\/en\/sustaining-smed-gains-changeover-tracking\/#primaryimage"},"thumbnailUrl":"https:\/\/teeptrak.com\/wp-content\/uploads\/2026\/11\/teeptrak-smed-durabilite-en.png","datePublished":"2026-11-02T09:41:42+00:00","description":"After a SMED project, changeover time often drifts back. How to track it machine by machine, with reviews at 3 and 6 months.","breadcrumb":{"@id":"https:\/\/teeptrak.com\/en\/sustaining-smed-gains-changeover-tracking\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/teeptrak.com\/en\/sustaining-smed-gains-changeover-tracking\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/teeptrak.com\/en\/sustaining-smed-gains-changeover-tracking\/#primaryimage","url":"https:\/\/teeptrak.com\/wp-content\/uploads\/2026\/11\/teeptrak-smed-durabilite-en.png","contentUrl":"https:\/\/teeptrak.com\/wp-content\/uploads\/2026\/11\/teeptrak-smed-durabilite-en.png","width":1600,"height":900,"caption":"Four-step method to sustain SMED gains: lock the reference, measure every changeover, review at 3 months, decide at 6 months"},{"@type":"BreadcrumbList","@id":"https:\/\/teeptrak.com\/en\/sustaining-smed-gains-changeover-tracking\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Accueil","item":"https:\/\/teeptrak.com\/en\/"},{"@type":"ListItem","position":2,"name":"Sustaining SMED gains: measure every changeover after the project"}]},{"@type":"WebSite","@id":"https:\/\/teeptrak.com\/en\/#website","url":"https:\/\/teeptrak.com\/en\/","name":"TEEPTRAK","description":"Optimisez votre potentiel industriel","publisher":{"@id":"https:\/\/teeptrak.com\/en\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/teeptrak.com\/en\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/teeptrak.com\/en\/#organization","name":"TeepTrak","url":"https:\/\/teeptrak.com\/en\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/teeptrak.com\/en\/#\/schema\/logo\/image\/","url":"https:\/\/teeptrak.com\/wp-content\/uploads\/2026\/07\/TeepTrak_Logo-PNG-1-scaled.png","contentUrl":"https:\/\/teeptrak.com\/wp-content\/uploads\/2026\/07\/TeepTrak_Logo-PNG-1-scaled.png","width":2880,"height":528,"caption":"TeepTrak"},"image":{"@id":"https:\/\/teeptrak.com\/en\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/x.com\/teeptrak","https:\/\/www.linkedin.com\/company\/teeptrak\/","https:\/\/www.linkedin.com\/company\/teeptrakinternational\/","https:\/\/www.youtube.com\/@teeptrak\/videos","https:\/\/www.instagram.com\/teeptrak\/"]},{"@type":"Person","@id":"https:\/\/teeptrak.com\/en\/#\/schema\/person\/16457721232fa60fce067cf0a95a95d8","name":"Alyssa Fleurette","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/secure.gravatar.com\/avatar\/ac9dbd3bd4dd1699205324f9604e5cfe3ba1c748b1b7c2b2c06326350e48e966?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/ac9dbd3bd4dd1699205324f9604e5cfe3ba1c748b1b7c2b2c06326350e48e966?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/ac9dbd3bd4dd1699205324f9604e5cfe3ba1c748b1b7c2b2c06326350e48e966?s=96&d=mm&r=g","caption":"Alyssa Fleurette"}}]}},"_links":{"self":[{"href":"https:\/\/teeptrak.com\/en\/wp-json\/wp\/v2\/posts\/156646","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/teeptrak.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/teeptrak.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/teeptrak.com\/en\/wp-json\/wp\/v2\/users\/10"}],"replies":[{"embeddable":true,"href":"https:\/\/teeptrak.com\/en\/wp-json\/wp\/v2\/comments?post=156646"}],"version-history":[{"count":0,"href":"https:\/\/teeptrak.com\/en\/wp-json\/wp\/v2\/posts\/156646\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/teeptrak.com\/en\/wp-json\/wp\/v2\/media\/156636"}],"wp:attachment":[{"href":"https:\/\/teeptrak.com\/en\/wp-json\/wp\/v2\/media?parent=156646"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/teeptrak.com\/en\/wp-json\/wp\/v2\/categories?post=156646"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/teeptrak.com\/en\/wp-json\/wp\/v2\/tags?post=156646"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}