{"id":155983,"date":"2026-10-29T09:46:36","date_gmt":"2026-10-29T09:46:36","guid":{"rendered":"https:\/\/teeptrak.com\/injection-press-downtime-cycle-time-tracking\/"},"modified":"2026-10-29T09:46:36","modified_gmt":"2026-10-29T09:46:36","slug":"injection-press-downtime-cycle-time-tracking","status":"publish","type":"post","link":"https:\/\/teeptrak.com\/en\/injection-press-downtime-cycle-time-tracking\/","title":{"rendered":"Injection molding presses: tracking downtime and cycle time drift in real time"},"content":{"rendered":"<p>[et_pb_section fb_built=&#8221;1&#8243; _builder_version=&#8221;4.27&#8243;][et_pb_row][et_pb_column type=&#8221;4_4&#8243;][et_pb_text]<\/p>\n<p style=\"font-size:17px;line-height:1.8;color:#232120;margin-bottom:20px;\">This article is for production, maintenance and continuous improvement managers in plastic injection molding shops, and for plant managers running a fleet of presses. Your CMMS schedules preventive work and keeps the breakdown history, but your presses also lose time in stops lasting a few seconds and in cycles that creep longer without anyone logging it. It explains how to measure those losses in real time, press by press and mold by mold, and how to connect them to the work of maintenance.<\/p>\n<div style=\"background:#f7f5f3;border-left:4px solid #EB352B;border-radius:6px;padding:20px 24px;margin:24px 0 32px;\">\n<div style=\"font-size:15px;font-weight:bold;color:#232120;margin-bottom:10px;text-transform:uppercase;letter-spacing:1px;\">In short<\/div>\n<ul style=\"font-size:16px;line-height:1.7;color:#232120;margin:0;padding-left:20px;\">\n<li style=\"margin-bottom:6px;\">A CMMS documents declared stops and organizes maintenance.<\/li>\n<li style=\"margin-bottom:6px;\">Micro-stops and cycle time drift are almost never declared.<\/li>\n<li style=\"margin-bottom:6px;\">A reference cycle per mold and automatic measurement make them visible.<\/li>\n<li style=\"margin-bottom:6px;\">Maintenance gets dated facts, and the history stays in the CMMS.<\/li>\n<\/ul>\n<\/div>\n<h2 style=\"color:#232120;font-size:28px;margin-top:40px;margin-bottom:20px;\">What the CMMS documents, and what it does not see<\/h2>\n<blockquote style=\"border-left:5px solid #232120;background:#f7f5f3;margin:28px 0;padding:20px 26px;font-size:19px;line-height:1.7;color:#232120;font-style:normal;\"><p>Altensya, a French CMMS software publisher, published <a href=\"https:\/\/gmao.altensya.com\/gmao-plasturgie\" target=\"_blank\" rel=\"noopener\">GMAO plasturgie : maintenance des presses \u00e0 injecter<\/a> (in French). The page describes how to organize maintenance in an injection shop: preventive work by calendar or by cycle count, the mold managed as equipment attached to the press that carries it, spare parts linked to the intervention that consumed them, and auxiliaries (dryers, temperature control units, chillers) tracked as equipment in their own right. On stops, the principle is stated plainly: &#8220;L&#8217;arr\u00eat se d\u00e9clare sur l&#8217;\u00e9quipement qui a l\u00e2ch\u00e9, la presse, le moule ou le thermor\u00e9gulateur, avec sa dur\u00e9e et son motif.&#8221; (in other words: a stop is logged against the equipment that failed, whether the press, the mold or the temperature control unit, with its duration and reason).<\/p><\/blockquote>\n<p style=\"font-size:17px;line-height:1.8;color:#232120;margin-bottom:20px;\">That is the right rule for maintenance: a stop documented on the right asset feeds the history, MTBF and MTTR. Altensya is also clear about what its software does not do: it does not read press controls, PLCs or sensors, and it does not calculate OEE in real time. That leaves a zone that automatic measurement covers: losses too short or too gradual for an operator to think of logging. Their article provides the maintenance method; this one deals with measuring production time.<\/p>\n<h2 style=\"color:#232120;font-size:28px;margin-top:40px;margin-bottom:20px;\">Three losses no work order ever captures<\/h2>\n<p style=\"font-size:17px;line-height:1.8;color:#232120;margin-bottom:20px;\">On an injection press, long stops are visible and get logged: a hydraulic leak, a burnt-out nozzle heater band, a mold to pull. The following losses almost always fly under the radar.<\/p>\n<table style=\"width:100%;border-collapse:collapse;margin:24px 0;font-size:15px;\">\n<thead>\n<tr>\n<th style=\"background:#232120;color:#fff;padding:10px;text-align:left;border:1px solid #ddd;\">Loss<\/th>\n<th style=\"background:#232120;color:#fff;padding:10px;text-align:left;border:1px solid #ddd;\">What happens on the press<\/th>\n<th style=\"background:#232120;color:#fff;padding:10px;text-align:left;border:1px solid #ddd;\">Why nobody logs it<\/th>\n<th style=\"background:#232120;color:#fff;padding:10px;text-align:left;border:1px solid #ddd;\">What automatic measurement shows<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td style=\"padding:10px;border:1px solid #ddd;vertical-align:top;color:#232120;\">Micro-stops<\/td>\n<td style=\"padding:10px;border:1px solid #ddd;vertical-align:top;color:#232120;\">Part stuck in the cavity, sprue not ejected, pick-and-place robot fault, alarm reset at the control panel<\/td>\n<td style=\"padding:10px;border:1px solid #ddd;vertical-align:top;color:#232120;\">Each stop lasts from a few seconds to a minute; the operator restarts without opening a request<\/td>\n<td style=\"padding:10px;border:1px solid #ddd;vertical-align:top;color:#232120;\">Their count and cumulative duration by shift, by mold and by hour<\/td>\n<\/tr>\n<tr>\n<td style=\"padding:10px;border:1px solid #ddd;vertical-align:top;color:#232120;\">Cycle time drift<\/td>\n<td style=\"padding:10px;border:1px solid #ddd;vertical-align:top;color:#232120;\">Cooling or hold time extended after an adjustment, press running below the rate on the setup sheet<\/td>\n<td style=\"padding:10px;border:1px solid #ddd;vertical-align:top;color:#232120;\">The press is producing, no stop appears, the loss is spread over the whole day<\/td>\n<td style=\"padding:10px;border:1px solid #ddd;vertical-align:top;color:#232120;\">The gap between actual and reference cycle, and when it started<\/td>\n<\/tr>\n<tr>\n<td style=\"padding:10px;border:1px solid #ddd;vertical-align:top;color:#232120;\">Restart after a mold change<\/td>\n<td style=\"padding:10px;border:1px solid #ddd;vertical-align:top;color:#232120;\">Heat-up, purging, first parts scrapped, setting tweaks<\/td>\n<td style=\"padding:10px;border:1px solid #ddd;vertical-align:top;color:#232120;\">The changeover is logged, not the stabilization phase that follows<\/td>\n<td style=\"padding:10px;border:1px solid #ddd;vertical-align:top;color:#232120;\">The real time between the press stopping and its return to reference rate<\/td>\n<\/tr>\n<tr>\n<td style=\"padding:10px;border:1px solid #ddd;vertical-align:top;color:#232120;\">Waiting on auxiliaries<\/td>\n<td style=\"padding:10px;border:1px solid #ddd;vertical-align:top;color:#232120;\">Material not dry enough, temperature control unit off setpoint, empty hopper<\/td>\n<td style=\"padding:10px;border:1px solid #ddd;vertical-align:top;color:#232120;\">The stop is attributed to the press, or not attributed at all<\/td>\n<td style=\"padding:10px;border:1px solid #ddd;vertical-align:top;color:#232120;\">Repeated stops at the same hours or on the same molds, pointing to the asset at fault<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p style=\"font-size:17px;line-height:1.8;color:#232120;margin-bottom:20px;\">Taken one by one, these losses look negligible. For example, a press whose cycle goes from 30 to 32 seconds makes about 6% fewer parts, all day long, without a single stop being recorded.<\/p>\n<figure style=\"margin:32px 0;\"><img decoding=\"async\" src=\"https:\/\/teeptrak.com\/wp-content\/uploads\/2026\/10\/teeptrak-presses-injection-en.png\" alt=\"Four-step method to track stops and cycles on an injection molding press: reference cycle, automatic capture, stop qualification, handover to maintenance\" width=\"1600\" height=\"900\" style=\"width:100%;height:auto;border-radius:8px;\" loading=\"lazy\" \/><\/figure>\n<h2 style=\"color:#232120;font-size:28px;margin-top:40px;margin-bottom:20px;\">Step-by-step method to track stops and cycles on a press<\/h2>\n<p style=\"font-size:17px;line-height:1.8;color:#232120;margin-bottom:20px;\">Test the method on one or two presses, ideally the ones running the most heavily loaded molds, before extending it to the whole fleet.<\/p>\n<ol style=\"margin:0 0 20px 0;padding-left:24px;\">\n<li style=\"font-size:17px;line-height:1.8;color:#232120;margin-bottom:8px;\"><strong>Set a reference cycle time for each press and mold pair.<\/strong> It comes from the approved setup sheet, not from the observed average: an average already includes the drift you are trying to see.<\/li>\n<li style=\"font-size:17px;line-height:1.8;color:#232120;margin-bottom:8px;\"><strong>Define the micro-stop threshold.<\/strong> Beyond a given time without a cycle, the press is considered stopped. Write the threshold down, apply it to every shift and do not change it again.<\/li>\n<li style=\"font-size:17px;line-height:1.8;color:#232120;margin-bottom:8px;\"><strong>Capture the cycle automatically.<\/strong> One signal per cycle, for example the mold opening, is enough to rebuild the actual rate, stops and micro-stops across all shifts, nights and weekends included.<\/li>\n<li style=\"font-size:17px;line-height:1.8;color:#232120;margin-bottom:8px;\"><strong>Qualify long stops when they happen.<\/strong> The operator enters the reason at the press, using the same breakdown as the CMMS: press, mold, auxiliary. Measurement and maintenance then speak the same language.<\/li>\n<li style=\"font-size:17px;line-height:1.8;color:#232120;margin-bottom:8px;\"><strong>Review three indicators every week.<\/strong> The gap between actual and reference cycle, the number of micro-stops per shift, the downtime Pareto by mold. A mold that climbs this Pareto from one week to the next deserves a look before its next run.<\/li>\n<li style=\"font-size:17px;line-height:1.8;color:#232120;margin-bottom:8px;\"><strong>Hand over to maintenance what belongs to maintenance.<\/strong> Cycle drift linked to cooling, ejection micro-stops rising on one mold: the technician opens the work request in the CMMS, and the asset history stays complete.<\/li>\n<\/ol>\n<h2 style=\"color:#232120;font-size:28px;margin-top:40px;margin-bottom:20px;\">Measurement and CMMS: who does what<\/h2>\n<p style=\"font-size:17px;line-height:1.8;color:#232120;margin-bottom:20px;\">The two do not overlap; they answer each other. The CMMS organizes upkeep: what, when, with which parts and against which history. Automatic measurement shows how the press actually used its time: producing, slowing down, stopped. In practice:<\/p>\n<ul style=\"margin:0 0 20px 0;padding-left:24px;\">\n<li style=\"font-size:17px;line-height:1.8;color:#232120;margin-bottom:8px;\"><strong>The cycle counter becomes reliable.<\/strong> Preventive work triggered by cycle count is only as accurate as the meter reading. An automatic cycle count per mold gives the technician a real value to enter rather than an estimate.<\/li>\n<li style=\"font-size:17px;line-height:1.8;color:#232120;margin-bottom:8px;\"><strong>Stop durations are measured, not reconstructed.<\/strong> The start and end of a long stop are timestamped, so the duration entered in the CMMS rests on a fact, and reliability indicators improve.<\/li>\n<li style=\"font-size:17px;line-height:1.8;color:#232120;margin-bottom:8px;\"><strong>Weak signals surface earlier.<\/strong> For example, ejection micro-stops rising week after week on the same mold point to a check of the ejector pins or vents before an outright failure.<\/li>\n<li style=\"font-size:17px;line-height:1.8;color:#232120;margin-bottom:8px;\"><strong>The effect of an intervention can be checked.<\/strong> After maintenance, does the press return to its reference cycle? The curve shows it from the next shift.<\/li>\n<\/ul>\n<h2 style=\"color:#232120;font-size:28px;margin-top:40px;margin-bottom:20px;\">Where TEEPTRAK fits: measuring, not planning maintenance<\/h2>\n<p style=\"font-size:17px;line-height:1.8;color:#232120;margin-bottom:20px;\">TEEPTRAK measures OEE, downtime and micro-stops on each press in real time, along with the actual rate compared to the reference rate. A module wired into the electrical cabinet and a sensor at the edge of the line take about one hour to install per machine, with no connection to the press PLC, and OEE is available within 48 hours. Every stop is timestamped with its duration, then qualified by the operator. TEEPTRAK is neither a CMMS nor an MES: it does not schedule preventive work, manage spare parts or run production orders. It provides the measurement of production time that production and maintenance can both rely on. It is used in more than 700 plants in over 30 countries, with on average 30% fewer unplanned stops.<\/p>\n<h3 style=\"color:#232120;font-size:22px;margin-top:32px;margin-bottom:14px;\">Further reading<\/h3>\n<ul style=\"margin:0 0 20px 0;padding-left:24px;\">\n<li style=\"font-size:17px;line-height:1.8;color:#232120;margin-bottom:8px;\"><a href=\"https:\/\/gmao.altensya.com\/gmao-plasturgie\" target=\"_blank\" rel=\"noopener\">GMAO plasturgie : maintenance des presses \u00e0 injecter<\/a> (Altensya, in French)<\/li>\n<li style=\"font-size:17px;line-height:1.8;color:#232120;margin-bottom:8px;\"><a href=\"https:\/\/teeptrak.com\/en\/ameliorer-oee-moulage-injection-strategies-solutions\/\">Improving OEE in Injection Molding: Effective Strategies and Solutions<\/a><\/li>\n<li style=\"font-size:17px;line-height:1.8;color:#232120;margin-bottom:8px;\"><a href=\"https:\/\/teeptrak.com\/en\/maintenance-downtime-tracking\/\">Maintenance Downtime Tracking: Using Equipment Stoppage Data to Optimise Your Maintenance Strategy<\/a><\/li>\n<\/ul>\n<h2 style=\"color:#232120;font-size:28px;margin-top:40px;margin-bottom:20px;\">FAQ<\/h2>\n<p style=\"font-size:17px;line-height:1.8;color:#232120;margin-bottom:20px;\"><strong>Do presses need to be connected to the CMMS to track stops?<\/strong> No. Stops and cycles can be measured with a sensor and a module that are independent of the press controls, without touching the PLC. The information maintenance needs is then entered into the CMMS by the teams, according to your internal rules.<\/p>\n<p style=\"font-size:17px;line-height:1.8;color:#232120;margin-bottom:20px;\"><strong>What micro-stop threshold should I use on an injection press?<\/strong> There is no universal value: the threshold depends on the cycle time of your molds. What matters is to write it down, apply it to every shift and never change it, otherwise trends are no longer comparable from one week to the next.<\/p>\n<p style=\"font-size:17px;line-height:1.8;color:#232120;margin-bottom:20px;\"><strong>Is cycle time drift a maintenance issue or a process setting issue?<\/strong> Both, depending on the cause. Longer cooling to compensate for a fouled cooling circuit is a mold maintenance issue; a lower rate after a material change is a setting issue. Measurement shows when the drift started, which helps decide.<\/p>\n<div style=\"background:#232120;color:white;padding:32px;border-radius:8px;margin:32px 0;text-align:center;\">\n<div style=\"font-size:18px;font-weight:bold;margin-bottom:8px;\">Your real OEE within days<\/div>\n<div style=\"font-size:14px;color:#ddd;margin-bottom:20px;\">Module wired in the electrical cabinet, sensor at the edge of the line, about one hour of installation per machine, no MES project and no production stop.<\/div>\n<p><a href=\"https:\/\/teeptrak.com\/fr\/demandez-une-demo\/\" style=\"display:inline-block;background:#EB352C;color:white;padding:14px 28px;text-decoration:none;border-radius:4px;font-weight:bold;\">Request a demo<\/a><\/div>\n<p><script type=\"application\/ld+json\">{\"@context\": \"https:\/\/schema.org\", \"@type\": \"FAQPage\", \"mainEntity\": [{\"@type\": \"Question\", \"name\": \"Do presses need to be connected to the CMMS to track stops?\", \"acceptedAnswer\": {\"@type\": \"Answer\", \"text\": \"No. Stops and cycles can be measured with a sensor and a module that are independent of the press controls, without touching the PLC. The information maintenance needs is then entered into the CMMS by the teams, according to your internal rules.\"}}, {\"@type\": \"Question\", \"name\": \"What micro-stop threshold should I use on an injection press?\", \"acceptedAnswer\": {\"@type\": \"Answer\", \"text\": \"There is no universal value: the threshold depends on the cycle time of your molds. What matters is to write it down, apply it to every shift and never change it, otherwise trends are no longer comparable from one week to the next.\"}}, {\"@type\": \"Question\", \"name\": \"Is cycle time drift a maintenance issue or a process setting issue?\", \"acceptedAnswer\": {\"@type\": \"Answer\", \"text\": \"Both, depending on the cause. Longer cooling to compensate for a fouled cooling circuit is a mold maintenance issue; a lower rate after a material change is a setting issue. Measurement shows when the drift started, which helps decide.\"}}]}<\/script>[\/et_pb_text][\/et_pb_column][\/et_pb_row][\/et_pb_section]<\/p>\n","protected":false},"excerpt":{"rendered":"<p>[et_pb_section fb_built=&#8221;1&#8243; _builder_version=&#8221;4.27&#8243;][et_pb_row][et_pb_column type=&#8221;4_4&#8243;][et_pb_text] This article is for production, maintenance and continuous improvement managers in plastic injection molding shops, and for plant managers running a fleet of presses. Your CMMS schedules preventive work and keeps the breakdown history, but your presses also lose time in stops lasting a few seconds and in cycles that creep [&hellip;]<\/p>\n","protected":false},"author":10,"featured_media":155973,"comment_status":"","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_yoast_wpseo_meta-robots-noindex":"","_yoast_wpseo_canonical":"","_et_pb_use_builder":"","_et_pb_old_content":"","_et_gb_content_width":"","ai_seo_title":"","ai_meta_description":"","ai_focus_keyword":"","footnotes":""},"categories":[129],"tags":[],"class_list":["post-155983","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-industrial-maintenance"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.8 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Injection Press Downtime and Cycle Time Tracking<\/title>\n<meta name=\"description\" content=\"Micro-stops, creeping cycle times, slow restarts after mold changes: how to measure injection press losses and connect them to your CMMS.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/teeptrak.com\/en\/injection-press-downtime-cycle-time-tracking\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Injection Press Downtime and Cycle Time Tracking\" \/>\n<meta property=\"og:description\" content=\"Micro-stops, creeping cycle times, slow restarts after mold changes: how to measure injection press losses and connect them to your CMMS.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/teeptrak.com\/en\/injection-press-downtime-cycle-time-tracking\/\" \/>\n<meta property=\"og:site_name\" content=\"TEEPTRAK\" \/>\n<meta property=\"article:published_time\" content=\"2026-10-29T09:46:36+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/teeptrak.com\/wp-content\/uploads\/2026\/10\/teeptrak-presses-injection-en.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1600\" \/>\n\t<meta property=\"og:image:height\" content=\"900\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"Alyssa Fleurette\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:creator\" content=\"@teeptrak\" \/>\n<meta name=\"twitter:site\" content=\"@teeptrak\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Alyssa Fleurette\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"7 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/teeptrak.com\\\/en\\\/injection-press-downtime-cycle-time-tracking\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/teeptrak.com\\\/en\\\/injection-press-downtime-cycle-time-tracking\\\/\"},\"author\":{\"name\":\"Alyssa Fleurette\",\"@id\":\"https:\\\/\\\/teeptrak.com\\\/en\\\/#\\\/schema\\\/person\\\/16457721232fa60fce067cf0a95a95d8\"},\"headline\":\"Injection molding presses: tracking downtime and cycle time drift in real time\",\"datePublished\":\"2026-10-29T09:46:36+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/teeptrak.com\\\/en\\\/injection-press-downtime-cycle-time-tracking\\\/\"},\"wordCount\":1405,\"publisher\":{\"@id\":\"https:\\\/\\\/teeptrak.com\\\/en\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/teeptrak.com\\\/en\\\/injection-press-downtime-cycle-time-tracking\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/teeptrak.com\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/teeptrak-presses-injection-en.png\",\"articleSection\":[\"Industrial maintenance\"],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/teeptrak.com\\\/en\\\/injection-press-downtime-cycle-time-tracking\\\/\",\"url\":\"https:\\\/\\\/teeptrak.com\\\/en\\\/injection-press-downtime-cycle-time-tracking\\\/\",\"name\":\"Injection Press Downtime and Cycle Time Tracking\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/teeptrak.com\\\/en\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/teeptrak.com\\\/en\\\/injection-press-downtime-cycle-time-tracking\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/teeptrak.com\\\/en\\\/injection-press-downtime-cycle-time-tracking\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/teeptrak.com\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/teeptrak-presses-injection-en.png\",\"datePublished\":\"2026-10-29T09:46:36+00:00\",\"description\":\"Micro-stops, creeping cycle times, slow restarts after mold changes: how to measure injection press losses and connect them to your CMMS.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/teeptrak.com\\\/en\\\/injection-press-downtime-cycle-time-tracking\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/teeptrak.com\\\/en\\\/injection-press-downtime-cycle-time-tracking\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/teeptrak.com\\\/en\\\/injection-press-downtime-cycle-time-tracking\\\/#primaryimage\",\"url\":\"https:\\\/\\\/teeptrak.com\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/teeptrak-presses-injection-en.png\",\"contentUrl\":\"https:\\\/\\\/teeptrak.com\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/teeptrak-presses-injection-en.png\",\"width\":1600,\"height\":900,\"caption\":\"Four-step method to track stops and cycles on an injection molding press: reference cycle, automatic capture, stop qualification, handover to maintenance\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/teeptrak.com\\\/en\\\/injection-press-downtime-cycle-time-tracking\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Accueil\",\"item\":\"https:\\\/\\\/teeptrak.com\\\/en\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Injection molding presses: tracking downtime and cycle time drift in real time\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/teeptrak.com\\\/en\\\/#website\",\"url\":\"https:\\\/\\\/teeptrak.com\\\/en\\\/\",\"name\":\"TEEPTRAK\",\"description\":\"Optimisez votre potentiel industriel\",\"publisher\":{\"@id\":\"https:\\\/\\\/teeptrak.com\\\/en\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/teeptrak.com\\\/en\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/teeptrak.com\\\/en\\\/#organization\",\"name\":\"TeepTrak\",\"url\":\"https:\\\/\\\/teeptrak.com\\\/en\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/teeptrak.com\\\/en\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/teeptrak.com\\\/wp-content\\\/uploads\\\/2026\\\/07\\\/TeepTrak_Logo-PNG-1-scaled.png\",\"contentUrl\":\"https:\\\/\\\/teeptrak.com\\\/wp-content\\\/uploads\\\/2026\\\/07\\\/TeepTrak_Logo-PNG-1-scaled.png\",\"width\":2880,\"height\":528,\"caption\":\"TeepTrak\"},\"image\":{\"@id\":\"https:\\\/\\\/teeptrak.com\\\/en\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/x.com\\\/teeptrak\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/teeptrak\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/teeptrakinternational\\\/\",\"https:\\\/\\\/www.youtube.com\\\/@teeptrak\\\/videos\",\"https:\\\/\\\/www.instagram.com\\\/teeptrak\\\/\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/teeptrak.com\\\/en\\\/#\\\/schema\\\/person\\\/16457721232fa60fce067cf0a95a95d8\",\"name\":\"Alyssa Fleurette\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/ac9dbd3bd4dd1699205324f9604e5cfe3ba1c748b1b7c2b2c06326350e48e966?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/ac9dbd3bd4dd1699205324f9604e5cfe3ba1c748b1b7c2b2c06326350e48e966?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/ac9dbd3bd4dd1699205324f9604e5cfe3ba1c748b1b7c2b2c06326350e48e966?s=96&d=mm&r=g\",\"caption\":\"Alyssa Fleurette\"}}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Injection Press Downtime and Cycle Time Tracking","description":"Micro-stops, creeping cycle times, slow restarts after mold changes: how to measure injection press losses and connect them to your CMMS.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/teeptrak.com\/en\/injection-press-downtime-cycle-time-tracking\/","og_locale":"en_US","og_type":"article","og_title":"Injection Press Downtime and Cycle Time Tracking","og_description":"Micro-stops, creeping cycle times, slow restarts after mold changes: how to measure injection press losses and connect them to your CMMS.","og_url":"https:\/\/teeptrak.com\/en\/injection-press-downtime-cycle-time-tracking\/","og_site_name":"TEEPTRAK","article_published_time":"2026-10-29T09:46:36+00:00","og_image":[{"width":1600,"height":900,"url":"https:\/\/teeptrak.com\/wp-content\/uploads\/2026\/10\/teeptrak-presses-injection-en.png","type":"image\/png"}],"author":"Alyssa Fleurette","twitter_card":"summary_large_image","twitter_creator":"@teeptrak","twitter_site":"@teeptrak","twitter_misc":{"Written by":"Alyssa Fleurette","Est. reading time":"7 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/teeptrak.com\/en\/injection-press-downtime-cycle-time-tracking\/#article","isPartOf":{"@id":"https:\/\/teeptrak.com\/en\/injection-press-downtime-cycle-time-tracking\/"},"author":{"name":"Alyssa Fleurette","@id":"https:\/\/teeptrak.com\/en\/#\/schema\/person\/16457721232fa60fce067cf0a95a95d8"},"headline":"Injection molding presses: tracking downtime and cycle time drift in real time","datePublished":"2026-10-29T09:46:36+00:00","mainEntityOfPage":{"@id":"https:\/\/teeptrak.com\/en\/injection-press-downtime-cycle-time-tracking\/"},"wordCount":1405,"publisher":{"@id":"https:\/\/teeptrak.com\/en\/#organization"},"image":{"@id":"https:\/\/teeptrak.com\/en\/injection-press-downtime-cycle-time-tracking\/#primaryimage"},"thumbnailUrl":"https:\/\/teeptrak.com\/wp-content\/uploads\/2026\/10\/teeptrak-presses-injection-en.png","articleSection":["Industrial maintenance"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/teeptrak.com\/en\/injection-press-downtime-cycle-time-tracking\/","url":"https:\/\/teeptrak.com\/en\/injection-press-downtime-cycle-time-tracking\/","name":"Injection Press Downtime and Cycle Time Tracking","isPartOf":{"@id":"https:\/\/teeptrak.com\/en\/#website"},"primaryImageOfPage":{"@id":"https:\/\/teeptrak.com\/en\/injection-press-downtime-cycle-time-tracking\/#primaryimage"},"image":{"@id":"https:\/\/teeptrak.com\/en\/injection-press-downtime-cycle-time-tracking\/#primaryimage"},"thumbnailUrl":"https:\/\/teeptrak.com\/wp-content\/uploads\/2026\/10\/teeptrak-presses-injection-en.png","datePublished":"2026-10-29T09:46:36+00:00","description":"Micro-stops, creeping cycle times, slow restarts after mold changes: how to measure injection press losses and connect them to your CMMS.","breadcrumb":{"@id":"https:\/\/teeptrak.com\/en\/injection-press-downtime-cycle-time-tracking\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/teeptrak.com\/en\/injection-press-downtime-cycle-time-tracking\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/teeptrak.com\/en\/injection-press-downtime-cycle-time-tracking\/#primaryimage","url":"https:\/\/teeptrak.com\/wp-content\/uploads\/2026\/10\/teeptrak-presses-injection-en.png","contentUrl":"https:\/\/teeptrak.com\/wp-content\/uploads\/2026\/10\/teeptrak-presses-injection-en.png","width":1600,"height":900,"caption":"Four-step method to track stops and cycles on an injection molding press: reference cycle, automatic capture, stop qualification, handover to maintenance"},{"@type":"BreadcrumbList","@id":"https:\/\/teeptrak.com\/en\/injection-press-downtime-cycle-time-tracking\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Accueil","item":"https:\/\/teeptrak.com\/en\/"},{"@type":"ListItem","position":2,"name":"Injection molding presses: tracking downtime and cycle time drift in real time"}]},{"@type":"WebSite","@id":"https:\/\/teeptrak.com\/en\/#website","url":"https:\/\/teeptrak.com\/en\/","name":"TEEPTRAK","description":"Optimisez votre potentiel industriel","publisher":{"@id":"https:\/\/teeptrak.com\/en\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/teeptrak.com\/en\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/teeptrak.com\/en\/#organization","name":"TeepTrak","url":"https:\/\/teeptrak.com\/en\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/teeptrak.com\/en\/#\/schema\/logo\/image\/","url":"https:\/\/teeptrak.com\/wp-content\/uploads\/2026\/07\/TeepTrak_Logo-PNG-1-scaled.png","contentUrl":"https:\/\/teeptrak.com\/wp-content\/uploads\/2026\/07\/TeepTrak_Logo-PNG-1-scaled.png","width":2880,"height":528,"caption":"TeepTrak"},"image":{"@id":"https:\/\/teeptrak.com\/en\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/x.com\/teeptrak","https:\/\/www.linkedin.com\/company\/teeptrak\/","https:\/\/www.linkedin.com\/company\/teeptrakinternational\/","https:\/\/www.youtube.com\/@teeptrak\/videos","https:\/\/www.instagram.com\/teeptrak\/"]},{"@type":"Person","@id":"https:\/\/teeptrak.com\/en\/#\/schema\/person\/16457721232fa60fce067cf0a95a95d8","name":"Alyssa Fleurette","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/secure.gravatar.com\/avatar\/ac9dbd3bd4dd1699205324f9604e5cfe3ba1c748b1b7c2b2c06326350e48e966?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/ac9dbd3bd4dd1699205324f9604e5cfe3ba1c748b1b7c2b2c06326350e48e966?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/ac9dbd3bd4dd1699205324f9604e5cfe3ba1c748b1b7c2b2c06326350e48e966?s=96&d=mm&r=g","caption":"Alyssa Fleurette"}}]}},"_links":{"self":[{"href":"https:\/\/teeptrak.com\/en\/wp-json\/wp\/v2\/posts\/155983","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/teeptrak.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/teeptrak.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/teeptrak.com\/en\/wp-json\/wp\/v2\/users\/10"}],"replies":[{"embeddable":true,"href":"https:\/\/teeptrak.com\/en\/wp-json\/wp\/v2\/comments?post=155983"}],"version-history":[{"count":0,"href":"https:\/\/teeptrak.com\/en\/wp-json\/wp\/v2\/posts\/155983\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/teeptrak.com\/en\/wp-json\/wp\/v2\/media\/155973"}],"wp:attachment":[{"href":"https:\/\/teeptrak.com\/en\/wp-json\/wp\/v2\/media?parent=155983"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/teeptrak.com\/en\/wp-json\/wp\/v2\/categories?post=155983"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/teeptrak.com\/en\/wp-json\/wp\/v2\/tags?post=155983"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}